Cornwall · Roofing & Cladding

Cladding in Newquay

Guide price £5,100–£12,000 including VAT, typically 3 days to 3 weeks depending on area, with a free site survey and a written fixed price.

Charcoal composite cladding on the upper storey of a house extension

Free survey in Newquay

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

Cladding is a protective outer layer of boards or panels, such as timber, composite, fibre cement or uPVC, fixed to battens on the outside of a wall to change its appearance, shed rain and, where insulation is added, reduce heat loss.

In Newquay, as anywhere in Cornwall, the price of cladding is driven mainly by size, materials and access. Across the South West our guide sits at £5,100–£12,000 with VAT, but restricted parking, a narrow side passage or extra preparation can move the figure either way. That is why every price we give follows a visit to the house.

Guide price
£5,100–£12,000 inc VAT
Time on site
3 days to 3 weeks depending on area
Postcodes
TR7
Planning rules
England
Local area
Cornwall
Survey
Free, with a written quote

Cladding prices in Newquay

These are guide costs, not quotes. For cladding in Newquay the range is £5,100–£12,000, VAT included, reflecting prices in the South West that are about 2% above the national guide. Once we have visited for a free survey, you get a firm figure for the scope you approve.

Type of jobWhat it usually involvesGuide in Newquay
Feature area or dormerA gable, dormer, bay or small feature wall in uPVC, timber or composite.£1,550–£5,100
Extension or upper storeyAbout 40–60m² of timber, composite or fibre cement with membrane and battens.£5,100–£12,000
Whole houseCladding most elevations of a house, often with added insulation.£12,000–£30,500

Expect these to shape the final quote:

  • Wall area to be clad and the height of the building
  • Cladding material and board profile
  • Insulation behind the cladding
  • Scaffolding, access and distance from boundaries

Scope of the work

  • Breather membrane and treated battens fixed to the wall
  • Insulation behind the cladding where agreed
  • Cavity barriers and fire-stopping where regulations require
  • Cladding boards fixed with suitable stainless or coated fixings
  • Corner trims, window reveals and ventilated top and bottom edges
  • Waste removal and a clean site on completion
Softwood timberTreated or thermally modified softwood boards with a natural look that weathers to silver.
Hardwood timberCedar, larch or oak boards that are naturally durable and attractive.
CompositeLow-maintenance boards made from wood fibre and plastic, in consistent colours.
Fibre cementNon-combustible boards that resist rot and pests, in painted or woodgrain finishes.

Building in Newquay

Older Cornish homes are often built of granite or slatey local stone, with slate roofs and sometimes slate-hung walls facing the weather. Cob cottages survive in places, Truro and Falmouth keep Georgian and Victorian streets, and many towns have rendered post-war houses, bungalows and newer estates on their edges.

Stone and cob properties often need breathable lime render, careful repointing and roof repairs. Post-war and newer homes commonly benefit from new windows, roofline renewal, external rendering and single-storey extensions.

None of this holds for every street in Newquay, which is why we look at your actual house before pricing cladding rather than assuming from its age alone.

Do you need permission in Newquay?

Newquay is in England, so the planning and building rules set out below are the ones that apply. We confirm the details with the council before we quote.

In England, re-rendering or cladding a house is often allowed without planning permission, but stone, render, timber, plastic or tile cladding is not permitted development in conservation areas, and listed buildings need consent.

If you render or re-clad more than 25% of an external wall, Building Regulations usually require the wall’s insulation to be improved where that is practical, and building control should be notified.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. A visit to your home

    A free survey comes first. It gives us what we need to price cladding properly, including dimensions, existing materials and access for deliveries, and gives you the chance to ask anything you like.

  2. Written quote

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for cladding.

  3. Getting ready

    With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Newquay property.

  4. On site to finish

    Our trades complete cladding while your point of contact keeps you updated. When everything is finished, we clear the site, take away waste and go through the result with you before handover.

How we work

Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.

Questions about cladding in Newquay

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

Can you clad over existing render or brick?

Cladding is usually fixed over existing render or brick using battens, as long as the wall is sound and dry. Loose render may need removing first so the fixings hold. The battens create a ventilated gap so any moisture can drain and dry. We check the wall during the survey and explain any preparation needed before cladding.

Which cladding material needs the least maintenance?

Fibre cement, composite and uPVC cladding need the least upkeep, usually just an occasional wash. Thermally modified and hardwood timber can be left to weather naturally to a silver-grey, which needs no treatment, but keeping the original colour means re-staining every few years. Painted timber needs repainting regularly. We explain the long-term care of each option.

How long does cladding take to install?

Cladding a small dormer or gable usually takes a few days, an extension or upper storey around one to two weeks, and a whole house two to three weeks or more. Scaffolding, insulation and detailing around many windows add time. Timber boards may need to acclimatise on site first. We give you a programme with the written quote.

How long will cladding take?

On a typical home, allow 3 days to 3 weeks depending on area. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Near Newquay

We cover every part of Newquay, including TR7, and nearby Truro, St Austell and Redruth. Wherever you are within that patch, the survey is free and the quote comes to you in writing.

Planning cladding in Newquay?

Not sure of your budget yet? Try our guide-price tool for cladding, then book a free survey in Newquay when you want a firm figure.

Call freeFree quote