How do the kitchens & interiors services compare?
| Service | Typical job | Guide price | Time on site |
|---|---|---|---|
| Kitchens | for a mid-range kitchen of about 5–7 linear metres of units, supplied and fitted | £8,000–£22,000 | 1–3 weeks on site |
| Bathrooms | for a typical family bathroom, supplied and fitted with tiling | £5,000–£12,000 | 1–2 weeks per bathroom |
| Flooring | for about 20–25m² of laminate, LVT or engineered wood, supplied and fitted with preparation | £1,200–£4,000 | 1–2 days per room, longer if levelling is needed |
National guides including VAT. Regional prices are shown on each local page and in the guide-price tool.
Frequently asked questions
How much does a new kitchen cost?
A mid-range kitchen of around 5–7 linear metres of units costs £8,000–£22,000 supplied and fitted. Value kitchens in smaller rooms cost less, and premium kitchens with stone worktops, an island and high-end appliances cost more. Moving the sink or hob, new electrics and replastering also affect the total. As a guide, allow roughly £1,000–£2,800 per linear metre of units plus fixed fitting costs. We confirm a fixed price after the survey.
How much does a new bathroom cost?
A typical family bathroom costs £5,000–£12,000 supplied and fitted, including tiling, a new suite, shower, lighting and an extractor fan. Shower rooms and simple en-suites cost a little less, while wet rooms, standalone baths and large-format tiles cost more. Moving the toilet or replacing rotten floorboards adds to the total. We confirm a fixed price for the agreed specification after the survey.
How much does new flooring cost?
New flooring for a typical 20–25m² room costs £1,200–£4,000 supplied and fitted, depending on the material and the state of the subfloor. As a guide, allow roughly £45–£140 per square metre including underlay and fitting, with laminate at the lower end and engineered or solid wood at the top. Herringbone patterns, levelling and stairs add cost. We confirm a fixed price after measuring each room.