Cladding is a protective outer layer of boards or panels, such as timber, composite, fibre cement or uPVC, fixed to battens on the outside of a wall to change its appearance, shed rain and, where insulation is added, reduce heat loss.
Homeowners in Stockton-on-Tees usually consider cladding for one of a few reasons: something has worn out, the house no longer suits the way they live, or they are getting it ready to sell. We visit, agree a specification and put a fixed price in writing. Most jobs like this take 3 days to 3 weeks depending on area, and we work across County Durham, including Billingham, Thornaby-on-Tees and Middlesbrough.
- Guide price
- £4,500–£11,000 inc VAT
- Time on site
- 3 days to 3 weeks depending on area
- Postcodes
- TS17, TS18, TS19 and TS20
- Planning rules
- England
- Local area
- County Durham
- Survey
- Free, with a written quote
How much does cladding cost in Stockton-on-Tees?
No two jobs cost exactly the same, but the ranges below give a fair picture of cladding in Stockton-on-Tees. Pricing for the North East runs about 10% below the national guide, and the overall guide is £4,500–£11,000 with VAT included. We'll confirm your figure after surveying the property for free.
| Type of job | What it usually involves | Guide in Stockton-on-Tees |
|---|---|---|
| Feature area or dormer | A gable, dormer, bay or small feature wall in uPVC, timber or composite. | £1,350–£4,500 |
| Extension or upper storey | About 40–60m² of timber, composite or fibre cement with membrane and battens. | £4,500–£11,000 |
| Whole house | Cladding most elevations of a house, often with added insulation. | £11,000–£27,000 |
Expect these to shape the final quote:
- Wall area to be clad and the height of the building
- Cladding material and board profile
- Insulation behind the cladding
- Scaffolding, access and distance from boundaries
What’s included?
- Survey of the wall, boundaries, damp and window details
- Scaffolding or access towers as needed
- Breather membrane and treated battens fixed to the wall
- Insulation behind the cladding where agreed
- Cladding boards fixed with suitable stainless or coated fixings
- Waste removal and a clean site on completion
What are homes like around Stockton-on-Tees?
Colliery villages across County Durham are lined with brick and stone terraces, many built for mining families. Durham City has Georgian and Victorian streets, Darlington has Victorian terraces and villas, and Peterlee and Newton Aycliffe were planned as post-war new towns. Dales farmhouses in Weardale and Teesdale are stone, often under stone or slate roofs.
Winters are cold and the upland dales see snow and strong winds; former coal workings mean ground checks can be needed before building extensions.
With that background in mind, here is how we typically handle cladding for homes in Stockton-on-Tees, from the first visit to the finished result.
Do you need permission in Stockton-on-Tees?
For anyone in Stockton-on-Tees, the relevant framework is England's. The summary below is general, so we always contact the council about your address before putting a price in writing.
In England, re-rendering or cladding a house is often allowed without planning permission, but stone, render, timber, plastic or tile cladding is not permitted development in conservation areas, and listed buildings need consent.
If you render or re-clad more than 25% of an external wall, Building Regulations usually require the wall’s insulation to be improved where that is practical, and building control should be notified.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
What happens after you get in touch?
A visit to your home
First, someone visits your home in Stockton-on-Tees to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.
Your fixed price
The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.
Getting ready
With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Stockton-on-Tees property.
Build and hand over
On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.
Why homeowners choose us
Common questions
What happens at the survey?
We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from cladding, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.
How long does cladding take to install?
Cladding a small dormer or gable usually takes a few days, an extension or upper storey around one to two weeks, and a whole house two to three weeks or more. Scaffolding, insulation and detailing around many windows add time. Timber boards may need to acclimatise on site first. We give you a programme with the written quote.
Do you cover Billingham, Thornaby-on-Tees and Middlesbrough?
Yes. As well as Stockton-on-Tees, we cover Billingham, Thornaby-on-Tees and Middlesbrough and the rest of County Durham. Our coverage is UK-wide, so the process is the same wherever you are: a free site survey, a quote in writing that fixes the price for the agreed scope, and one point of contact while the work is planned and carried out.
Are there fire-safety rules for cladding?
Building regulations limit the fire-spread performance of cladding on walls close to a boundary and on taller buildings, which can rule out some timber or composite products in those positions. Cavity barriers behind the cladding also help stop fire spreading through the gap. Fibre cement is non-combustible. We check boundary distances and product data before recommending a material.
Will timber cladding change colour?
Untreated timber cladding naturally weathers to a silver-grey over a year or two as sunlight breaks down the surface. The change can be uneven at first, especially under eaves where rain does not reach. If you want to keep the original colour, a UV-protective stain or oil is needed and must be renewed every few years. Pre-weathered and coated boards are also available.
Nearby towns
Our coverage in Stockton-on-Tees includes TS17, TS18, TS19 and TS20. We also travel to Billingham, Thornaby-on-Tees and Middlesbrough, so neighbouring addresses are looked after on exactly the same terms as those in town.

