Greater Manchester · Roofing & Cladding

Cladding in Leigh

Cladding for homes in Leigh and nearby Atherton, Tyldesley and Golborne, from survey to handover.

Charcoal composite cladding on the upper storey of a house extension

Free survey in Leigh

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

Cladding is a protective outer layer of boards or panels, such as timber, composite, fibre cement or uPVC, fixed to battens on the outside of a wall to change its appearance, shed rain and, where insulation is added, reduce heat loss.

Thinking about cladding in Leigh? We take charge of the whole project, co-ordinating every trade involved, and one person keeps you updated. Guide prices for the North West sit at £4,800–£11,500 including VAT, and a typical job takes 3 days to 3 weeks depending on area. Your own figure depends on what the survey finds and the specification you settle on.

Guide price
£4,800–£11,500 inc VAT
Time on site
3 days to 3 weeks depending on area
Postcodes
WN7
Planning rules
England
Local area
Wigan
Survey
Free, with a written quote

Cladding prices in Leigh

Budgeting for cladding in Leigh? The numbers below include VAT and are adjusted for the North West, where costs are about 5% below the national guide. The headline range is £4,800–£11,500. Nothing is final until we have measured up at a free survey and agreed the specification with you.

Type of jobWhat it usually involvesGuide in Leigh
Feature area or dormerA gable, dormer, bay or small feature wall in uPVC, timber or composite.£1,400–£4,800
Extension or upper storeyAbout 40–60m² of timber, composite or fibre cement with membrane and battens.£4,800–£11,500
Whole houseCladding most elevations of a house, often with added insulation.£11,500–£28,500

Your price depends mostly on:

  • Wall area to be clad and the height of the building
  • Cladding material and board profile
  • Window reveals, corners and roof junctions to detail
  • Scaffolding, access and distance from boundaries

Scope of the work

  • Survey of the wall, boundaries, damp and window details
  • Breather membrane and treated battens fixed to the wall
  • Insulation behind the cladding where agreed
  • Cladding boards fixed with suitable stainless or coated fixings
  • Corner trims, window reveals and ventilated top and bottom edges
  • Waste removal and a clean site on completion
Hardwood timberCedar, larch or oak boards that are naturally durable and attractive.
CompositeLow-maintenance boards made from wood fibre and plastic, in consistent colours.
Fibre cementNon-combustible boards that resist rot and pests, in painted or woodgrain finishes.
uPVC claddingA lower-cost, easy-clean option for gables, dormers and small areas.

What are homes like around Leigh?

Rows of Victorian red-brick terraces fill much of Manchester, Salford and the mill towns, with stone terraces in the Pennine fringes around Oldham and Saddleworth. South Manchester has Edwardian semis and villas, Wythenshawe was built as a large interwar garden suburb, and city-centre apartments and new estates continue to grow.

Rainfall is high, especially near the Pennines, so brickwork, gutters and roof coverings take a steady soaking and freeze-thaw over winter.

In Leigh, as elsewhere in Greater Manchester, we take the building's age and construction into account before recommending anything, because both can change what is involved in cladding.

Do you need permission in Leigh?

The notes below cover England, which is where Leigh sits. Rules change and every property is different, so we speak to the council before pricing your job.

In England, re-rendering or cladding a house is often allowed without planning permission, but stone, render, timber, plastic or tile cladding is not permitted development in conservation areas, and listed buildings need consent.

If you render or re-clad more than 25% of an external wall, Building Regulations usually require the wall’s insulation to be improved where that is practical, and building control should be notified.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. A visit to your home

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about cladding.

  2. Quote in writing

    Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.

  3. Dates and permissions

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for cladding are in place before the first day on site.

  4. On site to finish

    The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.

What you can expect from us

Coverage across the UKWe take on projects in England, Wales, Scotland and Northern Ireland, and plan each one under the rules for the nation it is in.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Frequently asked questions

How long does cladding take to install?

Cladding a small dormer or gable usually takes a few days, an extension or upper storey around one to two weeks, and a whole house two to three weeks or more. Scaffolding, insulation and detailing around many windows add time. Timber boards may need to acclimatise on site first. We give you a programme with the written quote.

Are there fire-safety rules for cladding?

Building regulations limit the fire-spread performance of cladding on walls close to a boundary and on taller buildings, which can rule out some timber or composite products in those positions. Cavity barriers behind the cladding also help stop fire spreading through the gap. Fibre cement is non-combustible. We check boundary distances and product data before recommending a material.

Which postcodes in Leigh do you cover?

We cover WN7, along with the rest of Greater Manchester. If your postcode is not listed, get in touch anyway: our coverage is UK-wide, and we can usually arrange a survey wherever you live. Enter your postcode in the guide-price tool or contact form and we will confirm.

Can cladding improve insulation?

Cladding can improve insulation if insulation boards are fixed to the wall behind the battens, which reduces heat loss and can help with cold or damp internal walls. This adds thickness, so window reveals, sills and roof edges need careful detailing. Cladding alone, without insulation, adds very little warmth. We can price both options so you can compare.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from cladding, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

Near Leigh

Coverage for Leigh spans WN7. Close by, Atherton, Tyldesley and Golborne are covered too, and the rest of our UK-wide area follows the same survey-then-quote process from start to finish.

Ready for a written price?

For a fixed price on cladding in Leigh, the first step is a free survey. Contact us and we'll arrange a convenient visit.

Call freeFree quote