Cladding is a protective outer layer of boards or panels, such as timber, composite, fibre cement or uPVC, fixed to battens on the outside of a wall to change its appearance, shed rain and, where insulation is added, reduce heat loss.
Whatever prompted you to look into cladding, whether wear and tear, a growing family or plans to move, we can survey your Stratford home and give you a price in writing. Homes in London typically come in at £6,500–£15,500, VAT included, for this kind of work. We also cover Bow, Canning Town and Blackwall, and the same steps apply wherever you are in London.
- Guide price
- £6,500–£15,500 inc VAT
- Time on site
- 3 days to 3 weeks depending on area
- Postcodes
- E7, E12 and E15
- Planning rules
- England
- Local area
- Greater London
- Survey
- Free, with a written quote
Cladding prices in Stratford
Use the table to gauge the cost of cladding in Stratford before we visit. Figures include VAT and are scaled for London, coming out about 30% above the national guide, which gives £6,500–£15,500 overall. After a free survey, you receive a fixed written price.
| Type of job | What it usually involves | Guide in Stratford |
|---|---|---|
| Feature area or dormer | A gable, dormer, bay or small feature wall in uPVC, timber or composite. | £1,950–£6,500 |
| Extension or upper storey | About 40–60m² of timber, composite or fibre cement with membrane and battens. | £6,500–£15,500 |
| Whole house | Cladding most elevations of a house, often with added insulation. | £15,500–£39,000 |
Your price depends mostly on:
- Wall area to be clad and the height of the building
- Cladding material and board profile
- Insulation behind the cladding
- Window reveals, corners and roof junctions to detail
What do you get?
- Survey of the wall, boundaries, damp and window details
- Scaffolding or access towers as needed
- Breather membrane and treated battens fixed to the wall
- Insulation behind the cladding where agreed
- Corner trims, window reveals and ventilated top and bottom edges
- Waste removal and a clean site on completion
What are homes like around Stratford?
London's housing is dominated by Victorian and Edwardian terraces, often in yellow London stock brick, with Georgian terraces in central districts and mansion blocks across many inner areas. Outer boroughs have large belts of interwar semis, and there are extensive post-war council estates. Many houses have been split into flats, and conservation areas are widespread.
Terraces suit side-return extensions and rear dormer loft conversions; interwar semis commonly take hip-to-gable lofts. Shared party walls, restricted parking and conservation rules often shape the plans and the programme.
That mix of housing shapes how we approach cladding in Stratford: the age and construction of your home affect the materials, the method and, in the end, the price.
Do you need permission in Stratford?
As Stratford is in England, read the following with that system of planning and building control in mind. We check what applies to your house with the council before you receive a quote.
In England, re-rendering or cladding a house is often allowed without planning permission, but stone, render, timber, plastic or tile cladding is not permitted development in conservation areas, and listed buildings need consent.
If you render or re-clad more than 25% of an external wall, Building Regulations usually require the wall’s insulation to be improved where that is practical, and building control should be notified.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
What happens after you get in touch?
A visit to your home
It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about cladding.
Written quote
You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for cladding.
Booking the work
Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for cladding are in place before the first day on site.
The work itself
Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.
Working with SK Home Improvements
Common questions
How long does cladding take to install?
Cladding a small dormer or gable usually takes a few days, an extension or upper storey around one to two weeks, and a whole house two to three weeks or more. Scaffolding, insulation and detailing around many windows add time. Timber boards may need to acclimatise on site first. We give you a programme with the written quote.
Do I need planning permission in Stratford?
It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Stratford is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.
Do you cover Bow, Canning Town and Blackwall?
Yes. As well as Stratford, we cover Bow, Canning Town and Blackwall and the rest of London. Our coverage is UK-wide, so the process is the same wherever you are: a free site survey, a quote in writing that fixes the price for the agreed scope, and one point of contact while the work is planned and carried out.
Can you clad over existing render or brick?
Cladding is usually fixed over existing render or brick using battens, as long as the wall is sound and dry. Loose render may need removing first so the fixings hold. The battens create a ventilated gap so any moisture can drain and dry. We check the wall during the survey and explain any preparation needed before cladding.
Will timber cladding change colour?
Untreated timber cladding naturally weathers to a silver-grey over a year or two as sunlight breaks down the surface. The change can be uneven at first, especially under eaves where rain does not reach. If you want to keep the original colour, a UV-protective stain or oil is needed and must be renewed every few years. Pre-weathered and coated boards are also available.
Nearby towns
We cover every part of Stratford, including E7, E12 and E15, and nearby Bow, Canning Town and Blackwall. Wherever you are within that patch, the survey is free and the quote comes to you in writing.

