Cheshire · Extensions & Renovations

Double-storey extensions in Macclesfield

Guide price £57,000–£114,000 including VAT, typically 14–22 weeks on site, with a free site survey and a written fixed price.

Two-storey side extension on a brick semi-detached house

Free survey in Macclesfield

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

Macclesfield sits within our coverage for a double-storey extension, as do neighbouring Wilmslow, Congleton and Cheadle Hulme. Before giving a price we want to see the property: the condition of what's there now, the access, and anything that might need extra work. The guide range for the North West is £57,000–£114,000 including VAT, and your written quote will spell out exactly what that covers.

Guide price
£57,000–£114,000 inc VAT
Time on site
14–22 weeks on site
Postcodes
SK9, SK10 and SK11
Planning rules
England
Local area
Cheshire East
Survey
Free, with a written quote

What should you budget for a double-storey extension in Macclesfield?

In Macclesfield, guide figures for a double-storey extension sit at £57,000–£114,000, VAT included. We set them using rates for the North West, currently about 5% below the national guide. The table shows what pushes a project towards either end of the range; your own price is set after a free survey.

Type of jobWhat it usually involvesGuide in Macclesfield
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£38,000–£62,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£57,000–£114,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£95,000–£171,000

Expect these to shape the final quote:

  • Combined floor area across both storeys
  • How the new roof joins the existing roof
  • Bathrooms, en-suites and plumbing on the upper floor
  • Scaffolding duration, access and the level of finishes

What’s included?

  • Groundworks, foundations and below-ground drainage
  • Insulated cavity walls with brick or render to match the house
  • Roof structure tied into the existing roof, tiled to match
  • Scaffolding for the full build, erected and inspected
  • Windows, external doors, plastering and internal doors
  • Building control inspections and completion certificate
Rear two-storey extensionAdds depth at the back, often a kitchen-diner below and a bedroom above.
Side two-storey extensionUses space beside a detached or semi-detached house for a wider plan.
Over-garage extensionBuilds a new room above an existing garage, checking the foundations first.
Gable roofA simpler pitched roof with a triangular end wall, usually quicker to build.

Local housing and a double-storey extension

Chester mixes Georgian and Victorian terraces with black-and-white revival frontages, and red sandstone shows up across the west of the county. Crewe has railway-era brick terraces, Macclesfield has mill workers' cottages, and Wilmslow, Knutsford and Alderley Edge are known for large detached homes. Interwar semis and newer estates surround Warrington and Northwich.

Terraced and mill-era cottages often need repointing, roof work and loft space. Larger detached homes commonly take on kitchen extensions, bifold doors and garden landscaping, while interwar semis suit side extensions and replacement windows.

Whatever era your Macclesfield home dates from, we plan a double-storey extension around how it is actually built rather than a one-size-fits-all specification.

Permissions for a double-storey extension in Macclesfield

Which rules apply depends on where you live. For Macclesfield, the answer is England, and the points below reflect that; we verify them with the council before quoting.

In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.

Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. We look at the job

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a double-storey extension.

  2. Written quote

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Dates and permissions

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. On site to finish

    Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.

Why homeowners choose us

Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Common questions

Do I need planning permission for a two-storey extension?

Most two-storey extensions need planning permission, but it depends on the size, height and position, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. In England, a two-storey rear extension can sometimes be built under permitted development if it is no deeper than 3m and at least 7m from the rear boundary. We check what applies before quoting.

How long will a double-storey extension take?

On a typical home, allow 14–22 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Will the extension affect my neighbours?

A double-storey extension can affect neighbours' light, outlook and privacy, which is why planning departments look closely at height, depth and window positions. Side windows facing neighbours often need obscure glass. Work near a shared wall may also need party wall notices; the Party Wall etc. Act 1996 applies in England and Wales only. We talk through these points early so the design is realistic.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

How is the new roof joined to the existing house?

The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.

Nearby towns

From SK9, SK10 and SK11 to the edges of Macclesfield and on into Wilmslow, Congleton and Cheadle Hulme, we can arrange a site visit and a written quote for your project, planned around dates that work for you.

Planning a double-storey extension in Macclesfield?

For a fixed price on a double-storey extension in Macclesfield, the first step is a free survey. Contact us and we'll arrange a convenient visit.

Call freeFree quote