A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.
From a first conversation about a double-storey extension to the day the site is cleared, homeowners in Craigavon deal with us directly. We come out to measure up at no cost, explain the choices in plain terms and send a written quote. For context, comparable work in Northern Ireland usually falls within £52,000–£103,000 including VAT, and it is available across BT64, BT65 and BT66.
- Guide price
- £52,000–£103,000 inc VAT
- Time on site
- 14–22 weeks on site
- Postcodes
- BT64, BT65 and BT66
- Planning rules
- Northern Ireland
- Local area
- County Armagh
- Survey
- Free, with a written quote
How much does a double-storey extension cost in Craigavon?
Here is how the guide price for a double-storey extension breaks down in Craigavon. We start from national figures and adjust for Northern Ireland, which comes out about 14% below the national guide. The resulting range, VAT included, is £52,000–£103,000, and a survey, at no cost to you, firms it up.
| Type of job | What it usually involves | Guide in Craigavon |
|---|---|---|
| Small (15–20m² total) | A compact rear or side extension adding a small room on each floor. | £34,500–£56,000 |
| Typical (30–40m² total) | A larger kitchen or living room below with a double bedroom or en-suite above. | £52,000–£103,000 |
| Large (50m² plus total) | Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing. | £86,000–£155,000 |
Expect these to shape the final quote:
- Combined floor area across both storeys
- How the new roof joins the existing roof
- Foundation depth, ground conditions and drains to divert
- Scaffolding duration, access and the level of finishes
What does the job include in Craigavon?
- Groundworks, foundations and below-ground drainage
- Insulated cavity walls with brick or render to match the house
- First-floor joists, stud walls and new openings upstairs
- Roof structure tied into the existing roof, tiled to match
- Electrics, plumbing and heating by qualified trades, with certificates
- Windows, external doors, plastering and internal doors
What are homes like around Craigavon?
Armagh city has Georgian buildings, many in local limestone, around its historic centre. Portadown and Lurgan, linked by the Craigavon plan of the 1960s, have Victorian terraces, post-war estates and newer developments. The countryside is dotted with detached rural houses and bungalows, often finished in roughcast or render.
Rural bungalows and detached homes commonly take extensions, loft rooms, driveways and fencing. Terraces suit rear extensions and window replacement, and rendered houses often need re-rendering or painting.
In Craigavon, as elsewhere in County Armagh, we take the building's age and construction into account before recommending anything, because both can change what is involved in a double-storey extension.
Do you need permission in Craigavon?
Each UK nation sets its own consent rules, and Craigavon is in Northern Ireland. What follows is a plain summary; we check the specifics for your property with the council before pricing anything.
In Northern Ireland, two-storey extensions usually need planning permission from the council.
Building control approval is needed under the Building Regulations (Northern Ireland). There is no Party Wall Act in Northern Ireland.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
A visit to your home
We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a double-storey extension so the price reflects your home.
Price and scope agreed
Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.
Booking the work
Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.
On site to finish
During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.
What you can expect from us
Questions about a double-storey extension in Craigavon
Is the price fixed?
Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.
How is the new roof joined to the existing house?
The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.
Is a double-storey extension better value than single-storey?
A double-storey extension usually gives better value per square metre than a single-storey one, because the same foundations and roof serve twice the floor area. The overall cost is higher, and planning can be harder because of the effect on neighbours. If you might want an extra bedroom later, building both floors now avoids a second round of disruption and scaffolding.
How long will a double-storey extension take?
On a typical home, allow 14–22 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Can we live at home while it is built?
Most families stay at home during a double-storey extension. The new structure is built outside first, and we only break through into the existing rooms near the end, usually one floor at a time. Upstairs, this may mean a bedroom is out of use for a week or two. We fit dust screens, protect floors and stairs, and plan any time without water or power in advance.