A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.
Whether you live in one of the larger towns, such as Omagh, Strabane, Dungannon and Cookstown, or somewhere quieter in County Tyrone, the way we handle a double-storey extension is identical. We survey, agree the specification with you, and confirm a fixed price on paper. Everything is planned under the regulations in force in Northern Ireland, and guide costs in Northern Ireland sit at £52,000–£103,000 with VAT.
- Guide price
- £52,000–£103,000 inc VAT
- Time on site
- 14–22 weeks on site
- Planning rules
- Northern Ireland
- Price level
- About 14% below the national guide
- Towns listed
- 4
- Survey
- Free, with a written quote
How much does a double-storey extension cost in County Tyrone?
Prices for a double-storey extension vary from house to house, but in County Tyrone most projects fall within £52,000–£103,000 including VAT. That reflects costs in Northern Ireland, about 14% below the national guide. Treat the table as a budgeting aid; the written figure follows a survey we carry out for free.
| Type of job | What it usually involves | Guide in County Tyrone |
|---|---|---|
| Small (15–20m² total) | A compact rear or side extension adding a small room on each floor. | £34,500–£56,000 |
| Typical (30–40m² total) | A larger kitchen or living room below with a double bedroom or en-suite above. | £52,000–£103,000 |
| Large (50m² plus total) | Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing. | £86,000–£155,000 |
The main things that change the figure:
- Combined floor area across both storeys
- Bathrooms, en-suites and plumbing on the upper floor
- Foundation depth, ground conditions and drains to divert
- Scaffolding duration, access and the level of finishes
Scope of the work
- Groundworks, foundations and below-ground drainage
- First-floor joists, stud walls and new openings upstairs
- Roof structure tied into the existing roof, tiled to match
- Scaffolding for the full build, erected and inspected
- Electrics, plumbing and heating by qualified trades, with certificates
- Building control inspections and completion certificate
Homes in County Tyrone
Tyrone is largely rural, with detached houses and bungalows on individual plots across the countryside, many finished in render or roughcast. Omagh, Dungannon, Cookstown and Strabane have Victorian terraced streets, post-war estates and newer developments, and stone farmhouses survive in older rural areas.
Rural detached homes commonly take extensions, loft rooms, porches and driveways, and older houses may need re-roofing and re-rendering. Town terraces suit rear extensions and window replacement.
Wet and fairly cool, with upland exposure in the Sperrins and frost common through the winter months.
Planning and building rules in County Tyrone
Which rules apply depends on where you live. For County Tyrone, the answer is Northern Ireland, and the points below reflect that; we verify them with the council before quoting.
In Northern Ireland, two-storey extensions usually need planning permission from the council.
Building control approval is needed under the Building Regulations (Northern Ireland). There is no Party Wall Act in Northern Ireland.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
Free site survey
A free survey comes first. It gives us what we need to price a double-storey extension properly, including dimensions, existing materials and access for deliveries, and gives you the chance to ask anything you like.
Your fixed price
After the survey we send a quote for a double-storey extension that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.
Booking the work
Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a double-storey extension are in place before the first day on site.
Build and hand over
On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.
How we work
Frequently asked questions
What happens at the survey?
We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a double-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.
How long does a double-storey extension take?
A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.
How much does a double-storey extension cost?
A typical double-storey extension of 30–40m² across both floors costs £52,000–£103,000, built to a plastered finish. As a rough guide, allow around £1,400–£2,600 per square metre plus fixed costs for groundworks, scaffolding and fees. The second storey usually costs less per square metre than the first, because foundations and roof are shared. Bathrooms upstairs and a complex roof add most. We confirm a fixed price after the survey.
How is the new roof joined to the existing house?
The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.
Who do I deal with during the job?
One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.