Scotland · Extensions & Renovations

Double-storey extensions in Edinburgh and the Lothians

Guide price £58,000–£115,000 including VAT across Edinburgh and the Lothians, with a free site survey and a written fixed price.

Two-storey side extension on a brick semi-detached house

Free survey in Edinburgh and the Lothians

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

In Edinburgh and the Lothians, we price a double-storey extension against our guide for Scotland, £58,000–£115,000 including VAT, then adjust it once we have surveyed your home. We work across Edinburgh, Livingston, Musselburgh and Bathgate and the rest of the county or region. Planning and building control requirements follow the rules for Scotland, and we look into your property's position before a written quote is sent.

Guide price
£58,000–£115,000 inc VAT
Time on site
14–22 weeks on site
Planning rules
Scotland
Price level
About 4% below the national guide
Towns listed
7
Survey
Free, with a written quote

How much does a double-storey extension cost in Edinburgh and the Lothians?

To help you plan, we show what a double-storey extension typically costs in Edinburgh and the Lothians instead of holding figures back for a sales call. The range is £58,000–£115,000 with VAT, using rates in Scotland that are about 4% below the national guide. A free survey then fixes your actual price.

Type of jobWhat it usually involvesGuide in Edinburgh and the Lothians
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£38,500–£62,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£58,000–£115,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£96,000–£173,000

What moves the price up or down:

  • Combined floor area across both storeys
  • How the new roof joins the existing roof
  • Foundation depth, ground conditions and drains to divert
  • Scaffolding duration, access and the level of finishes

What’s included?

  • Groundworks, foundations and below-ground drainage
  • Insulated cavity walls with brick or render to match the house
  • First-floor joists, stud walls and new openings upstairs
  • Roof structure tied into the existing roof, tiled to match
  • Scaffolding for the full build, erected and inspected
  • Windows, external doors, plastering and internal doors
Side two-storey extensionUses space beside a detached or semi-detached house for a wider plan.
Over-garage extensionBuilds a new room above an existing garage, checking the foundations first.
Hipped roofA roof that slopes on every side, matching many semi-detached and detached homes.
Gable roofA simpler pitched roof with a triangular end wall, usually quicker to build.

Homes in Edinburgh and the Lothians

Edinburgh's New Town is a planned Georgian sandstone townscape within a World Heritage Site, and districts such as Marchmont and Leith have Victorian tenements. Bungalows and villas fill the suburbs, Midlothian has former mining villages, Livingston was built as a new town, and East Lothian villages often have red pantile roofs.

Listed and conservation-area homes need careful window and stone repairs. Bungalows commonly suit loft conversions and dormers, and suburban semis take extensions and garage conversions.

East-coast weather brings cold winds, haar and frost, and exposed hills around the city catch wind-driven rain.

Planning and building rules in Edinburgh and the Lothians

As Edinburgh and the Lothians is in Scotland, read the following with that system of planning and building control in mind. We check what applies to your house with the council before you receive a quote.

In Scotland, extensions of more than one storey are only permitted development in narrow cases (Class 1B, well away from the boundary they face and outside conservation areas), so most need planning permission.

A building warrant is required before work starts. Scotland has no Party Wall Act; neighbour and title issues are handled under general law.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. A visit to your home

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a double-storey extension.

  2. Price and scope agreed

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a double-storey extension.

  3. Getting ready

    Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.

  4. On site to finish

    The work is carried out to the agreed specification, with floors and furniture protected and the site kept tidy. At the end we clean up, walk through the finished job with you and hand over any certificates.

What you can expect from us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Frequently asked questions

How long does a double-storey extension take?

A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.

Do I need planning permission in Edinburgh and the Lothians?

It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Edinburgh and the Lothians is in Scotland, so Scotland's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.

How much will a double-storey extension cost in Edinburgh and the Lothians?

As a guide, expect to pay £58,000–£115,000 including VAT for a double-storey extension in Edinburgh and the Lothians. That range is adjusted for Scotland, which runs about 4% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.

Can the new upstairs room have its own bathroom?

A new upstairs room can usually have an en-suite, provided waste pipes can reach the soil stack or a new one can be installed. Running the waste pipe to the right falls is the main design question, and a pumped system is an option where gravity will not work. We plan bathroom positions at the design stage so pipes, ventilation and insulation are built in rather than added later.

Will the extension affect my neighbours?

A double-storey extension can affect neighbours' light, outlook and privacy, which is why planning departments look closely at height, depth and window positions. Side windows facing neighbours often need obscure glass. Work near a shared wall may also need party wall notices; the Party Wall etc. Act 1996 applies in England and Wales only. We talk through these points early so the design is realistic.

Towns in Edinburgh and the Lothians

Our coverage for a double-storey extension in Edinburgh and the Lothians includes the towns listed here. Each page explains guide costs, typical timings and the neighbouring places we also serve.

Planning a double-storey extension in Edinburgh and the Lothians?

Arrange a visit to your home in Edinburgh and the Lothians, at no charge. We'll measure up for a double-storey extension, talk through the options and follow up with a fixed price in writing.

Call freeFree quote