A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

If you live in Grays and are weighing up a double-storey extension, the starting point is a visit to measure up and talk through what you want, which costs nothing. We cover homes across DA10, RM16, RM17 and RM18, and a typical project of this kind in the East of England lands somewhere in the £63,000–£126,000 bracket, including VAT. The exact figure depends on size, access and the finish you choose.

Guide price
£63,000–£126,000 inc VAT
Time on site
14–22 weeks on site
Postcodes
DA10, RM16, RM17, RM18 and RM20
Planning rules
England
Local area
Thurrock
Survey
Free, with a written quote

How much does a double-storey extension cost in Grays?

Below is a breakdown of typical costs for a double-storey extension in Grays. Because rates in the East of England are about 5% above the national guide, the overall guide comes to £63,000–£126,000, including VAT. Size, materials and access move the figure, and a free-of-charge survey settles it.

Type of jobWhat it usually involvesGuide in Grays
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£42,000–£68,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£63,000–£126,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£105,000–£189,000

The main things that change the figure:

  • Combined floor area across both storeys
  • Bathrooms, en-suites and plumbing on the upper floor
  • Foundation depth, ground conditions and drains to divert
  • Scaffolding duration, access and the level of finishes

What’s included?

  • Insulated cavity walls with brick or render to match the house
  • First-floor joists, stud walls and new openings upstairs
  • Scaffolding for the full build, erected and inspected
  • Electrics, plumbing and heating by qualified trades, with certificates
  • Windows, external doors, plastering and internal doors
  • Building control inspections and completion certificate
Rear two-storey extensionAdds depth at the back, often a kitchen-diner below and a bedroom above.
Side two-storey extensionUses space beside a detached or semi-detached house for a wider plan.
Over-garage extensionBuilds a new room above an existing garage, checking the foundations first.
Hipped roofA roof that slopes on every side, matching many semi-detached and detached homes.

Building in Grays

Essex ranges from timber-framed and weatherboarded cottages in the north, some with decorative pargeting, to Victorian terraces in Colchester, Chelmsford and Southend. Basildon and Harlow were built as post-war new towns, much of the south-east has interwar suburbs and bungalows, and large new estates continue to appear around Chelmsford and Braintree.

Essex is one of the driest counties in England, and London Clay in the south shrinks in dry spells, so trees and foundation depth matter.

So when we survey a Grays property for a double-storey extension, the first step is working out how it was built and what has been changed since.

Permissions for a double-storey extension in Grays

England, Wales, Scotland and Northern Ireland each handle planning a little differently. Grays comes under England, covered below, and we raise any questions with the council before your quote is finalised.

In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.

Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. Survey and measure

    First, someone visits your home in Grays to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Quote in writing

    Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.

  3. Plan and prepare

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. The work itself

    The work is carried out to the agreed specification, with floors and furniture protected and the site kept tidy. At the end we clean up, walk through the finished job with you and hand over any certificates.

Why homeowners choose us

Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Double-storey extensions in Grays: questions

How long will a double-storey extension take?

On a typical home, allow 14–22 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Do I need planning permission in Grays?

It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Grays is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.

Can the new upstairs room have its own bathroom?

A new upstairs room can usually have an en-suite, provided waste pipes can reach the soil stack or a new one can be installed. Running the waste pipe to the right falls is the main design question, and a pumped system is an option where gravity will not work. We plan bathroom positions at the design stage so pipes, ventilation and insulation are built in rather than added later.

Do I need planning permission for a two-storey extension?

Most two-storey extensions need planning permission, but it depends on the size, height and position, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. In England, a two-storey rear extension can sometimes be built under permitted development if it is no deeper than 3m and at least 7m from the rear boundary. We check what applies before quoting.

Is a double-storey extension better value than single-storey?

A double-storey extension usually gives better value per square metre than a single-storey one, because the same foundations and roof serve twice the floor area. The overall cost is higher, and planning can be harder because of the effect on neighbours. If you might want an extra bedroom later, building both floors now avoids a second round of disruption and scaffolding.

Also covering areas around Grays

Addresses in DA10, RM16, RM17 and RM18 are all covered for Grays, along with South Ockendon, Gravesend and Dartford close by. Give us your postcode when you get in touch and we will confirm the details.

Ready for a written price?

Not sure of your budget yet? Try our guide-price tool for a double-storey extension, then book a free survey in Grays when you want a firm figure.

Call freeFree quote