Greater Manchester · Extensions & Renovations

Double-storey extensions in Urmston

From the first visit to the final check, a double-storey extension in Urmston is planned and managed for you.

Two-storey side extension on a brick semi-detached house

Free survey in Urmston

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

Thinking about a double-storey extension in Urmston? We take charge of the whole project, co-ordinating every trade involved, and one person keeps you updated. Guide prices for the North West sit at £57,000–£114,000 including VAT, and a typical job takes 14–22 weeks on site. Your own figure depends on what the survey finds and the specification you settle on.

Guide price
£57,000–£114,000 inc VAT
Time on site
14–22 weeks on site
Postcodes
M17, M32 and M41
Planning rules
England
Local area
Trafford
Survey
Free, with a written quote

What should you budget for a double-storey extension in Urmston?

What will a double-storey extension cost in Urmston? Our guide range is £57,000–£114,000 including VAT. That figure is adjusted for the North West, about 5% below the national guide, and is intended for planning a budget. A firm written price for your chosen specification follows a free survey at your home.

Type of jobWhat it usually involvesGuide in Urmston
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£38,000–£62,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£57,000–£114,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£95,000–£171,000

What moves the price up or down:

  • Combined floor area across both storeys
  • How the new roof joins the existing roof
  • Bathrooms, en-suites and plumbing on the upper floor
  • Foundation depth, ground conditions and drains to divert

What does the job include in Urmston?

  • First-floor joists, stud walls and new openings upstairs
  • Roof structure tied into the existing roof, tiled to match
  • Scaffolding for the full build, erected and inspected
  • Electrics, plumbing and heating by qualified trades, with certificates
  • Windows, external doors, plastering and internal doors
  • Building control inspections and completion certificate
Side two-storey extensionUses space beside a detached or semi-detached house for a wider plan.
Over-garage extensionBuilds a new room above an existing garage, checking the foundations first.
Hipped roofA roof that slopes on every side, matching many semi-detached and detached homes.
Gable roofA simpler pitched roof with a triangular end wall, usually quicker to build.

Local housing and a double-storey extension

Rows of Victorian red-brick terraces fill much of Manchester, Salford and the mill towns, with stone terraces in the Pennine fringes around Oldham and Saddleworth. South Manchester has Edwardian semis and villas, Wythenshawe was built as a large interwar garden suburb, and city-centre apartments and new estates continue to grow.

Rainfall is high, especially near the Pennines, so brickwork, gutters and roof coverings take a steady soaking and freeze-thaw over winter.

In Urmston, as elsewhere in Greater Manchester, we take the building's age and construction into account before recommending anything, because both can change what is involved in a double-storey extension.

Permissions for a double-storey extension in Urmston

Because Urmston falls under England's rules, the guidance below is the version relevant to you. Before sending a price, we check your property's position with the council.

In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.

Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. Survey and measure

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a double-storey extension.

  2. Quote in writing

    Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.

  3. Plan and prepare

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. The work itself

    Our trades complete a double-storey extension while your point of contact keeps you updated. When everything is finished, we clear the site, take away waste and go through the result with you before handover.

Why homeowners choose us

Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Frequently asked questions

How long does a double-storey extension take?

A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.

Can we live at home while it is built?

Most families stay at home during a double-storey extension. The new structure is built outside first, and we only break through into the existing rooms near the end, usually one floor at a time. Upstairs, this may mean a bedroom is out of use for a week or two. We fit dust screens, protect floors and stairs, and plan any time without water or power in advance.

How much will a double-storey extension cost in Urmston?

As a guide, expect to pay £57,000–£114,000 including VAT for a double-storey extension in Urmston. That range is adjusted for the North West, which runs about 5% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.

How is the new roof joined to the existing house?

The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.

Can you combine a double-storey extension with other work?

Yes. Because we manage several trades under one contract, we can plan a double-storey extension alongside other work on your Urmston home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.

Nearby towns

Our coverage in Urmston includes M17, M32 and M41. We also travel to Stretford, Sale and Eccles, so neighbouring addresses are looked after on exactly the same terms as those in town.

Ready for a written price?

Not sure of your budget yet? Try our guide-price tool for a double-storey extension, then book a free survey in Urmston when you want a firm figure.

Call freeFree quote