London · Extensions & Renovations

Double-storey extensions in Chingford

Covering E4, IG8, IG9 and N9 and the rest of Chingford. Guide price £78,000–£156,000 inc VAT, confirmed after a free survey.

Two-storey side extension on a brick semi-detached house

Free survey in Chingford

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

We take on a double-storey extension throughout Chingford and the surrounding E4, IG8, IG9 and N9 postcodes, as well as in Woodford Green, Edmonton and Walthamstow. The guide range for this work in London is £78,000–£156,000 including VAT; where your project falls depends on its size, the materials you pick and how easy the site is to reach. A free survey turns that range into a fixed figure.

Guide price
£78,000–£156,000 inc VAT
Time on site
14–22 weeks on site
Postcodes
E4, IG8, IG9 and N9
Planning rules
England
Local area
Greater London
Survey
Free, with a written quote

Double-storey extensions prices in Chingford

The costs listed here are typical for a double-storey extension around Chingford and include VAT. They reflect labour and material costs in London, about 30% above the national guide, giving a range of £78,000–£156,000. Exact pricing depends on your home, so we only fix it once a free site survey is done.

Type of jobWhat it usually involvesGuide in Chingford
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£52,000–£84,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£78,000–£156,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£130,000–£234,000

The main things that change the figure:

  • Combined floor area across both storeys
  • How the new roof joins the existing roof
  • Bathrooms, en-suites and plumbing on the upper floor
  • Scaffolding duration, access and the level of finishes

Scope of the work

  • Insulated cavity walls with brick or render to match the house
  • First-floor joists, stud walls and new openings upstairs
  • Roof structure tied into the existing roof, tiled to match
  • Electrics, plumbing and heating by qualified trades, with certificates
  • Windows, external doors, plastering and internal doors
  • Building control inspections and completion certificate
Side two-storey extensionUses space beside a detached or semi-detached house for a wider plan.
Over-garage extensionBuilds a new room above an existing garage, checking the foundations first.
Hipped roofA roof that slopes on every side, matching many semi-detached and detached homes.
Gable roofA simpler pitched roof with a triangular end wall, usually quicker to build.

Homes in London

London's housing is dominated by Victorian and Edwardian terraces, often in yellow London stock brick, with Georgian terraces in central districts and mansion blocks across many inner areas. Outer boroughs have large belts of interwar semis, and there are extensive post-war council estates. Many houses have been split into flats, and conservation areas are widespread.

London Clay shrinks and swells with the seasons, and street trees close to houses can contribute to movement, which affects foundation design.

These patterns matter for a double-storey extension: older walls, roofs and floors in Chingford can need different materials or extra preparation compared with newer homes.

Do you need permission in Chingford?

The notes below cover England, which is where Chingford sits. Rules change and every property is different, so we speak to the council before pricing your job.

In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.

Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. Survey and measure

    First, someone visits your home in Chingford to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Quote in writing

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Booking the work

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. Finish and handover

    Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.

What you can expect from us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Frequently asked questions

How long does a double-storey extension take?

A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

Can we live at home while it is built?

Most families stay at home during a double-storey extension. The new structure is built outside first, and we only break through into the existing rooms near the end, usually one floor at a time. Upstairs, this may mean a bedroom is out of use for a week or two. We fit dust screens, protect floors and stairs, and plan any time without water or power in advance.

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

Is a double-storey extension better value than single-storey?

A double-storey extension usually gives better value per square metre than a single-storey one, because the same foundations and roof serve twice the floor area. The overall cost is higher, and planning can be harder because of the effect on neighbours. If you might want an extra bedroom later, building both floors now avoids a second round of disruption and scaffolding.

Near Chingford

We welcome enquiries from all E4, IG8, IG9 and N9 postcodes in Chingford, plus Woodford Green, Edmonton and Walthamstow. Each one gets the same survey at no charge and a written price fixed for the work described.

Planning a double-storey extension in Chingford?

For a fixed price on a double-storey extension in Chingford, the first step is a free survey. Contact us and we'll arrange a convenient visit.

Call freeFree quote