London · Extensions & Renovations

Double-storey extensions in Uxbridge

Typical time on site: 14–22 weeks on site. Guide price in Uxbridge: £78,000–£156,000 including VAT.

Two-storey side extension on a brick semi-detached house

Free survey in Uxbridge

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

Getting a double-storey extension right in Uxbridge starts with understanding the house you already have: its age, how it was built and what has been altered over the years. We survey first, then commit on paper to a price that holds as long as the scope stays the same. Across London, guide prices run at £78,000–£156,000 including VAT, and homes in Ruislip, Hayes and Gerrards Cross are covered too.

Guide price
£78,000–£156,000 inc VAT
Time on site
14–22 weeks on site
Postcodes
SL0, UB8, UB9, UB10 and UB11
Planning rules
England
Local area
Greater London
Survey
Free, with a written quote

How much does a double-storey extension cost in Uxbridge?

Prices for a double-storey extension vary from house to house, but in Uxbridge most projects fall within £78,000–£156,000 including VAT. That reflects costs in London, about 30% above the national guide. Treat the table as a budgeting aid; the written figure follows a survey we carry out for free.

Type of jobWhat it usually involvesGuide in Uxbridge
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£52,000–£84,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£78,000–£156,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£130,000–£234,000

What moves the price up or down:

  • Combined floor area across both storeys
  • How the new roof joins the existing roof
  • Foundation depth, ground conditions and drains to divert
  • Scaffolding duration, access and the level of finishes

Scope of the work

  • Groundworks, foundations and below-ground drainage
  • First-floor joists, stud walls and new openings upstairs
  • Roof structure tied into the existing roof, tiled to match
  • Scaffolding for the full build, erected and inspected
  • Electrics, plumbing and heating by qualified trades, with certificates
  • Building control inspections and completion certificate
Rear two-storey extensionAdds depth at the back, often a kitchen-diner below and a bedroom above.
Side two-storey extensionUses space beside a detached or semi-detached house for a wider plan.
Hipped roofA roof that slopes on every side, matching many semi-detached and detached homes.
Gable roofA simpler pitched roof with a triangular end wall, usually quicker to build.

Building in Uxbridge

London's housing is dominated by Victorian and Edwardian terraces, often in yellow London stock brick, with Georgian terraces in central districts and mansion blocks across many inner areas. Outer boroughs have large belts of interwar semis, and there are extensive post-war council estates. Many houses have been split into flats, and conservation areas are widespread.

Terraces suit side-return extensions and rear dormer loft conversions; interwar semis commonly take hip-to-gable lofts. Shared party walls, restricted parking and conservation rules often shape the plans and the programme.

So when we survey a Uxbridge property for a double-storey extension, the first step is working out how it was built and what has been changed since.

Do you need permission in Uxbridge?

Each UK nation sets its own consent rules, and Uxbridge is in England. What follows is a plain summary; we check the specifics for your property with the council before pricing anything.

In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.

Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. Survey and measure

    We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a double-storey extension so the price reflects your home.

  2. Your fixed price

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Plan and prepare

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. The work itself

    The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.

Working with SK Home Improvements

Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Coverage across the UKWe take on projects in England, Wales, Scotland and Northern Ireland, and plan each one under the rules for the nation it is in.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Common questions

Is a double-storey extension better value than single-storey?

A double-storey extension usually gives better value per square metre than a single-storey one, because the same foundations and roof serve twice the floor area. The overall cost is higher, and planning can be harder because of the effect on neighbours. If you might want an extra bedroom later, building both floors now avoids a second round of disruption and scaffolding.

Do you cover Ruislip, Hayes and Gerrards Cross?

Yes. As well as Uxbridge, we cover Ruislip, Hayes and Gerrards Cross and the rest of London. Our coverage is UK-wide, so the process is the same wherever you are: a free site survey, a quote in writing that fixes the price for the agreed scope, and one point of contact while the work is planned and carried out.

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

Can the new upstairs room have its own bathroom?

A new upstairs room can usually have an en-suite, provided waste pipes can reach the soil stack or a new one can be installed. Running the waste pipe to the right falls is the main design question, and a pumped system is an option where gravity will not work. We plan bathroom positions at the design stage so pipes, ventilation and insulation are built in rather than added later.

Do I need planning permission for a two-storey extension?

Most two-storey extensions need planning permission, but it depends on the size, height and position, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. In England, a two-storey rear extension can sometimes be built under permitted development if it is no deeper than 3m and at least 7m from the rear boundary. We check what applies before quoting.

Also covering areas around Uxbridge

Homes across SL0, UB8, UB9 and UB10 in Uxbridge are within our coverage, as are those in Ruislip, Hayes and Gerrards Cross. If you are just outside these areas, ask anyway, because we work right across the UK.

Planning a double-storey extension in Uxbridge?

Get a written quote for a double-storey extension at your Uxbridge home. The survey costs nothing, and there's no obligation to go ahead once you have seen our figure.