A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.
We arrange a double-storey extension for homeowners in Redcar and the wider North Yorkshire. The job is planned, priced and managed by us and carried out by tradespeople engaged under our contract, so there is one agreement and one contact. On a typical home the work takes 14–22 weeks on site, and guide pricing in Yorkshire and the Humber is £56,000–£113,000, VAT included.
- Guide price
- £56,000–£113,000 inc VAT
- Time on site
- 14–22 weeks on site
- Postcodes
- TS6 and TS10
- Planning rules
- England
- Local area
- Redcar and Cleveland
- Survey
- Free, with a written quote
What should you budget for a double-storey extension in Redcar?
Here is how the guide price for a double-storey extension breaks down in Redcar. We start from national figures and adjust for Yorkshire and the Humber, which comes out about 6% below the national guide. The resulting range, VAT included, is £56,000–£113,000, and a survey, at no cost to you, firms it up.
| Type of job | What it usually involves | Guide in Redcar |
|---|---|---|
| Small (15–20m² total) | A compact rear or side extension adding a small room on each floor. | £37,500–£61,000 |
| Typical (30–40m² total) | A larger kitchen or living room below with a double bedroom or en-suite above. | £56,000–£113,000 |
| Large (50m² plus total) | Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing. | £94,000–£169,000 |
Expect these to shape the final quote:
- Combined floor area across both storeys
- Bathrooms, en-suites and plumbing on the upper floor
- Foundation depth, ground conditions and drains to divert
- Scaffolding duration, access and the level of finishes
Scope of the work
- Insulated cavity walls with brick or render to match the house
- First-floor joists, stud walls and new openings upstairs
- Roof structure tied into the existing roof, tiled to match
- Scaffolding for the full build, erected and inspected
- Electrics, plumbing and heating by qualified trades, with certificates
- Windows, external doors, plastering and internal doors
Building in Redcar
York has medieval timber-framed, Georgian and Victorian buildings, Harrogate has stone Victorian villas and terraces, and the Dales and Moors are built of limestone and sandstone, often under stone-slate or pantile roofs. Teesside towns within the county, such as Middlesbrough and Redcar, have Victorian red-brick terraces and post-war estates.
High ground in the Dales and Moors sees snow, frost and strong winds, while the coast faces cold North Sea weather.
That mix of housing shapes how we approach a double-storey extension in Redcar: the age and construction of your home affect the materials, the method and, in the end, the price.
Planning and building rules in Redcar
As Redcar is in England, read the following with that system of planning and building control in mind. We check what applies to your house with the council before you receive a quote.
In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.
Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
We look at the job
We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a double-storey extension so the price reflects your home.
Quote in writing
Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.
Plan and prepare
Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.
The work itself
During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.
Working with SK Home Improvements
Common questions
How is the new roof joined to the existing house?
The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.
How long does a double-storey extension take?
A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.
Which postcodes in Redcar do you cover?
We cover TS6 and TS10, along with the rest of North Yorkshire. If your postcode is not listed, get in touch anyway: our coverage is UK-wide, and we can usually arrange a survey wherever you live. Enter your postcode in the guide-price tool or contact form and we will confirm.
Can you combine a double-storey extension with other work?
Yes. Because we manage several trades under one contract, we can plan a double-storey extension alongside other work on your Redcar home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.
Is a double-storey extension better value than single-storey?
A double-storey extension usually gives better value per square metre than a single-storey one, because the same foundations and roof serve twice the floor area. The overall cost is higher, and planning can be harder because of the effect on neighbours. If you might want an extra bedroom later, building both floors now avoids a second round of disruption and scaffolding.