Northamptonshire · Extensions & Renovations

Double-storey extensions in Corby

Covering NN17 and NN18 and the rest of Corby. Guide price £58,000–£115,000 inc VAT, confirmed after a free survey.

Two-storey side extension on a brick semi-detached house

Free survey in Corby

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

If you live in Corby and are weighing up a double-storey extension, the starting point is a visit to measure up and talk through what you want, which costs nothing. We cover homes across NN17 and NN18, and a typical project of this kind in the East Midlands lands somewhere in the £58,000–£115,000 bracket, including VAT. The exact figure depends on size, access and the finish you choose.

Guide price
£58,000–£115,000 inc VAT
Time on site
14–22 weeks on site
Postcodes
NN17 and NN18
Planning rules
England
Local area
Northamptonshire
Survey
Free, with a written quote

How much does a double-storey extension cost in Corby?

No two jobs cost exactly the same, but the ranges below give a fair picture of a double-storey extension in Corby. Pricing for the East Midlands runs about 4% below the national guide, and the overall guide is £58,000–£115,000 with VAT included. We'll confirm your figure after surveying the property for free.

Type of jobWhat it usually involvesGuide in Corby
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£38,500–£62,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£58,000–£115,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£96,000–£173,000

What moves the price up or down:

  • Combined floor area across both storeys
  • Bathrooms, en-suites and plumbing on the upper floor
  • Foundation depth, ground conditions and drains to divert
  • Scaffolding duration, access and the level of finishes

Scope of the work

  • Groundworks, foundations and below-ground drainage
  • Insulated cavity walls with brick or render to match the house
  • Roof structure tied into the existing roof, tiled to match
  • Scaffolding for the full build, erected and inspected
  • Electrics, plumbing and heating by qualified trades, with certificates
  • Windows, external doors, plastering and internal doors
Rear two-storey extensionAdds depth at the back, often a kitchen-diner below and a bedroom above.
Side two-storey extensionUses space beside a detached or semi-detached house for a wider plan.
Over-garage extensionBuilds a new room above an existing garage, checking the foundations first.
Hipped roofA roof that slopes on every side, matching many semi-detached and detached homes.

Local housing and a double-storey extension

Orange-brown ironstone is the signature material of many Northamptonshire villages, with limestone and Collyweston stone-slate roofs in the north-east. Northampton has Victorian terraces from its shoemaking era, Corby expanded as a post-war steel town, and Wellingborough, Kettering and Daventry have interwar, post-war and recent estates.

An inland county with cold winters and clay soils that can shrink in dry spells; ironstone weathers and needs a suitable mortar.

That mix of housing shapes how we approach a double-storey extension in Corby: the age and construction of your home affect the materials, the method and, in the end, the price.

Planning and building rules in Corby

England, Wales, Scotland and Northern Ireland each handle planning a little differently. Corby comes under England, covered below, and we raise any questions with the council before your quote is finalised.

In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.

Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. A visit to your home

    First, someone visits your home in Corby to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Your fixed price

    Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.

  3. Dates and permissions

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. Build and hand over

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

Working with SK Home Improvements

Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Frequently asked questions

Do I need planning permission for a two-storey extension?

Most two-storey extensions need planning permission, but it depends on the size, height and position, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. In England, a two-storey rear extension can sometimes be built under permitted development if it is no deeper than 3m and at least 7m from the rear boundary. We check what applies before quoting.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

Can the new upstairs room have its own bathroom?

A new upstairs room can usually have an en-suite, provided waste pipes can reach the soil stack or a new one can be installed. Running the waste pipe to the right falls is the main design question, and a pumped system is an option where gravity will not work. We plan bathroom positions at the design stage so pipes, ventilation and insulation are built in rather than added later.

How long will a double-storey extension take?

On a typical home, allow 14–22 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

How long does a double-storey extension take?

A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.

Near Corby

From NN17 and NN18 to the edges of Corby and on into Kettering, Market Harborough and Oakham, we can arrange a site visit and a written quote for your project, planned around dates that work for you.

Talk to us about a double-storey extension

Not sure of your budget yet? Try our guide-price tool for a double-storey extension, then book a free survey in Corby when you want a firm figure.

Call freeFree quote