A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.
Homeowners in Hawick usually consider a double-storey extension for one of a few reasons: something has worn out, the house no longer suits the way they live, or they are getting it ready to sell. We visit, agree a specification and put a fixed price in writing. Most jobs like this take 14–22 weeks on site, and we work across Scottish Borders, including Galashiels, Kelso and Peebles.
- Guide price
- £58,000–£115,000 inc VAT
- Time on site
- 14–22 weeks on site
- Postcodes
- TD9
- Planning rules
- Scotland
- Local area
- The Scottish Borders
- Survey
- Free, with a written quote
What should you budget for a double-storey extension in Hawick?
What should you budget for a double-storey extension in Hawick? Use the figures below as a starting point. Prices in Scotland sit about 4% below the national guide, so the range here is £58,000–£115,000 including VAT. Your fixed price comes in writing once we've surveyed the property, at no charge.
| Type of job | What it usually involves | Guide in Hawick |
|---|---|---|
| Small (15–20m² total) | A compact rear or side extension adding a small room on each floor. | £38,500–£62,000 |
| Typical (30–40m² total) | A larger kitchen or living room below with a double bedroom or en-suite above. | £58,000–£115,000 |
| Large (50m² plus total) | Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing. | £96,000–£173,000 |
What moves the price up or down:
- Combined floor area across both storeys
- Bathrooms, en-suites and plumbing on the upper floor
- Foundation depth, ground conditions and drains to divert
- Scaffolding duration, access and the level of finishes
Scope of the work
- Insulated cavity walls with brick or render to match the house
- First-floor joists, stud walls and new openings upstairs
- Roof structure tied into the existing roof, tiled to match
- Electrics, plumbing and heating by qualified trades, with certificates
- Windows, external doors, plastering and internal doors
- Building control inspections and completion certificate
What are homes like around Hawick?
Mill towns such as Hawick, Galashiels and Selkirk have stone terraces and tenements from the textile industry, Melrose and Kelso have older sandstone centres, and farmhouses and cottages across the Borders are built of whinstone or sandstone under slate roofs. Post-war and newer estates surround the larger towns.
Cold winters with frost and snow on higher ground, and the Tweed and Teviot can flood low-lying properties.
That variety is why a guide price for a double-storey extension in Hawick is only a starting point; the survey shows what your particular property needs.
Planning and building rules in Hawick
Planning law differs across the UK. For a home in Hawick, it is the Scotland rules below that count, and we check them with the council ahead of any quote.
In Scotland, extensions of more than one storey are only permitted development in narrow cases (Class 1B, well away from the boundary they face and outside conservation areas), so most need planning permission.
A building warrant is required before work starts. Scotland has no Party Wall Act; neighbour and title issues are handled under general law.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
How does the job run?
A visit to your home
We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a double-storey extension, and photograph or measure anything the quote needs to reflect.
Your fixed price
You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a double-storey extension.
Dates and permissions
With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Hawick property.
Build and hand over
The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.
What you can expect from us
Questions about a double-storey extension in Hawick
How long will a double-storey extension take?
On a typical home, allow 14–22 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
How is the new roof joined to the existing house?
The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.
Do I need planning permission for a two-storey extension?
Most two-storey extensions need planning permission, but it depends on the size, height and position, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. In England, a two-storey rear extension can sometimes be built under permitted development if it is no deeper than 3m and at least 7m from the rear boundary. We check what applies before quoting.
Can I stay at home during the work?
In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.
How long does a double-storey extension take?
A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.
Also covering areas around Hawick
Homes across TD9 in Hawick are within our coverage, as are those in Galashiels, Kelso and Peebles. If you are just outside these areas, ask anyway, because we work right across the UK.