A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.
Planning a double-storey extension for a home in Newcastle-under-Lyme means making a handful of decisions about materials, layout, finish and timing. We help you work through them at a free survey, then confirm in writing what it will cost for the options you pick. Most projects of this type need 14–22 weeks on site, and we cover every ST5 address as well as the rest of Staffordshire.
- Guide price
- £59,000–£118,000 inc VAT
- Time on site
- 14–22 weeks on site
- Postcodes
- ST5
- Planning rules
- England
- Local area
- Staffordshire
- Survey
- Free, with a written quote
Double-storey extensions prices in Newcastle-under-Lyme
Below is a breakdown of typical costs for a double-storey extension in Newcastle-under-Lyme. Because rates in the West Midlands are about 2% below the national guide, the overall guide comes to £59,000–£118,000, including VAT. Size, materials and access move the figure, and a free-of-charge survey settles it.
| Type of job | What it usually involves | Guide in Newcastle-under-Lyme |
|---|---|---|
| Small (15–20m² total) | A compact rear or side extension adding a small room on each floor. | £39,000–£64,000 |
| Typical (30–40m² total) | A larger kitchen or living room below with a double bedroom or en-suite above. | £59,000–£118,000 |
| Large (50m² plus total) | Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing. | £98,000–£176,000 |
The main things that change the figure:
- Combined floor area across both storeys
- How the new roof joins the existing roof
- Bathrooms, en-suites and plumbing on the upper floor
- Foundation depth, ground conditions and drains to divert
What’s included?
- Groundworks, foundations and below-ground drainage
- Insulated cavity walls with brick or render to match the house
- Roof structure tied into the existing roof, tiled to match
- Scaffolding for the full build, erected and inspected
- Electrics, plumbing and heating by qualified trades, with certificates
- Building control inspections and completion certificate
Homes in Staffordshire
Stoke-on-Trent has long rows of Victorian terraces from its pottery industry, often in red brick with Staffordshire blue brick details. Stafford, Lichfield and Tamworth mix Georgian and Victorian centres with interwar and post-war estates, Burton has brewery-era terraces, and the Staffordshire Moorlands around Leek use local gritstone.
The Moorlands are colder and wetter than the rest of the county, and parts of north Staffordshire sit over former coal workings.
In Newcastle-under-Lyme, as elsewhere in Staffordshire, we take the building's age and construction into account before recommending anything, because both can change what is involved in a double-storey extension.
Do you need permission in Newcastle-under-Lyme?
England, Wales, Scotland and Northern Ireland each handle planning a little differently. Newcastle-under-Lyme comes under England, covered below, and we raise any questions with the council before your quote is finalised.
In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.
Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
What happens after you get in touch?
Free site survey
First, someone visits your home in Newcastle-under-Lyme to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.
Quote in writing
Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.
Booking the work
Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.
On site to finish
Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.
What you can expect from us
Double-storey extensions in Newcastle-under-Lyme: questions
Do I need planning permission for a two-storey extension?
Most two-storey extensions need planning permission, but it depends on the size, height and position, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. In England, a two-storey rear extension can sometimes be built under permitted development if it is no deeper than 3m and at least 7m from the rear boundary. We check what applies before quoting.
What happens at the survey?
We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a double-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.
Is a double-storey extension better value than single-storey?
A double-storey extension usually gives better value per square metre than a single-storey one, because the same foundations and roof serve twice the floor area. The overall cost is higher, and planning can be harder because of the effect on neighbours. If you might want an extra bedroom later, building both floors now avoids a second round of disruption and scaffolding.
How long will a double-storey extension take?
On a typical home, allow 14–22 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Can the new upstairs room have its own bathroom?
A new upstairs room can usually have an en-suite, provided waste pipes can reach the soil stack or a new one can be installed. Running the waste pipe to the right falls is the main design question, and a pumped system is an option where gravity will not work. We plan bathroom positions at the design stage so pipes, ventilation and insulation are built in rather than added later.