A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.
Addresses across CV10 and CV11 fall within our coverage for a double-storey extension, so if your home is in Nuneaton we can arrange a survey on a day that works for you. We inspect the existing building, discuss materials and layout, and then price the agreed specification in writing. Expect a guide range of £59,000–£118,000 including VAT before that visit.
- Guide price
- £59,000–£118,000 inc VAT
- Time on site
- 14–22 weeks on site
- Postcodes
- CV10 and CV11
- Planning rules
- England
- Local area
- Warwickshire
- Survey
- Free, with a written quote
Double-storey extensions prices in Nuneaton
The costs listed here are typical for a double-storey extension around Nuneaton and include VAT. They reflect labour and material costs in the West Midlands, about 2% below the national guide, giving a range of £59,000–£118,000. Exact pricing depends on your home, so we only fix it once a free site survey is done.
| Type of job | What it usually involves | Guide in Nuneaton |
|---|---|---|
| Small (15–20m² total) | A compact rear or side extension adding a small room on each floor. | £39,000–£64,000 |
| Typical (30–40m² total) | A larger kitchen or living room below with a double bedroom or en-suite above. | £59,000–£118,000 |
| Large (50m² plus total) | Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing. | £98,000–£176,000 |
The main things that change the figure:
- How the new roof joins the existing roof
- Bathrooms, en-suites and plumbing on the upper floor
- Foundation depth, ground conditions and drains to divert
- Scaffolding duration, access and the level of finishes
What’s included?
- Insulated cavity walls with brick or render to match the house
- First-floor joists, stud walls and new openings upstairs
- Roof structure tied into the existing roof, tiled to match
- Scaffolding for the full build, erected and inspected
- Electrics, plumbing and heating by qualified trades, with certificates
- Windows, external doors, plastering and internal doors
Local housing and a double-storey extension
Stratford-upon-Avon and Warwick have timber-framed and Georgian buildings, and Leamington Spa is known for Regency stucco terraces and villas. Nuneaton and Bedworth have brick terraces from their mining and industrial past, Rugby mixes Victorian housing with large new estates, and southern villages near the Cotswolds use limestone and blue lias.
Regency and period homes may need render repairs, decorating and windows that suit conservation areas. Terraces suit loft conversions and extensions, and newer estate homes often take garage conversions and landscaping.
That variety is why a guide price for a double-storey extension in Nuneaton is only a starting point; the survey shows what your particular property needs.
Permissions for a double-storey extension in Nuneaton
Homes in Nuneaton come under the regulations for England, summarised below. We don't rely on general rules alone: we confirm the position for your address with the council before a quote goes out.
In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.
Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
A visit to your home
First, someone visits your home in Nuneaton to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.
Written quote
After the survey we send a quote for a double-storey extension that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.
Getting ready
With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Nuneaton property.
On site to finish
The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.
Why homeowners choose us
Double-storey extensions in Nuneaton: questions
Will the extension affect my neighbours?
A double-storey extension can affect neighbours' light, outlook and privacy, which is why planning departments look closely at height, depth and window positions. Side windows facing neighbours often need obscure glass. Work near a shared wall may also need party wall notices; the Party Wall etc. Act 1996 applies in England and Wales only. We talk through these points early so the design is realistic.
How is the new roof joined to the existing house?
The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.
Can I stay at home during the work?
In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.
Can we live at home while it is built?
Most families stay at home during a double-storey extension. The new structure is built outside first, and we only break through into the existing rooms near the end, usually one floor at a time. Upstairs, this may mean a bedroom is out of use for a week or two. We fit dust screens, protect floors and stairs, and plan any time without water or power in advance.
Can you combine a double-storey extension with other work?
Yes. Because we manage several trades under one contract, we can plan a double-storey extension alongside other work on your Nuneaton home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.
Nearby towns
Nuneaton and its CV10 and CV11 postcodes are part of our coverage. Homeowners in Bedworth, Hinckley and Earl Shilton can also book a free survey with us and receive a written price for their job.