Scotland · Kitchens & Interiors

Flooring in Angus and Dundee

Guide price £1,150–£3,800 including VAT across Angus and Dundee, with a free site survey and a written fixed price.

Herringbone oak-effect flooring being laid in a living room

Free survey in Angus and Dundee

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

Flooring installation is the supply and fitting of a new floor finish, such as laminate, luxury vinyl tile, engineered wood or solid wood, over a properly levelled and prepared subfloor, with underlay, trims and thresholds finished neatly.

We offer new flooring throughout Angus and Dundee, from Dundee, Arbroath, Forfar and Carnoustie to the smaller places in between. Each project starts with a free survey at your home and ends with a written figure, fixed for the work you choose. Because Angus and Dundee is in Scotland, we work to the planning system and building standards used there, and guide prices for Scotland run at £1,150–£3,800 including VAT.

Guide price
£1,150–£3,800 inc VAT
Time on site
1–2 days per room, longer if levelling is needed
Planning rules
Scotland
Price level
About 4% below the national guide
Towns listed
4
Survey
Free, with a written quote

Flooring prices in Angus and Dundee

These are guide costs, not quotes. For new flooring in Angus and Dundee the range is £1,150–£3,800, VAT included, reflecting prices in Scotland that are about 4% below the national guide. Once we have visited for a free survey, you get a firm figure for the scope you approve.

Type of jobWhat it usually involvesGuide in Angus and Dundee
Laminate in one roomAround 15–20m² of laminate with underlay, trims and door trimming.£600–£1,750
LVT or engineered woodAround 20–25m² of LVT or engineered wood, with levelling and moisture protection.£1,150–£3,400
Whole floor or solid woodAn open-plan ground floor, solid wood or herringbone, with extensive preparation.£3,400–£8,600

What moves the price up or down:

  • Floor area and the number of rooms, stairs and doorways
  • Flooring type, plank size and laying pattern
  • Condition of the subfloor and any levelling needed
  • Underfloor heating, moisture barriers and acoustic underlay

What’s included?

  • Lifting and disposal of old carpet, laminate or vinyl
  • Subfloor repairs, levelling compound or plywood overlay where needed
  • Damp-proof membrane and suitable underlay for your floor type
  • Door trimming so doors clear the new floor
  • Threshold strips, scotia or skirting finished neatly
  • Furniture moved within the room where agreed
LaminateA hard-wearing, low-cost wood or stone effect floor that suits bedrooms, hallways and living rooms.
Engineered woodA real wood top layer on a stable core, suitable for underfloor heating.
Solid woodSolid timber boards that can be sanded and refinished many times over their life.
Herringbone or parquetSmall blocks laid in a pattern for a classic look, in wood, engineered wood or LVT.

Homes in Angus and Dundee

Dundee has sandstone tenements and terraces, Victorian villas in Broughty Ferry and the West End, and extensive post-war housing. Angus towns such as Arbroath, Forfar, Montrose and Brechin use local red sandstone, and harled cottages and farmhouses are common in the countryside.

Tenement flats often need window replacement and internal refits, and houses commonly take extensions and loft conversions. Sandstone buildings need careful repointing and stone repairs, and harled cottages need breathable render.

Relatively dry for Scotland, but cold easterly winds and frosts are common, and coastal towns face salt and haar.

Planning and building rules in Angus and Dundee

Planning law differs across the UK. For a home in Angus and Dundee, it is the Scotland rules below that count, and we check them with the council ahead of any quote.

Internal improvements do not need planning permission in Scotland unless the building is listed.

Like-for-like kitchen and bathroom replacements do not normally need a building warrant, but structural changes and some drainage or heating alterations do, and electrical work must meet the building standards.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. Free site survey

    We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for new flooring so the price reflects your home.

  2. Price and scope agreed

    Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.

  3. Booking the work

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. On site to finish

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

How we work

Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Questions about new flooring in Angus and Dundee

Can I have wood flooring with underfloor heating?

Engineered wood and LVT both work well with underfloor heating, because they are stable and transfer heat efficiently. Solid wood is less suitable, as it can move and gap as temperatures change. The flooring and underlay must be approved for use with the heating system, and floor temperatures need limiting. We check the manufacturer's guidance before recommending a product.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

How do I look after a new floor?

Looking after a new floor is mostly about keeping grit off it, because grit acts like sandpaper. Use doormats, sweep or vacuum regularly and clean with a damp, not wet, mop using a cleaner made for that floor type. Put felt pads under furniture legs. Oiled wood floors need occasional re-oiling, while lacquered wood, laminate and LVT just need regular cleaning.

Can you combine new flooring with other work?

Yes. Because we manage several trades under one contract, we can plan new flooring alongside other work on your Angus and Dundee home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.

Will my doors need trimming?

Doors often need trimming after new flooring is fitted, because the combined height of the underlay and floor is usually greater than old carpet or vinyl. We take each door off, trim the bottom by the right amount and rehang it so it clears the new floor. Threshold strips are then fitted where the new floor meets another surface.

Towns in Angus and Dundee

Our coverage for new flooring in Angus and Dundee includes the towns listed here. Each page explains guide costs, typical timings and the neighbouring places we also serve.

Ready for a written price?

Planning new flooring in Angus and Dundee? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.

Call freeFree quote