Garden landscaping is designing and building an outdoor space as a whole, combining hard landscaping such as patios, paths, walls and steps with soft landscaping such as lawns, planting and beds, plus drainage and lighting, so the garden works for how you live.
Looking for garden landscaping in West Sussex? We organise the whole job, bringing in the trades it needs under one agreement, and you have a single contact. We cover Crawley, Worthing, Bognor Regis and Littlehampton, along with villages and suburbs nearby. The rules in England decide what consents are needed, and our guide range of £6,700–£17,000 including VAT gives you a realistic starting point for a budget.
- Guide price
- £6,700–£17,000 inc VAT
- Time on site
- 1–4 weeks on site, depending on scope
- Planning rules
- England
- Price level
- About 12% above the national guide
- Towns listed
- 12
- Survey
- Free, with a written quote
Garden landscaping prices in West Sussex
What will garden landscaping cost in West Sussex? Our guide range is £6,700–£17,000 including VAT. That figure is adjusted for the South East, about 12% above the national guide, and is intended for planning a budget. A firm written price for your chosen specification follows a free survey at your home.
| Type of job | What it usually involves | Guide in West Sussex |
|---|---|---|
| Garden refresh | Clearance, new turf, edging, bark or gravel and some planting. | £1,700–£5,600 |
| Typical garden makeover | A new patio, lawn, borders, paths and planting in a typical rear garden. | £6,700–£17,000 |
| Full redesign | Levels, retaining walls, large patios, lighting and drainage for larger or sloping gardens. | £17,000–£39,000 |
The main things that change the figure:
- Garden size, access and the amount of clearance needed
- Ratio of hard landscaping to lawn and planting
- Levels, slopes, retaining walls and steps
- Materials chosen for paving, walls and features
Scope of the work
- Survey of size, levels, soil, drainage and access
- Layout plan agreed with you before work starts
- Groundworks, levelling and drainage
- Patios, paths, steps and edging laid on proper bases
- Raised beds, low walls or sleepers built to the agreed design
- Planting, bark or gravel finishing and outdoor lighting where included
Housing across West Sussex
Chichester has Georgian brick streets, Downland villages use flint and brick, and Horsham stone slabs cover some older roofs. Worthing and Bognor Regis have interwar and post-war bungalows and semis, Crawley was planned as a post-war new town, and Wealden villages to the north feature tile-hanging and timber framing.
Bungalows commonly suit loft conversions and extensions; new-town homes often take window, roofline and cladding renewal. Flint and stone properties need lime repointing, and coastal homes may need external decorating more often.
Coastal towns face salt-laden south-westerly winds, while Wealden clay inland can shrink and swell with the seasons.
Planning and building rules in West Sussex
West Sussex is in England, so the planning and building rules set out below are the ones that apply. We confirm the details with the council before we quote.
Most garden landscaping in England needs no planning permission. Trees protected by a Tree Preservation Order, or trees in a conservation area, need the council’s consent or notice before work; outbuildings and raised platforms have their own limits.
Building Regulations rarely apply to landscaping, though new drainage and garden electrics must comply.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
Free site survey
It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about garden landscaping.
Quote in writing
Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.
Booking the work
With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your West Sussex property.
On site to finish
On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.
How we work
Frequently asked questions
What can be done about a waterlogged garden?
A waterlogged garden is usually caused by heavy clay soil, compacted ground or water running off from hard surfaces. Solutions include French drains, soakaways, improving soil with organic matter, and making new paving permeable or directing its run-off to drains. Raised beds help plants in wet areas. We look at the cause during the survey and include drainage in the design.
How long does a garden makeover take?
A typical garden makeover takes around one to four weeks on site, depending on size and scope. Clearance and groundworks come first, then drainage, patios, paths and walls, followed by turf and planting. Larger or sloping gardens with retaining walls take longer. Weather can affect timings, especially for groundworks and laying turf. We give you a programme with your quote.
Can you combine garden landscaping with other work?
Yes. Because we manage several trades under one contract, we can plan garden landscaping alongside other work on your West Sussex home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.
How long will garden landscaping take?
On a typical home, allow 1–4 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
What time of year suits garden landscaping?
Hard landscaping such as patios, paths and walls can be built most of the year, though frost and heavy rain cause delays. Planting is usually most successful in autumn and spring, when plants can establish roots before summer. Turf can be laid in most months if the ground is not frozen or waterlogged. We plan the order of work around the season.
Towns in West Sussex
Below is our list of West Sussex towns for garden landscaping. If yours isn't shown, we may still cover it, so it is worth asking us directly.

