A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.
If you have a whole-house renovation on your list for a property in Aberdeen, we can help from the first measurements to the final clean-up. For a typical home, plan for 8–24 weeks on site, depending on scope, though larger or more complex jobs take longer. We cover postcodes AB10, AB11, AB15 and AB16 and nearby Nigg, Inverurie and Peterhead, and every quote we send is fixed for the scope described in it.
- Guide price
- £43,000–£115,000 inc VAT
- Time on site
- 8–24 weeks on site, depending on scope
- Postcodes
- AB10, AB11, AB15, AB16 and AB24
- Planning rules
- Scotland
- Local area
- Aberdeen City
- Survey
- Free, with a written quote
Whole-house renovations prices in Aberdeen
In Aberdeen, guide figures for a whole-house renovation sit at £43,000–£115,000, VAT included. We set them using rates for Scotland, currently about 4% below the national guide. The table shows what pushes a project towards either end of the range; your own price is set after a free survey.
| Type of job | What it usually involves | Guide in Aberdeen |
|---|---|---|
| Light refurbishment | Decoration, flooring, minor repairs and perhaps one new kitchen or bathroom. | £14,500–£43,000 |
| Full refurbishment | Rewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house. | £43,000–£115,000 |
| Renovation with structural changes | A full refurbishment plus wall removal, layout changes or extra bathrooms. | £96,000–£173,000 |
Your price depends mostly on:
- Size of the house and number of rooms being renovated
- Whether rewiring, new heating and full replastering are needed
- Kitchen and bathroom specification
- Hidden problems such as damp, rot or outdated drainage
What’s included?
- Room-by-room survey and a planned order of works
- Strip-out of old kitchens, bathrooms, flooring and finishes
- Rewiring and new consumer unit by qualified electricians, with certificates
- Plastering, skimming and repairs to ceilings and walls
- Flooring, internal doors, skirting and joinery
- Decoration and a final clean before handover
Building in Aberdeen
Aberdeen is built largely of grey granite, from tenements and terraces to granite villas in the West End, with post-war council housing and newer estates on the outskirts. Across Aberdeenshire, harled stone cottages, fishing-town terraces in Peterhead and Fraserburgh, and modern developments in commuter towns such as Westhill and Ellon are common.
Cold North Sea winds, coastal haar and hard winter frosts are routine, so roofs, harling and exposed fixings need a robust specification.
For a whole-house renovation in Aberdeen, this means checking things like wall construction, roof structure and existing services before we put a figure on paper.
Permissions for a whole-house renovation in Aberdeen
As Aberdeen is in Scotland, read the following with that system of planning and building control in mind. We check what applies to your house with the council before you receive a quote.
Internal improvements do not need planning permission in Scotland unless the building is listed.
Like-for-like kitchen and bathroom replacements do not normally need a building warrant, but structural changes and some drainage or heating alterations do, and electrical work must meet the building standards.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
A visit to your home
We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a whole-house renovation, and photograph or measure anything the quote needs to reflect.
Price and scope agreed
We turn the survey notes into a written quote. The price is fixed for the specification we agree, and the document sets out materials, scope and payment stages in plain language.
Plan and prepare
Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.
Finish and handover
The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.
Why homeowners choose us
Questions about a whole-house renovation in Aberdeen
What happens if you find damp or rot?
If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.
Do you cover Nigg, Inverurie and Peterhead?
Yes. As well as Aberdeen, we cover Nigg, Inverurie and Peterhead and the rest of Aberdeen and Aberdeenshire. Our coverage is UK-wide, so the process is the same wherever you are: a free site survey, a quote in writing that fixes the price for the agreed scope, and one point of contact while the work is planned and carried out.
Which parts of a renovation need building regulations approval?
Several parts of a renovation fall under building regulations, including rewiring and new circuits, new boilers and heating systems, structural changes such as removing walls, replacement windows and changes to drainage. Some of this is self-certified by suitably registered trades, and some needs building control approval. In Scotland a building warrant may be needed for certain works. We arrange the right approvals and certificates.
Do I need planning permission in Aberdeen?
It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Aberdeen is in Scotland, so Scotland's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.
In what order should renovation work be done?
A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.
Near Aberdeen
Our coverage in Aberdeen includes AB10, AB11, AB15 and AB16. We also travel to Nigg, Inverurie and Peterhead, so neighbouring addresses are looked after on exactly the same terms as those in town.

