Buckinghamshire · Extensions & Renovations

Whole-house renovations in Aylesbury

Whole-house renovations for homes in Aylesbury and nearby Leighton Buzzard, Berkhamsted and Chesham, from survey to handover.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Aylesbury

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

Getting a whole-house renovation right in Aylesbury starts with understanding the house you already have: its age, how it was built and what has been altered over the years. We survey first, then commit on paper to a price that holds as long as the scope stays the same. Across the South East, guide prices run at £50,000–£134,000 including VAT, and homes in Leighton Buzzard, Berkhamsted and Chesham are covered too.

Guide price
£50,000–£134,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
HP19, HP20 and HP21
Planning rules
England
Local area
Buckinghamshire
Survey
Free, with a written quote

How much does a whole-house renovation cost in Aylesbury?

Here is how the guide price for a whole-house renovation breaks down in Aylesbury. We start from national figures and adjust for the South East, which comes out about 12% above the national guide. The resulting range, VAT included, is £50,000–£134,000, and a survey, at no cost to you, firms it up.

Type of jobWhat it usually involvesGuide in Aylesbury
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£17,000–£50,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£50,000–£134,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£112,000–£202,000

Expect these to shape the final quote:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Hidden problems such as damp, rot or outdated drainage

What do you get?

  • Room-by-room survey and a planned order of works
  • Strip-out of old kitchens, bathrooms, flooring and finishes
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Plastering, skimming and repairs to ceilings and walls
  • New kitchen and bathroom fitted to your chosen specification
  • Decoration and a final clean before handover
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

What are homes like around Aylesbury?

Buckinghamshire runs from Chiltern villages of brick and flint, through Metroland interwar semis around Amersham and Chesham, to Victorian terraces in High Wycombe and Aylesbury. Milton Keynes adds estates built from the 1970s onwards in brick, render and timber frame, and new housing continues to spread around its edges.

Chiltern cottages may need lime repairs and careful window choices in conservation areas. Interwar semis suit hip-to-gable lofts and rear extensions, while Milton Keynes homes often need roofline renewal, replacement doors and garage conversions.

So when we survey a Aylesbury property for a whole-house renovation, the first step is working out how it was built and what has been changed since.

Permissions for a whole-house renovation in Aylesbury

Homes in Aylesbury come under the regulations for England, summarised below. We don't rely on general rules alone: we confirm the position for your address with the council before a quote goes out.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. We look at the job

    We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a whole-house renovation so the price reflects your home.

  2. Written quote

    Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.

  3. Getting ready

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a whole-house renovation are in place before the first day on site.

  4. The work itself

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

What you can expect from us

Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.

Common questions

In what order should renovation work be done?

A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.

What happens if you find damp or rot?

If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.

Do I need planning permission to renovate?

Most internal renovation work does not need planning permission, but it depends on what changes, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. Listed buildings usually need consent for internal and external changes. Altering windows, adding dormers or changing the outside appearance in a conservation area may also need permission. We check before quoting.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

How long will a whole-house renovation take?

On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Nearby towns

Homes across HP19, HP20 and HP21 in Aylesbury are within our coverage, as are those in Leighton Buzzard, Berkhamsted and Chesham. If you are just outside these areas, ask anyway, because we work right across the UK.

Planning a whole-house renovation in Aylesbury?

Request your free survey for a whole-house renovation in Aylesbury. Once we've seen the property, we'll send a written price, fixed for the work as specified, with no obligation.

Call freeFree quote