Kent · Extensions & Renovations

Whole-house renovations in Tonbridge

Guide price £50,000–£134,000 including VAT, typically 8–24 weeks on site, depending on scope, with a free site survey and a written fixed price.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Tonbridge

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

Every house in Tonbridge is a little different, so we never price a whole-house renovation from a brochure. We look at the structure, access and existing finishes first, then put in writing a fixed figure for the scope we settle on. As a rough steer, homeowners in the South East should budget £50,000–£134,000 including VAT, with work typically taking 8–24 weeks on site, depending on scope.

Guide price
£50,000–£134,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
TN9, TN10 and TN11
Planning rules
England
Local area
Kent
Survey
Free, with a written quote

Whole-house renovations prices in Tonbridge

Every figure below is a guide for a whole-house renovation in Tonbridge, inclusive of VAT. Regional pricing for the South East works out about 12% above the national guide, and the overall span is £50,000–£134,000. The survey costs you nothing, and after it we commit to a firm price for your specification in writing.

Type of jobWhat it usually involvesGuide in Tonbridge
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£17,000–£50,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£50,000–£134,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£112,000–£202,000

Expect these to shape the final quote:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Structural or layout changes and associated approvals

What do you get?

  • Room-by-room survey and a planned order of works
  • Strip-out of old kitchens, bathrooms, flooring and finishes
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Heating and plumbing upgrades by qualified engineers
  • New kitchen and bathroom fitted to your chosen specification
  • Decoration and a final clean before handover
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.

Local housing and a whole-house renovation

Kent's older buildings include oast houses, weatherboarded cottages, Wealden timber-framed houses and Kentish ragstone walls. Medway towns have long rows of Victorian terraces, Margate and Ramsgate have Regency and Victorian seafronts, and Ashford, Maidstone and Dartford have seen large new estates alongside interwar and post-war housing.

Victorian terraces suit loft rooms and rear extensions; weatherboarded and timber-framed buildings may need cladding repairs and lime work. Newer estate homes often take garage conversions, porches and landscaping.

That variety is why a guide price for a whole-house renovation in Tonbridge is only a starting point; the survey shows what your particular property needs.

Do you need permission in Tonbridge?

England, Wales, Scotland and Northern Ireland each handle planning a little differently. Tonbridge comes under England, covered below, and we raise any questions with the council before your quote is finalised.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. We look at the job

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a whole-house renovation.

  2. Your fixed price

    After the survey we send a quote for a whole-house renovation that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.

  3. Getting ready

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. Finish and handover

    Our trades complete a whole-house renovation while your point of contact keeps you updated. When everything is finished, we clear the site, take away waste and go through the result with you before handover.

Why homeowners choose us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.

Whole-house renovations in Tonbridge: questions

How long does a full house renovation take?

A full renovation of a typical 3-bed house usually takes around 8–16 weeks on site, and longer if there are structural changes or extensive repairs. A light refresh may take only a few weeks. Material lead times for kitchens, windows and bathroom fittings also affect the programme. We give you a week-by-week plan with your quote and update it as the work progresses.

How much does it cost to renovate a whole house?

A full refurbishment of a typical 3-bed house costs £50,000–£134,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.

What happens if you find damp or rot?

If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.

How long will a whole-house renovation take?

On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Do I need planning permission in Tonbridge?

It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Tonbridge is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.

Also covering areas around Tonbridge

We survey and quote throughout Tonbridge's TN9, TN10 and TN11 postcodes and in surrounding places such as Tunbridge Wells, Sevenoaks and Crowborough. The process and pricing approach are identical in each of them.

Ready for a written price?

Planning a whole-house renovation in Tonbridge? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.

Call freeFree quote