Lanarkshire · Extensions & Renovations

Whole-house renovations in Cambuslang

Typical time on site: 8–24 weeks on site, depending on scope. Guide price in Cambuslang: £43,000–£115,000 including VAT.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Cambuslang

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

Whatever type of house you own in Cambuslang, we start by looking at how a whole-house renovation would fit it rather than offering a standard package. We cover G73 and neighbouring places such as Rutherglen, Blantyre and High Blantyre. One named person looks after you from survey to handover, and nothing is booked until you hold our figure in writing, fixed for the work described.

Guide price
£43,000–£115,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
G73
Planning rules
Scotland
Local area
South Lanarkshire
Survey
Free, with a written quote

Whole-house renovations prices in Cambuslang

Budgeting for a whole-house renovation in Cambuslang? The numbers below include VAT and are adjusted for Scotland, where costs are about 4% below the national guide. The headline range is £43,000–£115,000. Nothing is final until we have measured up at a free survey and agreed the specification with you.

Type of jobWhat it usually involvesGuide in Cambuslang
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£14,500–£43,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£43,000–£115,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£96,000–£173,000

Your price depends mostly on:

  • Size of the house and number of rooms being renovated
  • Kitchen and bathroom specification
  • Structural or layout changes and associated approvals
  • Hidden problems such as damp, rot or outdated drainage

What do you get?

  • Room-by-room survey and a planned order of works
  • Strip-out of old kitchens, bathrooms, flooring and finishes
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Heating and plumbing upgrades by qualified engineers
  • Plastering, skimming and repairs to ceilings and walls
  • Decoration and a final clean before handover
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

Homes in Lanarkshire

Lanarkshire mixes sandstone tenements and terraces in Hamilton, Motherwell, Airdrie and Coatbridge with former miners' rows and large post-war estates, many finished in roughcast. East Kilbride and Cumbernauld were developed as post-war new towns, and newer private estates surround most towns.

Roughcast homes commonly need re-rendering, window replacement and roof work. Semis and bungalows suit extensions and loft conversions, and new-town houses often take garage conversions and driveways.

That mix of housing shapes how we approach a whole-house renovation in Cambuslang: the age and construction of your home affect the materials, the method and, in the end, the price.

Permissions for a whole-house renovation in Cambuslang

For anyone in Cambuslang, the relevant framework is Scotland's. The summary below is general, so we always contact the council about your address before putting a price in writing.

Internal improvements do not need planning permission in Scotland unless the building is listed.

Like-for-like kitchen and bathroom replacements do not normally need a building warrant, but structural changes and some drainage or heating alterations do, and electrical work must meet the building standards.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. Free site survey

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a whole-house renovation.

  2. Written quote

    Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.

  3. Plan and prepare

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a whole-house renovation are in place before the first day on site.

  4. Build and hand over

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

Why homeowners choose us

Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Whole-house renovations in Cambuslang: questions

How long does a full house renovation take?

A full renovation of a typical 3-bed house usually takes around 8–16 weeks on site, and longer if there are structural changes or extensive repairs. A light refresh may take only a few weeks. Material lead times for kitchens, windows and bathroom fittings also affect the programme. We give you a week-by-week plan with your quote and update it as the work progresses.

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

Can we live in the house while it is renovated?

Living in a house during a full renovation is possible but hard, especially while rewiring, plastering and the kitchen and bathroom are being done. Many people move out for the noisiest weeks or stay elsewhere for the whole project. If you stay, we can phase the work room by room and keep one bathroom and a basic kitchen working for as long as possible. We discuss this at the survey.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a whole-house renovation, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

Which parts of a renovation need building regulations approval?

Several parts of a renovation fall under building regulations, including rewiring and new circuits, new boilers and heating systems, structural changes such as removing walls, replacement windows and changes to drainage. Some of this is self-certified by suitably registered trades, and some needs building control approval. In Scotland a building warrant may be needed for certain works. We arrange the right approvals and certificates.

Near Cambuslang

Homes across G73 in Cambuslang are within our coverage, as are those in Rutherglen, Blantyre and High Blantyre. If you are just outside these areas, ask anyway, because we work right across the UK.

Planning a whole-house renovation in Cambuslang?

Ready to talk about a whole-house renovation in Cambuslang? Book a free site survey and we'll send you a written, fixed-price quote for the specification you choose.

Call freeFree quote