A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.
Planning a whole-house renovation for a home in Leicester means making a handful of decisions about materials, layout, finish and timing. We help you work through them at a free survey, then confirm in writing what it will cost for the options you pick. Most projects of this type need 8–24 weeks on site, depending on scope, and we cover every LE1, LE3, LE4 and LE5 address as well as the rest of Leicestershire.
- Guide price
- £43,000–£115,000 inc VAT
- Time on site
- 8–24 weeks on site, depending on scope
- Postcodes
- LE1, LE3, LE4 and LE5
- Planning rules
- England
- Local area
- Leicestershire
- Survey
- Free, with a written quote
Whole-house renovations prices in Leicester
The costs listed here are typical for a whole-house renovation around Leicester and include VAT. They reflect labour and material costs in the East Midlands, about 4% below the national guide, giving a range of £43,000–£115,000. Exact pricing depends on your home, so we only fix it once a free site survey is done.
| Type of job | What it usually involves | Guide in Leicester |
|---|---|---|
| Light refurbishment | Decoration, flooring, minor repairs and perhaps one new kitchen or bathroom. | £14,500–£43,000 |
| Full refurbishment | Rewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house. | £43,000–£115,000 |
| Renovation with structural changes | A full refurbishment plus wall removal, layout changes or extra bathrooms. | £96,000–£173,000 |
Your price depends mostly on:
- Size of the house and number of rooms being renovated
- Whether rewiring, new heating and full replastering are needed
- Structural or layout changes and associated approvals
- Hidden problems such as damp, rot or outdated drainage
What does the job include in Leicester?
- Room-by-room survey and a planned order of works
- Rewiring and new consumer unit by qualified electricians, with certificates
- Heating and plumbing upgrades by qualified engineers
- Plastering, skimming and repairs to ceilings and walls
- Flooring, internal doors, skirting and joinery
- Decoration and a final clean before handover
Local housing and a whole-house renovation
Leicester has extensive Victorian red-brick terraces and interwar semis, with newer estates on the city's edges. Charnwood granite appears in walls and buildings in the north-west, Swithland slate on older roofs, and villages towards Rutland use ironstone and limestone. Loughborough, Hinckley and Market Harborough mix Victorian centres with post-war and recent housing.
A moderate, fairly dry Midlands climate, with winter frosts and clay soils that can move in dry summers.
Whatever era your Leicester home dates from, we plan a whole-house renovation around how it is actually built rather than a one-size-fits-all specification.
Do you need permission in Leicester?
As Leicester is in England, read the following with that system of planning and building control in mind. We check what applies to your house with the council before you receive a quote.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
We look at the job
We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a whole-house renovation so the price reflects your home.
Price and scope agreed
We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.
Plan and prepare
Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.
On site to finish
The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.
Working with SK Home Improvements
Frequently asked questions
What happens if you find damp or rot?
If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.
How much will a whole-house renovation cost in Leicester?
As a guide, expect to pay £43,000–£115,000 including VAT for a whole-house renovation in Leicester. That range is adjusted for the East Midlands, which runs about 4% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.
What contingency should I allow?
A contingency is money set aside for problems found once work starts, such as rotten joists, hidden damp or wiring that is worse than expected. For older houses, setting aside at least 10–15% of the build cost is sensible. We look for warning signs during the survey and price known issues upfront. If something unexpected is found, we explain it and price it before carrying on.
How much does it cost to renovate a whole house?
A full refurbishment of a typical 3-bed house costs £43,000–£115,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.
Do I need planning permission in Leicester?
It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Leicester is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.
Also covering areas around Leicester
Whether you're in the centre of Leicester or on its outskirts, LE1, LE3, LE4 and LE5 addresses are covered. We extend the same service, and the same fixed-price approach, to Humberstone, Oadby and Wigston.

