London · Extensions & Renovations

Whole-house renovations in Highbury

Local guide: £58,000–£156,000 inc VAT. Planning notes for England, a free survey and one point of contact.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Highbury

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

Planning a whole-house renovation for a home in Highbury means making a handful of decisions about materials, layout, finish and timing. We help you work through them at a free survey, then confirm in writing what it will cost for the options you pick. Most projects of this type need 8–24 weeks on site, depending on scope, and we cover every N1, N4, N5 and N7 address as well as the rest of London.

Guide price
£58,000–£156,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
N1, N4, N5, N7 and N16
Planning rules
England
Local area
Greater London
Survey
Free, with a written quote

What should you budget for a whole-house renovation in Highbury?

No two jobs cost exactly the same, but the ranges below give a fair picture of a whole-house renovation in Highbury. Pricing for London runs about 30% above the national guide, and the overall guide is £58,000–£156,000 with VAT included. We'll confirm your figure after surveying the property for free.

Type of jobWhat it usually involvesGuide in Highbury
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£19,500–£58,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£58,000–£156,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£130,000–£234,000

What moves the price up or down:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Structural or layout changes and associated approvals
  • Hidden problems such as damp, rot or outdated drainage

Scope of the work

  • Room-by-room survey and a planned order of works
  • Strip-out of old kitchens, bathrooms, flooring and finishes
  • Heating and plumbing upgrades by qualified engineers
  • New kitchen and bathroom fitted to your chosen specification
  • Flooring, internal doors, skirting and joinery
  • Decoration and a final clean before handover
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.

Local housing and a whole-house renovation

London's housing is dominated by Victorian and Edwardian terraces, often in yellow London stock brick, with Georgian terraces in central districts and mansion blocks across many inner areas. Outer boroughs have large belts of interwar semis, and there are extensive post-war council estates. Many houses have been split into flats, and conservation areas are widespread.

Terraces suit side-return extensions and rear dormer loft conversions; interwar semis commonly take hip-to-gable lofts. Shared party walls, restricted parking and conservation rules often shape the plans and the programme.

Building traditions across London also raise conservation and planning questions, so we check those for a whole-house renovation in Highbury at the survey stage.

Planning and building rules in Highbury

England, Wales, Scotland and Northern Ireland each handle planning a little differently. Highbury comes under England, covered below, and we raise any questions with the council before your quote is finalised.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. A visit to your home

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a whole-house renovation, and photograph or measure anything the quote needs to reflect.

  2. Your fixed price

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a whole-house renovation.

  3. Dates and permissions

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. The work itself

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

What you can expect from us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.

Common questions

Which parts of a renovation need building regulations approval?

Several parts of a renovation fall under building regulations, including rewiring and new circuits, new boilers and heating systems, structural changes such as removing walls, replacement windows and changes to drainage. Some of this is self-certified by suitably registered trades, and some needs building control approval. In Scotland a building warrant may be needed for certain works. We arrange the right approvals and certificates.

How long will a whole-house renovation take?

On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

What happens if you find damp or rot?

If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

Do I need planning permission to renovate?

Most internal renovation work does not need planning permission, but it depends on what changes, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. Listed buildings usually need consent for internal and external changes. Altering windows, adding dormers or changing the outside appearance in a conservation area may also need permission. We check before quoting.

Near Highbury

Highbury and its N1, N4, N5 and N7 postcodes are part of our coverage. Homeowners in Islington, Holloway and Stamford Hill can also book a free survey with us and receive a written price for their job.

Ready for a written price?

Get a clearer idea of the cost of a whole-house renovation in Highbury with our guide-price tool, then book a survey at no charge when you're ready for a fixed figure.

Call freeFree quote