A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.
Homeowners in Selby usually consider a whole-house renovation for one of a few reasons: something has worn out, the house no longer suits the way they live, or they are getting it ready to sell. We visit, agree a specification and put a fixed price in writing. Most jobs like this take 8–24 weeks on site, depending on scope, and we work across North Yorkshire, including Goole, Pontefract and York.
- Guide price
- £42,500–£113,000 inc VAT
- Time on site
- 8–24 weeks on site, depending on scope
- Postcodes
- YO8
- Planning rules
- England
- Local area
- North Yorkshire
- Survey
- Free, with a written quote
What should you budget for a whole-house renovation in Selby?
Use the table to gauge the cost of a whole-house renovation in Selby before we visit. Figures include VAT and are scaled for Yorkshire and the Humber, coming out about 6% below the national guide, which gives £42,500–£113,000 overall. After a free survey, you receive a fixed written price.
| Type of job | What it usually involves | Guide in Selby |
|---|---|---|
| Light refurbishment | Decoration, flooring, minor repairs and perhaps one new kitchen or bathroom. | £14,000–£42,500 |
| Full refurbishment | Rewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house. | £42,500–£113,000 |
| Renovation with structural changes | A full refurbishment plus wall removal, layout changes or extra bathrooms. | £94,000–£169,000 |
The main things that change the figure:
- Whether rewiring, new heating and full replastering are needed
- Kitchen and bathroom specification
- Structural or layout changes and associated approvals
- Hidden problems such as damp, rot or outdated drainage
What’s included?
- Room-by-room survey and a planned order of works
- Strip-out of old kitchens, bathrooms, flooring and finishes
- Plastering, skimming and repairs to ceilings and walls
- New kitchen and bathroom fitted to your chosen specification
- Flooring, internal doors, skirting and joinery
- Decoration and a final clean before handover
Homes in North Yorkshire
York has medieval timber-framed, Georgian and Victorian buildings, Harrogate has stone Victorian villas and terraces, and the Dales and Moors are built of limestone and sandstone, often under stone-slate or pantile roofs. Teesside towns within the county, such as Middlesbrough and Redcar, have Victorian red-brick terraces and post-war estates.
Dales and Moors properties often need lime pointing, roof repairs and window designs acceptable within a national park. Teesside brick terraces suit loft rooms and rear extensions, and estate homes commonly take garage conversions.
That variety is why a guide price for a whole-house renovation in Selby is only a starting point; the survey shows what your particular property needs.
Planning and building rules in Selby
England, Wales, Scotland and Northern Ireland each handle planning a little differently. Selby comes under England, covered below, and we raise any questions with the council before your quote is finalised.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
Survey and measure
Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.
Your fixed price
We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.
Getting ready
Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.
The work itself
During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.
What you can expect from us
Common questions
How long does a full house renovation take?
A full renovation of a typical 3-bed house usually takes around 8–16 weeks on site, and longer if there are structural changes or extensive repairs. A light refresh may take only a few weeks. Material lead times for kitchens, windows and bathroom fittings also affect the programme. We give you a week-by-week plan with your quote and update it as the work progresses.
How much will a whole-house renovation cost in Selby?
As a guide, expect to pay £42,500–£113,000 including VAT for a whole-house renovation in Selby. That range is adjusted for Yorkshire and the Humber, which runs about 6% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.
What happens if you find damp or rot?
If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.
What happens at the survey?
We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a whole-house renovation, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.
What contingency should I allow?
A contingency is money set aside for problems found once work starts, such as rotten joists, hidden damp or wiring that is worse than expected. For older houses, setting aside at least 10–15% of the build cost is sensible. We look for warning signs during the survey and price known issues upfront. If something unexpected is found, we explain it and price it before carrying on.
Near Selby
Our coverage in Selby includes YO8. We also travel to Goole, Pontefract and York, so neighbouring addresses are looked after on exactly the same terms as those in town.