A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.
Across Shropshire, people look into a whole-house renovation to replace something worn out, to make the house work better for them, or to get it ready for a sale. We cover Telford, Shrewsbury, Wellington and Oswestry and the smaller towns around them, working to the rules that apply in England. Expect a guide of £44,000–£118,000, VAT included, in the West Midlands, and every quote follows a free visit.
- Guide price
- £44,000–£118,000 inc VAT
- Time on site
- 8–24 weeks on site, depending on scope
- Planning rules
- England
- Price level
- About 2% below the national guide
- Towns listed
- 4
- Survey
- Free, with a written quote
How much does a whole-house renovation cost in Shropshire?
Prices for a whole-house renovation vary from house to house, but in Shropshire most projects fall within £44,000–£118,000 including VAT. That reflects costs in the West Midlands, about 2% below the national guide. Treat the table as a budgeting aid; the written figure follows a survey we carry out for free.
| Type of job | What it usually involves | Guide in Shropshire |
|---|---|---|
| Light refurbishment | Decoration, flooring, minor repairs and perhaps one new kitchen or bathroom. | £14,500–£44,000 |
| Full refurbishment | Rewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house. | £44,000–£118,000 |
| Renovation with structural changes | A full refurbishment plus wall removal, layout changes or extra bathrooms. | £98,000–£176,000 |
The main things that change the figure:
- Whether rewiring, new heating and full replastering are needed
- Kitchen and bathroom specification
- Structural or layout changes and associated approvals
- Hidden problems such as damp, rot or outdated drainage
Scope of the work
- Room-by-room survey and a planned order of works
- Strip-out of old kitchens, bathrooms, flooring and finishes
- Rewiring and new consumer unit by qualified electricians, with certificates
- Plastering, skimming and repairs to ceilings and walls
- Flooring, internal doors, skirting and joinery
- Decoration and a final clean before handover
Homes in Shropshire
Shrewsbury and Ludlow are known for black-and-white timber-framed buildings alongside Georgian brick, and red sandstone is common in the north of the county. Telford was built as a new town from the late 1960s with large planned estates, and market towns such as Oswestry, Bridgnorth and Whitchurch mix historic centres with interwar and newer housing.
Timber-framed and stone buildings often need lime plaster, breathable finishes and roof repairs. Telford homes commonly suit extensions, window replacement and roofline or cladding renewal.
The Severn floods regularly in Shrewsbury and downstream, and the hills along the Welsh border are exposed to wind and heavier rain.
Planning and building rules in Shropshire
England, Wales, Scotland and Northern Ireland each handle planning a little differently. Shropshire comes under England, covered below, and we raise any questions with the council before your quote is finalised.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
How does the job run?
Free site survey
Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.
Written quote
We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.
Plan and prepare
Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.
Build and hand over
Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.
How we work
Frequently asked questions
In what order should renovation work be done?
A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.
How much will a whole-house renovation cost in Shropshire?
As a guide, expect to pay £44,000–£118,000 including VAT for a whole-house renovation in Shropshire. That range is adjusted for the West Midlands, which runs about 2% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.
How much does it cost to renovate a whole house?
A full refurbishment of a typical 3-bed house costs £44,000–£118,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.
Can we live in the house while it is renovated?
Living in a house during a full renovation is possible but hard, especially while rewiring, plastering and the kitchen and bathroom are being done. Many people move out for the noisiest weeks or stay elsewhere for the whole project. If you stay, we can phase the work room by room and keep one bathroom and a basic kitchen working for as long as possible. We discuss this at the survey.
Can I stay at home during the work?
In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.