A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.
Whatever prompted you to look into a whole-house renovation, whether wear and tear, a growing family or plans to move, we can survey your Weston-super-Mare home and give you a price in writing. Homes in the South West typically come in at £46,000–£122,000, VAT included, for this kind of work. We also cover Burnham-on-Sea, Clevedon and Penarth, and the same steps apply wherever you are in Somerset.
- Guide price
- £46,000–£122,000 inc VAT
- Time on site
- 8–24 weeks on site, depending on scope
- Postcodes
- BS22 and BS23
- Planning rules
- England
- Local area
- North Somerset
- Survey
- Free, with a written quote
Whole-house renovations prices in Weston-super-Mare
The table below shows guide prices for a whole-house renovation in Weston-super-Mare. They are based on rates in the South West, which run about 2% above the national guide, giving an overall range of £46,000–£122,000. All figures include VAT and are firmed up after a free site survey.
| Type of job | What it usually involves | Guide in Weston-super-Mare |
|---|---|---|
| Light refurbishment | Decoration, flooring, minor repairs and perhaps one new kitchen or bathroom. | £15,500–£46,000 |
| Full refurbishment | Rewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house. | £46,000–£122,000 |
| Renovation with structural changes | A full refurbishment plus wall removal, layout changes or extra bathrooms. | £102,000–£184,000 |
Expect these to shape the final quote:
- Size of the house and number of rooms being renovated
- Kitchen and bathroom specification
- Structural or layout changes and associated approvals
- Hidden problems such as damp, rot or outdated drainage
Scope of the work
- Strip-out of old kitchens, bathrooms, flooring and finishes
- Rewiring and new consumer unit by qualified electricians, with certificates
- Heating and plumbing upgrades by qualified engineers
- Plastering, skimming and repairs to ceilings and walls
- New kitchen and bathroom fitted to your chosen specification
- Flooring, internal doors, skirting and joinery
Homes in Somerset
Somerset's building stone varies widely: Bath stone in Bath, golden Ham stone around Yeovil, blue lias in villages on the Levels and Mendip stone in the north. Weston-super-Mare has Victorian villas and terraces, Taunton and Bridgwater have brick terraces and post-war estates, and new housing continues to spread around the larger towns.
Stone properties often need lime pointing, stone repairs and windows that respect conservation areas, especially in Bath. Brick terraces suit loft rooms and extensions, and estate homes commonly take garage conversions.
If your house in Weston-super-Mare fits one of these patterns, it helps us anticipate what a whole-house renovation will involve, though we always confirm the details on site.
Permissions for a whole-house renovation in Weston-super-Mare
England, Wales, Scotland and Northern Ireland each handle planning a little differently. Weston-super-Mare comes under England, covered below, and we raise any questions with the council before your quote is finalised.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
Free site survey
It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a whole-house renovation.
Price and scope agreed
We turn the survey notes into a written quote. The price is fixed for the specification we agree, and the document sets out materials, scope and payment stages in plain language.
Plan and prepare
Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.
Finish and handover
On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.
How we work
Frequently asked questions
How long does a full house renovation take?
A full renovation of a typical 3-bed house usually takes around 8–16 weeks on site, and longer if there are structural changes or extensive repairs. A light refresh may take only a few weeks. Material lead times for kitchens, windows and bathroom fittings also affect the programme. We give you a week-by-week plan with your quote and update it as the work progresses.
In what order should renovation work be done?
A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.
Who do I deal with during the job?
One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.
How much does it cost to renovate a whole house?
A full refurbishment of a typical 3-bed house costs £46,000–£122,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.
How long will a whole-house renovation take?
On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Also covering areas around Weston-super-Mare
We survey and quote throughout Weston-super-Mare's BS22 and BS23 postcodes and in surrounding places such as Burnham-on-Sea, Clevedon and Penarth. The process and pricing approach are identical in each of them.