Warwickshire · Extensions & Renovations

Whole-house renovations in Rugby

Guide price £44,000–£118,000 including VAT, typically 8–24 weeks on site, depending on scope, with a free site survey and a written fixed price.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Rugby

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

Every house in Rugby is a little different, so we never price a whole-house renovation from a brochure. We look at the structure, access and existing finishes first, then put in writing a fixed figure for the scope we settle on. As a rough steer, homeowners in the West Midlands should budget £44,000–£118,000 including VAT, with work typically taking 8–24 weeks on site, depending on scope.

Guide price
£44,000–£118,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
CV21 and CV22
Planning rules
England
Local area
Warwickshire
Survey
Free, with a written quote

What should you budget for a whole-house renovation in Rugby?

What should you budget for a whole-house renovation in Rugby? Use the figures below as a starting point. Prices in the West Midlands sit about 2% below the national guide, so the range here is £44,000–£118,000 including VAT. Your fixed price comes in writing once we've surveyed the property, at no charge.

Type of jobWhat it usually involvesGuide in Rugby
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£14,500–£44,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£44,000–£118,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£98,000–£176,000

Your price depends mostly on:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Structural or layout changes and associated approvals

What do you get?

  • Room-by-room survey and a planned order of works
  • Heating and plumbing upgrades by qualified engineers
  • Plastering, skimming and repairs to ceilings and walls
  • New kitchen and bathroom fitted to your chosen specification
  • Flooring, internal doors, skirting and joinery
  • Decoration and a final clean before handover
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

Local housing and a whole-house renovation

Stratford-upon-Avon and Warwick have timber-framed and Georgian buildings, and Leamington Spa is known for Regency stucco terraces and villas. Nuneaton and Bedworth have brick terraces from their mining and industrial past, Rugby mixes Victorian housing with large new estates, and southern villages near the Cotswolds use limestone and blue lias.

Regency and period homes may need render repairs, decorating and windows that suit conservation areas. Terraces suit loft conversions and extensions, and newer estate homes often take garage conversions and landscaping.

Knowing the typical building types in Warwickshire helps, but a survey of your own home in Rugby is what decides the right approach to a whole-house renovation.

Planning and building rules in Rugby

Each UK nation sets its own consent rules, and Rugby is in England. What follows is a plain summary; we check the specifics for your property with the council before pricing anything.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. Free site survey

    A free survey comes first. It gives us what we need to price a whole-house renovation properly, including dimensions, existing materials and access for deliveries, and gives you the chance to ask anything you like.

  2. Quote in writing

    Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.

  3. Getting ready

    With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Rugby property.

  4. Finish and handover

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

Working with SK Home Improvements

Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Common questions

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

How long will a whole-house renovation take?

On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

What happens if you find damp or rot?

If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.

How much does it cost to renovate a whole house?

A full refurbishment of a typical 3-bed house costs £44,000–£118,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.

Which parts of a renovation need building regulations approval?

Several parts of a renovation fall under building regulations, including rewiring and new circuits, new boilers and heating systems, structural changes such as removing walls, replacement windows and changes to drainage. Some of this is self-certified by suitably registered trades, and some needs building control approval. In Scotland a building warrant may be needed for certain works. We arrange the right approvals and certificates.

Nearby towns

We cover every part of Rugby, including CV21 and CV22, and nearby Daventry, Coventry and Bedworth. Wherever you are within that patch, the survey is free and the quote comes to you in writing.

Talk to us about a whole-house renovation

Get a clearer idea of the cost of a whole-house renovation in Rugby with our guide-price tool, then book a survey at no charge when you're ready for a fixed figure.

Call freeFree quote