West Midlands · Extensions & Renovations

Whole-house renovations in Aston

Covering B2, B3, B4 and B6 and the rest of Aston. Guide price £44,000–£118,000 inc VAT, confirmed after a free survey.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Aston

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

Whatever prompted you to look into a whole-house renovation, whether wear and tear, a growing family or plans to move, we can survey your Aston home and give you a price in writing. Homes in the West Midlands typically come in at £44,000–£118,000, VAT included, for this kind of work. We also cover Birmingham, Washwood Heath and Smethwick, and the same steps apply wherever you are in West Midlands.

Guide price
£44,000–£118,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
B2, B3, B4, B6 and B7
Planning rules
England
Local area
Birmingham
Survey
Free, with a written quote

Whole-house renovations prices in Aston

In Aston, guide figures for a whole-house renovation sit at £44,000–£118,000, VAT included. We set them using rates for the West Midlands, currently about 2% below the national guide. The table shows what pushes a project towards either end of the range; your own price is set after a free survey.

Type of jobWhat it usually involvesGuide in Aston
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£14,500–£44,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£44,000–£118,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£98,000–£176,000

The main things that change the figure:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Hidden problems such as damp, rot or outdated drainage

What do you get?

  • Room-by-room survey and a planned order of works
  • Strip-out of old kitchens, bathrooms, flooring and finishes
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Plastering, skimming and repairs to ceilings and walls
  • New kitchen and bathroom fitted to your chosen specification
  • Decoration and a final clean before handover
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

Homes in West Midlands

Red-brick Victorian and Edwardian terraces are common in the inner areas of Birmingham, Wolverhampton and the Black Country, ringed by large swathes of 1930s semis with bay windows and hipped roofs. You'll also find post-war council estates, some system-built blocks, Coventry's rebuilt centre and larger detached homes in Solihull and Sutton Coldfield.

1930s semis often suit side and rear extensions, hip-to-gable loft conversions and garage conversions. Victorian terraces tend to need repointing, roof work and replacement windows, and many have room for a side-return extension.

None of this holds for every street in Aston, which is why we look at your actual house before pricing a whole-house renovation rather than assuming from its age alone.

Permissions for a whole-house renovation in Aston

Homes in Aston come under the regulations for England, summarised below. We don't rely on general rules alone: we confirm the position for your address with the council before a quote goes out.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. A visit to your home

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a whole-house renovation, and photograph or measure anything the quote needs to reflect.

  2. Price and scope agreed

    The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.

  3. Booking the work

    With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Aston property.

  4. On site to finish

    During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.

Working with SK Home Improvements

Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.

Frequently asked questions

Can you combine a whole-house renovation with other work?

Yes. Because we manage several trades under one contract, we can plan a whole-house renovation alongside other work on your Aston home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.

Which parts of a renovation need building regulations approval?

Several parts of a renovation fall under building regulations, including rewiring and new circuits, new boilers and heating systems, structural changes such as removing walls, replacement windows and changes to drainage. Some of this is self-certified by suitably registered trades, and some needs building control approval. In Scotland a building warrant may be needed for certain works. We arrange the right approvals and certificates.

How much does it cost to renovate a whole house?

A full refurbishment of a typical 3-bed house costs £44,000–£118,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a whole-house renovation, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

How long does a full house renovation take?

A full renovation of a typical 3-bed house usually takes around 8–16 weeks on site, and longer if there are structural changes or extensive repairs. A light refresh may take only a few weeks. Material lead times for kitchens, windows and bathroom fittings also affect the programme. We give you a week-by-week plan with your quote and update it as the work progresses.

Also covering areas around Aston

We survey and quote throughout Aston's B2, B3, B4 and B6 postcodes and in surrounding places such as Birmingham, Washwood Heath and Smethwick. The process and pricing approach are identical in each of them.

Talk to us about a whole-house renovation

Planning a whole-house renovation in Aston? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.

Call freeFree quote