West Midlands · Extensions & Renovations

Whole-house renovations in West Bromwich

Guide price £44,000–£118,000 including VAT, typically 8–24 weeks on site, depending on scope, with a free site survey and a written fixed price.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in West Bromwich

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

We arrange a whole-house renovation for homeowners in West Bromwich and the wider West Midlands. The job is planned, priced and managed by us and carried out by tradespeople engaged under our contract, so there is one agreement and one contact. On a typical home the work takes 8–24 weeks on site, depending on scope, and guide pricing in the West Midlands is £44,000–£118,000, VAT included.

Guide price
£44,000–£118,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
B66, B67, B69, B70 and B71
Planning rules
England
Local area
Sandwell
Survey
Free, with a written quote

What should you budget for a whole-house renovation in West Bromwich?

The table below shows guide prices for a whole-house renovation in West Bromwich. They are based on rates in the West Midlands, which run about 2% below the national guide, giving an overall range of £44,000–£118,000. All figures include VAT and are firmed up after a free site survey.

Type of jobWhat it usually involvesGuide in West Bromwich
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£14,500–£44,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£44,000–£118,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£98,000–£176,000

Expect these to shape the final quote:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Structural or layout changes and associated approvals

What do you get?

  • Room-by-room survey and a planned order of works
  • Heating and plumbing upgrades by qualified engineers
  • Plastering, skimming and repairs to ceilings and walls
  • New kitchen and bathroom fitted to your chosen specification
  • Flooring, internal doors, skirting and joinery
  • Decoration and a final clean before handover
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

Building in West Bromwich

Red-brick Victorian and Edwardian terraces are common in the inner areas of Birmingham, Wolverhampton and the Black Country, ringed by large swathes of 1930s semis with bay windows and hipped roofs. You'll also find post-war council estates, some system-built blocks, Coventry's rebuilt centre and larger detached homes in Solihull and Sutton Coldfield.

1930s semis often suit side and rear extensions, hip-to-gable loft conversions and garage conversions. Victorian terraces tend to need repointing, roof work and replacement windows, and many have room for a side-return extension.

Knowing the typical building types in West Midlands helps, but a survey of your own home in West Bromwich is what decides the right approach to a whole-house renovation.

Permissions for a whole-house renovation in West Bromwich

Homes in West Bromwich come under the regulations for England, summarised below. We don't rely on general rules alone: we confirm the position for your address with the council before a quote goes out.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. Free site survey

    First, someone visits your home in West Bromwich to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Written quote

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a whole-house renovation.

  3. Dates and permissions

    With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your West Bromwich property.

  4. On site to finish

    During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.

What you can expect from us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Questions about a whole-house renovation in West Bromwich

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

Which parts of a renovation need building regulations approval?

Several parts of a renovation fall under building regulations, including rewiring and new circuits, new boilers and heating systems, structural changes such as removing walls, replacement windows and changes to drainage. Some of this is self-certified by suitably registered trades, and some needs building control approval. In Scotland a building warrant may be needed for certain works. We arrange the right approvals and certificates.

How long will a whole-house renovation take?

On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

How long does a full house renovation take?

A full renovation of a typical 3-bed house usually takes around 8–16 weeks on site, and longer if there are structural changes or extensive repairs. A light refresh may take only a few weeks. Material lead times for kitchens, windows and bathroom fittings also affect the programme. We give you a week-by-week plan with your quote and update it as the work progresses.

What contingency should I allow?

A contingency is money set aside for problems found once work starts, such as rotten joists, hidden damp or wiring that is worse than expected. For older houses, setting aside at least 10–15% of the build cost is sensible. We look for warning signs during the survey and price known issues upfront. If something unexpected is found, we explain it and price it before carrying on.

Also covering areas around West Bromwich

We survey and quote throughout West Bromwich's B66, B67, B69 and B70 postcodes and in surrounding places such as Smethwick, Wednesbury and Tipton. The process and pricing approach are identical in each of them.

Ready for a written price?

Get a clearer idea of the cost of a whole-house renovation in West Bromwich with our guide-price tool, then book a survey at no charge when you're ready for a fixed figure.

Call freeFree quote