Worcestershire · Extensions & Renovations

Whole-house renovations in Great Malvern

Covering WR14 and the rest of Great Malvern. Guide price £44,000–£118,000 inc VAT, confirmed after a free survey.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Great Malvern

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

We offer a whole-house renovation across Worcestershire, and Great Malvern is one of the places we cover, along with nearby Ledbury, Worcester and Tewkesbury. Before anything is agreed we visit, check the existing structure and talk through your options. You then receive a written quote setting out the full scope; for most homes in the West Midlands it sits within £44,000–£118,000 including VAT.

Guide price
£44,000–£118,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
WR14
Planning rules
England
Local area
Worcestershire
Survey
Free, with a written quote

How much does a whole-house renovation cost in Great Malvern?

Every figure below is a guide for a whole-house renovation in Great Malvern, inclusive of VAT. Regional pricing for the West Midlands works out about 2% below the national guide, and the overall span is £44,000–£118,000. The survey costs you nothing, and after it we commit to a firm price for your specification in writing.

Type of jobWhat it usually involvesGuide in Great Malvern
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£14,500–£44,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£44,000–£118,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£98,000–£176,000

The main things that change the figure:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Hidden problems such as damp, rot or outdated drainage

What’s included?

  • Strip-out of old kitchens, bathrooms, flooring and finishes
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Plastering, skimming and repairs to ceilings and walls
  • New kitchen and bathroom fitted to your chosen specification
  • Flooring, internal doors, skirting and joinery
  • Decoration and a final clean before handover
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

Homes in Worcestershire

Worcester has Georgian and Victorian streets and interwar suburbs, black-and-white timber framing survives in many villages, and Malvern has Victorian villas, some built in Malvern stone. Redditch was expanded as a new town from the 1960s, Kidderminster has carpet-era terraces, and Bromsgrove and Evesham mix older centres with newer estates.

Timber-framed and stone buildings call for lime plaster and careful repairs. Terraces suit loft conversions and rear extensions, and new-town homes often take window, roofline and cladding renewal.

For a whole-house renovation in Great Malvern, this means checking things like wall construction, roof structure and existing services before we put a figure on paper.

Planning and building rules in Great Malvern

England, Wales, Scotland and Northern Ireland each handle planning a little differently. Great Malvern comes under England, covered below, and we raise any questions with the council before your quote is finalised.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. A visit to your home

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a whole-house renovation, and photograph or measure anything the quote needs to reflect.

  2. Written quote

    After the survey we send a quote for a whole-house renovation that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.

  3. Plan and prepare

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. Finish and handover

    The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.

What you can expect from us

Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.

Questions about a whole-house renovation in Great Malvern

What happens if you find damp or rot?

If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

Can we live in the house while it is renovated?

Living in a house during a full renovation is possible but hard, especially while rewiring, plastering and the kitchen and bathroom are being done. Many people move out for the noisiest weeks or stay elsewhere for the whole project. If you stay, we can phase the work room by room and keep one bathroom and a basic kitchen working for as long as possible. We discuss this at the survey.

Do I need planning permission in Great Malvern?

It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Great Malvern is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.

How much does it cost to renovate a whole house?

A full refurbishment of a typical 3-bed house costs £44,000–£118,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.

Near Great Malvern

From WR14 to the edges of Great Malvern and on into Ledbury, Worcester and Tewkesbury, we can arrange a site visit and a written quote for your project, planned around dates that work for you.

Talk to us about a whole-house renovation

Request your free survey for a whole-house renovation in Great Malvern. Once we've seen the property, we'll send a written price, fixed for the work as specified, with no obligation.

Call freeFree quote