A new kitchen installation replaces your old units, worktops and appliances with a new layout fitted to your room, including the plumbing, electrics, tiling and finishing needed to leave a complete, working kitchen.
Whatever prompted you to look into a new kitchen, whether wear and tear, a growing family or plans to move, we can survey your Washington home and give you a price in writing. Homes in the North East typically come in at £7,200–£20,000, VAT included, for this kind of work. We also cover Chester-le-Street, Felling and Houghton-Le-Spring, and the same steps apply wherever you are in Tyne and Wear.
- Guide price
- £7,200–£20,000 inc VAT
- Time on site
- 1–3 weeks on site
- Postcodes
- NE37 and NE38
- Planning rules
- England
- Local area
- Sunderland
- Survey
- Free, with a written quote
Kitchens prices in Washington
Below is a breakdown of typical costs for a new kitchen in Washington. Because rates in the North East are about 10% below the national guide, the overall guide comes to £7,200–£20,000, including VAT. Size, materials and access move the figure, and a free-of-charge survey settles it.
| Type of job | What it usually involves | Guide in Washington |
|---|---|---|
| Value kitchen | Standard units and laminate worktops in a small or medium room, keeping the existing layout. | £4,500–£8,100 |
| Mid-range kitchen | Better units, some layout changes, built-in appliances and a choice of worktops. | £8,100–£18,000 |
| Premium kitchen | High-end units, stone worktops, an island and premium appliances in a larger room. | £18,000–£36,000 |
Your price depends mostly on:
- Length of units and the size of the room
- Unit range, door finish and worktop material
- Appliances, including built-in and premium models
- Tiling, flooring and any wall removal or replastering
What does the job include in Washington?
- Removal and disposal of the old kitchen
- Plumbing for sink, dishwasher and washing machine
- Gas connections by a suitably registered engineer where needed
- Units, worktops and appliances fitted, levelled and adjusted
- Splashbacks or wall tiling to your chosen design
- Making good, extractor ducting and a final clean
Local housing and a new kitchen
Tyneside flats, pairs of upper and lower flats behind a terraced front, are a distinctive feature of Newcastle and Gateshead. Sunderland is known for its single-storey terraced 'Sunderland cottages', and both cities have Victorian brick and stone terraces, interwar estates and post-war housing. Washington was built as a new town from the 1960s.
Cold North Sea winds and sea frets affect the coast at Tynemouth and South Shields, and former coal workings underlie parts of the area.
In Washington, as elsewhere in Tyne and Wear, we take the building's age and construction into account before recommending anything, because both can change what is involved in a new kitchen.
Permissions for a new kitchen in Washington
As Washington is in England, read the following with that system of planning and building control in mind. We check what applies to your house with the council before you receive a quote.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
Free site survey
A free survey comes first. It gives us what we need to price a new kitchen properly, including dimensions, existing materials and access for deliveries, and gives you the chance to ask anything you like.
Quote in writing
After the survey we send a quote for a new kitchen that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.
Getting ready
Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.
Build and hand over
The work is carried out to the agreed specification, with floors and furniture protected and the site kept tidy. At the end we clean up, walk through the finished job with you and hand over any certificates.
Working with SK Home Improvements
Kitchens in Washington: questions
How long will I be without a kitchen?
You are usually without a working kitchen for one to two weeks, from strip-out until the sink and hob are reconnected. If stone worktops are being made to template, we can fit a temporary worktop so you can use the sink while you wait. Many people set up a microwave, kettle and fridge in another room. We plan the order of work to keep this period as short as possible.
How long will a new kitchen take?
On a typical home, allow 1–3 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Do I need planning permission in Washington?
It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Washington is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.
What should I do to prepare for my kitchen fitting?
Before fitting starts, empty all cupboards and drawers, clear worktops and remove anything from the walls. Plan where you will make drinks and simple meals for a week or two, and agree where deliveries will be stored, as units take up a lot of space. Make sure we can access the stopcock, fuse board and gas meter. We confirm the delivery date and start date in advance.
Can a new kitchen be part of a knock-through?
A new kitchen often goes hand in hand with removing a wall to create an open-plan kitchen-diner. The wall removal, steel beam and building control approval are done first, then the plastering, and finally the kitchen is fitted into the new space. Doing both under one plan avoids fitting a kitchen twice and lets you design the layout for the larger room.
Nearby towns
From NE37 and NE38 to the edges of Washington and on into Chester-le-Street, Felling and Houghton-Le-Spring, we can arrange a site visit and a written quote for your project, planned around dates that work for you.

