Painting and decorating is preparing and finishing the surfaces of a home, including filling, sanding, priming and painting walls, ceilings and woodwork, hanging wallpaper and painting exterior walls and joinery, to protect them and refresh how rooms look.
If you are planning painting and decorating anywhere in Northamptonshire, including Northampton, Corby, Kettering and Wellingborough, we can visit, measure up and talk through the options. The planning and building regulations we work to are those for England, and we check them for your address before quoting. Prices remain guide figures for the East Midlands, at £1,150–£2,900 including VAT, until the survey is done.
- Guide price
- £1,150–£2,900 inc VAT
- Time on site
- 1–2 days per room; 3–7 days for a house exterior
- Planning rules
- England
- Price level
- About 4% below the national guide
- Towns listed
- 7
- Survey
- Free, with a written quote
Painting and decorating prices in Northamptonshire
To help you plan, we show what painting and decorating typically costs in Northamptonshire instead of holding figures back for a sales call. The range is £1,150–£2,900 with VAT, using rates in the East Midlands that are about 4% below the national guide. A free survey then fixes your actual price.
| Type of job | What it usually involves | Guide in Northamptonshire |
|---|---|---|
| Single room | Walls, ceiling and woodwork in one average bedroom or living room. | £350–£850 |
| House exterior | Masonry and joinery on a typical semi, including access equipment. | £2,400–£5,800 |
| Whole interior of a 3-bed house | Every room, hallway, stairs and landing, including woodwork. | £2,900–£6,200 |
The main things that change the figure:
- Number and size of rooms, including ceiling height
- Amount of preparation, filling and repairs needed
- Whether woodwork, doors and wallpaper are included
- Paint quality, colour changes and number of coats
What’s included?
- Filling cracks and holes, sanding and spot priming
- Mist coat on new plaster before finishing coats
- Two finishing coats to walls and ceilings as standard
- Woodwork sanded, primed where bare, and painted
- Wallpaper stripped or hung where included
- Furniture replaced, waste removed and a final tidy-up
Homes in Northamptonshire
Orange-brown ironstone is the signature material of many Northamptonshire villages, with limestone and Collyweston stone-slate roofs in the north-east. Northampton has Victorian terraces from its shoemaking era, Corby expanded as a post-war steel town, and Wellingborough, Kettering and Daventry have interwar, post-war and recent estates.
Ironstone cottages often need lime repairs and careful repointing. Terraces suit loft conversions and kitchen extensions, while estate homes commonly take garage conversions, porches and driveways.
An inland county with cold winters and clay soils that can shrink in dry spells; ironstone weathers and needs a suitable mortar.
Planning and building rules in Northamptonshire
Each UK nation sets its own consent rules, and Northamptonshire is in England. What follows is a plain summary; we check the specifics for your property with the council before pricing anything.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
Survey and measure
It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about painting and decorating.
Quote in writing
We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.
Getting ready
Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.
Build and hand over
The work is carried out to the agreed specification, with floors and furniture protected and the site kept tidy. At the end we clean up, walk through the finished job with you and hand over any certificates.
What you can expect from us
Frequently asked questions
How long will painting and decorating take?
On a typical home, allow 1–2 days per room; 3–7 days for a house exterior. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Why is preparation so important?
Preparation decides how good the finish looks and how long it lasts. Filling cracks, sanding glossy surfaces, washing greasy areas and priming bare wood all help paint grip and dry evenly. Skipping it leads to visible repairs, peeling and patchy colour. Most of the time on a decorating job goes into preparation, and our quotes always allow for it.
How long does it take to decorate a room?
Decorating an average room usually takes one to two days, allowing time for preparation, a mist coat or primer where needed and two finishing coats. Hallways, stairs and landings take longer because of the height and the amount of woodwork. Wallpapering adds time for stripping and lining. We give you a schedule so you know which rooms will be out of use and when.
Do I need planning permission in Northamptonshire?
It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Northamptonshire is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.
When is the right time to paint the outside of a house?
Exterior painting needs dry weather and mild temperatures, so late spring to early autumn is usually the right time. Paint should not be applied to damp surfaces, in rain or frost, or in strong direct sun. Surfaces need time to dry out after rain before work starts. We plan exterior work around the forecast and pause if conditions turn.
Towns in Northamptonshire
Looking for painting and decorating somewhere in Northamptonshire? Start with the towns below; each links to a page with pricing for your region and coverage details.

