London · Landscaping & Outdoor Spaces

Patios and paving in Canning Town

Typical time on site: 3–7 days on site. Guide price in Canning Town: £3,200–£7,200 including VAT.

Light grey porcelain patio outside French doors

Free survey in Canning Town

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A patio is a paved outdoor area next to the house or in the garden, laid in porcelain, natural stone or concrete slabs on a compacted sub-base and mortar bed, with falls that direct rainwater away from the house.

Getting a new patio right in Canning Town starts with understanding the house you already have: its age, how it was built and what has been altered over the years. We survey first, then commit on paper to a price that holds as long as the scope stays the same. Across London, guide prices run at £3,200–£7,200 including VAT, and homes in Blackwall, Stratford and Bow are covered too.

Guide price
£3,200–£7,200 inc VAT
Time on site
3–7 days on site
Postcodes
E3, E6, E13, E14 and E15
Planning rules
England
Local area
Greater London
Survey
Free, with a written quote

Patios and paving prices in Canning Town

Here is how the guide price for a new patio breaks down in Canning Town. We start from national figures and adjust for London, which comes out about 30% above the national guide. The resulting range, VAT included, is £3,200–£7,200, and a survey, at no cost to you, firms it up.

Type of jobWhat it usually involvesGuide in Canning Town
Small patio or pathAround 10m² of concrete slabs or a garden path.£1,300–£3,200
Typical 20m² patioSandstone or porcelain on a full sub-base with jointing and edging.£3,200–£7,200
Large or multi-level patioBigger areas, steps, retaining walls or premium stone.£7,200–£15,500

The main things that change the figure:

  • Patio area and the amount of excavation
  • Slab material, size and laying pattern
  • Ground levels, slopes, steps and retaining walls
  • Drainage needed to keep water away from the house

What do you get?

  • Survey of levels, damp-proof course, drainage and access
  • Compacted MOT Type 1 sub-base
  • Slabs laid on a full mortar bed with falls away from the house
  • Jointing with mortar or a brush-in compound
  • Edging and neat cuts around drains and walls
  • Site cleared, waste removed and paving cleaned
PorcelainHard-wearing, stain-resistant slabs that stay looking clean and need little upkeep.
Slate or graniteDense, premium natural stone in dark or speckled tones.
Concrete slabsA lower-cost, practical option in a range of colours and textures.
Steps and raised patiosMulti-level patios with steps and retaining walls for sloping gardens.

Building in Canning Town

London's housing is dominated by Victorian and Edwardian terraces, often in yellow London stock brick, with Georgian terraces in central districts and mansion blocks across many inner areas. Outer boroughs have large belts of interwar semis, and there are extensive post-war council estates. Many houses have been split into flats, and conservation areas are widespread.

Terraces suit side-return extensions and rear dormer loft conversions; interwar semis commonly take hip-to-gable lofts. Shared party walls, restricted parking and conservation rules often shape the plans and the programme.

In Canning Town, as elsewhere in London, we take the building's age and construction into account before recommending anything, because both can change what is involved in a new patio.

Planning and building rules in Canning Town

Which rules apply depends on where you live. For Canning Town, the answer is England, and the points below reflect that; we verify them with the council before quoting.

A ground-level patio in a back garden does not usually need planning permission in England. Raised decks or platforms more than 30 cm high do.

Building Regulations do not normally apply to patios, but levels must stay below the damp-proof course and drain away from the house.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. We look at the job

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a new patio, and photograph or measure anything the quote needs to reflect.

  2. Written quote

    After the survey we send a quote for a new patio that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.

  3. Plan and prepare

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. On site to finish

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

Working with SK Home Improvements

Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.

Patios and paving in Canning Town: questions

Which postcodes in Canning Town do you cover?

We cover E3, E6, E13 and E14, along with the rest of London. If your postcode is not listed, get in touch anyway: our coverage is UK-wide, and we can usually arrange a survey wherever you live. Enter your postcode in the guide-price tool or contact form and we will confirm.

How long does it take to lay a patio?

Laying a typical 20m² patio takes around three to five days, from excavation and sub-base to laying, jointing and cleaning. Larger or multi-level patios with steps and walls take longer. The mortar bed needs time to set, so light foot traffic is usually fine after a day or two and furniture can go on after about a week. We confirm timings with your quote.

How do you make sure water drains away from the house?

A patio needs a gentle fall, usually a little over 1 in 80, so rainwater runs away from the house towards the garden, a drain or a soakaway. The surface should also sit well below the damp-proof course. If the patio meets a door threshold, a channel drain may be needed. We set levels with string lines and check falls as we lay each section.

Does a patio need planning permission?

Most patios do not need planning permission, but it depends on the size, height and location, your home's position, whether it is listed or in a conservation area, and which UK nation you are in. Raised patios or decking more than a small height above the ground may need permission because of overlooking. We check the position for your garden before quoting.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

Near Canning Town

Our coverage in Canning Town includes E3, E6, E13 and E14. We also travel to Blackwall, Stratford and Bow, so neighbouring addresses are looked after on exactly the same terms as those in town.

Ready for a written price?

Ready to talk about a new patio in Canning Town? Book a free site survey and we'll send you a written, fixed-price quote for the specification you choose.

Call freeFree quote