Scotland · Roofing & Cladding

Roof replacement in Aberdeen and Aberdeenshire

Guide price £6,700–£14,500 including VAT across Aberdeen and Aberdeenshire, with a free site survey and a written fixed price.

Pitched roof half re-tiled, with battens and membrane on the other half

Free survey in Aberdeen and Aberdeenshire

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A roof replacement, or re-roof, strips the old tiles or slates, battens and felt from a pitched roof and replaces them with a new breathable membrane, battens and covering, repairing timbers and renewing ridges, valleys and flashings at the same time.

Across Aberdeen and Aberdeenshire, people look into a new roof to replace something worn out, to make the house work better for them, or to get it ready for a sale. We cover Aberdeen, Peterhead, Nigg and Inverurie and the smaller towns around them, working to the rules that apply in Scotland. Expect a guide of £6,700–£14,500, VAT included, in Scotland, and every quote follows a free visit.

Guide price
£6,700–£14,500 inc VAT
Time on site
1–2 weeks on site, plus scaffolding time
Planning rules
Scotland
Price level
About 4% below the national guide
Towns listed
4
Survey
Free, with a written quote

How much does a new roof cost in Aberdeen and Aberdeenshire?

Below is a breakdown of typical costs for a new roof in Aberdeen and Aberdeenshire. Because rates in Scotland are about 4% below the national guide, the overall guide comes to £6,700–£14,500, including VAT. Size, materials and access move the figure, and a free-of-charge survey settles it.

Type of jobWhat it usually involvesGuide in Aberdeen and Aberdeenshire
Terraced house or bungalowA smaller pitched roof re-covered in concrete or clay tiles, including scaffolding.£4,800–£9,600
Typical semi-detachedA 3-bed semi re-roofed in concrete or clay tiles with new membrane, battens and leadwork.£6,700–£14,500
Detached or natural slateLarger or more complex roofs, or any roof finished in natural slate.£11,500–£24,000

Your price depends mostly on:

  • Roof area, pitch and the number of hips, valleys and dormers
  • Covering material: concrete tile, clay tile or natural slate
  • Condition of rafters, fascias and other timbers
  • Chimneys, leadwork and roof windows to rework

What do you get?

  • Survey of the covering, timbers, chimneys and loft ventilation
  • Scaffolding with edge protection, erected and removed
  • Repairs or replacement of damaged rafters and fascia boards
  • New tiles or slates, or sound originals refitted where suitable
  • Ridges, hips and verges dry-fixed or bedded, with new leadwork
  • Waste removal by skip and a clean site on completion
Concrete interlocking tilesDurable, lower-cost tiles that are quick to lay, common on post-war houses.
Clay plain tilesSmall traditional tiles that weather well and suit period and conservation-area homes.
Natural slateLong-lasting slate with a classic look, laid on a well-ventilated roof.
Dry-fix ridge and vergeMechanically fixed ridges and verges that need far less mortar upkeep.

Housing across Aberdeen and Aberdeenshire

Aberdeen is built largely of grey granite, from tenements and terraces to granite villas in the West End, with post-war council housing and newer estates on the outskirts. Across Aberdeenshire, harled stone cottages, fishing-town terraces in Peterhead and Fraserburgh, and modern developments in commuter towns such as Westhill and Ellon are common.

Granite walls need repointing with a mortar matched to the stone, and slate roofs often want attention after hard winters. Harled cottages need breathable finishes, while newer estates commonly add extensions, garage conversions and driveways.

Cold North Sea winds, coastal haar and hard winter frosts are routine, so roofs, harling and exposed fixings need a robust specification.

Do you need permission in Aberdeen and Aberdeenshire?

England, Wales, Scotland and Northern Ireland each handle planning a little differently. Aberdeen and Aberdeenshire comes under Scotland, covered below, and we raise any questions with the council before your quote is finalised.

In Scotland, like-for-like re-roofing does not usually need planning permission, except on listed buildings or in conservation areas.

Like-for-like re-covering does not usually need a building warrant, but structural changes or new roof windows can. Bats are protected across the UK; if they roost under roof tiles, soffits or fascias, work stops and a licensed ecologist advises before it restarts.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. We look at the job

    A free survey comes first. It gives us what we need to price a new roof properly, including dimensions, existing materials and access for deliveries, and gives you the chance to ask anything you like.

  2. Your fixed price

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Getting ready

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. On site to finish

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

How we work

Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.

Frequently asked questions

How do I know if I need a new roof or just repairs?

A roof needs replacing when problems are widespread, not isolated. Signs include many slipped, cracked or porous tiles, sagging between rafters, daylight or damp in the loft, perished felt that crumbles to the touch and repeated leaks in different places. A few slipped tiles or a loose ridge can usually be repaired. We inspect from outside and inside the loft and tell you honestly which is needed.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a new roof, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

How much does a new roof cost?

Re-roofing a typical 3-bed semi costs £6,700–£14,500, including scaffolding, new membrane and battens. As a guide, allow roughly £70–£160 per square metre of roof plus fixed costs for scaffolding and waste. Concrete tiles sit at the lower end and natural slate at the top. Hips, valleys, chimneys and timber repairs add to the price. We confirm a fixed figure after inspecting the roof and loft.

Do I need planning permission in Aberdeen and Aberdeenshire?

It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Aberdeen and Aberdeenshire is in Scotland, so Scotland's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.

How long does a roof replacement take?

Re-roofing a typical semi-detached house takes around one to two weeks once scaffolding is up, depending on the roof's size, complexity and the weather. Smaller terraced roofs can take a few days. Scaffolding usually goes up a day or two before work starts and comes down once everything is inspected. We give you a programme and keep the roof weathertight overnight.

Towns in Aberdeen and Aberdeenshire

Find your town below. Every place listed in Aberdeen and Aberdeenshire is covered for a new roof, with the same survey, written quote and fixed-price process.

Planning a new roof in Aberdeen and Aberdeenshire?

Start with a free site survey for a new roof in Aberdeen and Aberdeenshire. You'll receive a written quote showing exactly what is included and how the payments are staged.

Call freeFree quote