Argyll and Bute · Roofing & Cladding

Roof replacement in Dunoon

From the first visit to the final check, a new roof in Dunoon is planned and managed for you.

Pitched roof half re-tiled, with battens and membrane on the other half

Free survey in Dunoon

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A roof replacement, or re-roof, strips the old tiles or slates, battens and felt from a pitched roof and replaces them with a new breathable membrane, battens and covering, repairing timbers and renewing ridges, valleys and flashings at the same time.

Anyone planning a new roof in Dunoon wants three things: a clear price, a realistic timetable and a tidy job. We publish a guide of £6,700–£14,500 including VAT for Scotland up front, explain that work normally takes 1–2 weeks on site, plus scaffolding time, and confirm both in writing after a free survey of your property.

Guide price
£6,700–£14,500 inc VAT
Time on site
1–2 weeks on site, plus scaffolding time
Postcodes
PA23
Planning rules
Scotland
Local area
Argyll and Bute
Survey
Free, with a written quote

Roof replacement prices in Dunoon

To help you plan, we show what a new roof typically costs in Dunoon instead of holding figures back for a sales call. The range is £6,700–£14,500 with VAT, using rates in Scotland that are about 4% below the national guide. A free survey then fixes your actual price.

Type of jobWhat it usually involvesGuide in Dunoon
Terraced house or bungalowA smaller pitched roof re-covered in concrete or clay tiles, including scaffolding.£4,800–£9,600
Typical semi-detachedA 3-bed semi re-roofed in concrete or clay tiles with new membrane, battens and leadwork.£6,700–£14,500
Detached or natural slateLarger or more complex roofs, or any roof finished in natural slate.£11,500–£24,000

What moves the price up or down:

  • Roof area, pitch and the number of hips, valleys and dormers
  • Covering material: concrete tile, clay tile or natural slate
  • Condition of rafters, fascias and other timbers
  • Chimneys, leadwork and roof windows to rework

Scope of the work

  • Scaffolding with edge protection, erected and removed
  • Stripping old tiles or slates, battens and felt in stages
  • Repairs or replacement of damaged rafters and fascia boards
  • Breathable membrane and new treated battens
  • Ridges, hips and verges dry-fixed or bedded, with new leadwork
  • Waste removal by skip and a clean site on completion
Concrete interlocking tilesDurable, lower-cost tiles that are quick to lay, common on post-war houses.
Natural slateLong-lasting slate with a classic look, laid on a well-ventilated roof.
Fibre cement or synthetic slateA lighter, lower-cost alternative to natural slate with a similar appearance.
Dry-fix ridge and vergeMechanically fixed ridges and verges that need far less mortar upkeep.

Homes in Argyll and Bute

Much of Argyll and Bute is rural and coastal, with whitewashed or harled stone cottages, slate roofs and island homes. Helensburgh has Victorian villas, Oban, Dunoon and Rothesay have Victorian seaside terraces, and post-war and newer housing surrounds the main towns.

Stone cottages need lime harling, repointing and slate roof repairs; villas may need roof and window renewal. Island and remote properties need the programme planned around ferries, deliveries and weather.

These patterns matter for a new roof: older walls, roofs and floors in Dunoon can need different materials or extra preparation compared with newer homes.

Do you need permission in Dunoon?

For anyone in Dunoon, the relevant framework is Scotland's. The summary below is general, so we always contact the council about your address before putting a price in writing.

In Scotland, like-for-like re-roofing does not usually need planning permission, except on listed buildings or in conservation areas.

Like-for-like re-covering does not usually need a building warrant, but structural changes or new roof windows can. Bats are protected across the UK; if they roost under roof tiles, soffits or fascias, work stops and a licensed ecologist advises before it restarts.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. Free site survey

    Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.

  2. Your fixed price

    The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.

  3. Dates and permissions

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a new roof are in place before the first day on site.

  4. Finish and handover

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

What you can expect from us

Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.

Common questions

How long does a roof replacement take?

Re-roofing a typical semi-detached house takes around one to two weeks once scaffolding is up, depending on the roof's size, complexity and the weather. Smaller terraced roofs can take a few days. Scaffolding usually goes up a day or two before work starts and comes down once everything is inspected. We give you a programme and keep the roof weathertight overnight.

Do I need planning permission in Dunoon?

It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Dunoon is in Scotland, so Scotland's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.

Do I need planning permission to replace my roof?

Planning permission is not usually needed to re-roof in similar materials, but it depends on the change, your home's location, whether it is listed or in a conservation area, and which UK nation you live in. Changing the roof shape, height or covering material can need permission. Listed buildings need consent for re-roofing. We check the position for your home before quoting.

Can my old tiles or slates be reused?

Old tiles or slates can sometimes be reused if they are sound, which can help keep the look of a period house. Many older concrete tiles and some slates are porous, cracked or have failing fixing nibs, so they would not last. Reclaimed slates or tiles can make up shortfalls. We check a sample during the survey and explain the cost difference.

How much will a new roof cost in Dunoon?

As a guide, expect to pay £6,700–£14,500 including VAT for a new roof in Dunoon. That range is adjusted for Scotland, which runs about 4% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.

Near Dunoon

Live in Dunoon? Our coverage takes in the PA23 postcode areas and reaches out to Greenock, Helensburgh and Isle of Bute, so homes on the outskirts and in the next town along are included.

Ready for a written price?

Planning a new roof in Dunoon? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.

Call freeFree quote