Renfrewshire and Inverclyde · Roofing & Cladding

Roof replacement in Erskine

From the first visit to the final check, a new roof in Erskine is planned and managed for you.

Pitched roof half re-tiled, with battens and membrane on the other half

Free survey in Erskine

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A roof replacement, or re-roof, strips the old tiles or slates, battens and felt from a pitched roof and replaces them with a new breathable membrane, battens and covering, repairing timbers and renewing ridges, valleys and flashings at the same time.

We offer a new roof across Renfrewshire and Inverclyde, and Erskine is one of the places we cover, along with nearby Clydebank, Renfrew and Bearsden. Before anything is agreed we visit, check the existing structure and talk through your options. You then receive a written quote setting out the full scope; for most homes in Scotland it sits within £6,700–£14,500 including VAT.

Guide price
£6,700–£14,500 inc VAT
Time on site
1–2 weeks on site, plus scaffolding time
Postcodes
G60, G81, PA7 and PA8
Planning rules
Scotland
Local area
Renfrewshire
Survey
Free, with a written quote

What should you budget for a new roof in Erskine?

Here is how the guide price for a new roof breaks down in Erskine. We start from national figures and adjust for Scotland, which comes out about 4% below the national guide. The resulting range, VAT included, is £6,700–£14,500, and a survey, at no cost to you, firms it up.

Type of jobWhat it usually involvesGuide in Erskine
Terraced house or bungalowA smaller pitched roof re-covered in concrete or clay tiles, including scaffolding.£4,800–£9,600
Typical semi-detachedA 3-bed semi re-roofed in concrete or clay tiles with new membrane, battens and leadwork.£6,700–£14,500
Detached or natural slateLarger or more complex roofs, or any roof finished in natural slate.£11,500–£24,000

Your price depends mostly on:

  • Roof area, pitch and the number of hips, valleys and dormers
  • Covering material: concrete tile, clay tile or natural slate
  • Condition of rafters, fascias and other timbers
  • Scaffolding, access and the height of the house

What does the job include in Erskine?

  • Survey of the covering, timbers, chimneys and loft ventilation
  • Scaffolding with edge protection, erected and removed
  • Stripping old tiles or slates, battens and felt in stages
  • Repairs or replacement of damaged rafters and fascia boards
  • Breathable membrane and new treated battens
  • Ridges, hips and verges dry-fixed or bedded, with new leadwork
Concrete interlocking tilesDurable, lower-cost tiles that are quick to lay, common on post-war houses.
Natural slateLong-lasting slate with a classic look, laid on a well-ventilated roof.
Fibre cement or synthetic slateA lighter, lower-cost alternative to natural slate with a similar appearance.
Dry-fix ridge and vergeMechanically fixed ridges and verges that need far less mortar upkeep.

What are homes like around Erskine?

Paisley has sandstone tenements and terraces from its textile era, Greenock and Port Glasgow have tenements and housing climbing the hills above the Clyde, and Gourock and Kilmacolm have Victorian villas. Post-war estates and newer private housing surround the towns, and roughcast is a common finish.

Roughcast and tenement buildings commonly need re-rendering, window replacement and roof work. Villas suit kitchen extensions and landscaping, and semis often take loft conversions and driveways.

None of this holds for every street in Erskine, which is why we look at your actual house before pricing a new roof rather than assuming from its age alone.

Do you need permission in Erskine?

For anyone in Erskine, the relevant framework is Scotland's. The summary below is general, so we always contact the council about your address before putting a price in writing.

In Scotland, like-for-like re-roofing does not usually need planning permission, except on listed buildings or in conservation areas.

Like-for-like re-covering does not usually need a building warrant, but structural changes or new roof windows can. Bats are protected across the UK; if they roost under roof tiles, soffits or fascias, work stops and a licensed ecologist advises before it restarts.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. A visit to your home

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a new roof.

  2. Quote in writing

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Getting ready

    We handle the paperwork side: checking whether planning permission or building control approval is needed, submitting applications where they are, and scheduling the trades and materials around your dates.

  4. On site to finish

    Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.

What you can expect from us

Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Frequently asked questions

How much does a new roof cost?

Re-roofing a typical 3-bed semi costs £6,700–£14,500, including scaffolding, new membrane and battens. As a guide, allow roughly £70–£160 per square metre of roof plus fixed costs for scaffolding and waste. Concrete tiles sit at the lower end and natural slate at the top. Hips, valleys, chimneys and timber repairs add to the price. We confirm a fixed figure after inspecting the roof and loft.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

How do I know if I need a new roof or just repairs?

A roof needs replacing when problems are widespread, not isolated. Signs include many slipped, cracked or porous tiles, sagging between rafters, daylight or damp in the loft, perished felt that crumbles to the touch and repeated leaks in different places. A few slipped tiles or a loose ridge can usually be repaired. We inspect from outside and inside the loft and tell you honestly which is needed.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a new roof, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

How long does a roof replacement take?

Re-roofing a typical semi-detached house takes around one to two weeks once scaffolding is up, depending on the roof's size, complexity and the weather. Smaller terraced roofs can take a few days. Scaffolding usually goes up a day or two before work starts and comes down once everything is inspected. We give you a programme and keep the roof weathertight overnight.

Nearby towns

From G60, G81, PA7 and PA8 to the edges of Erskine and on into Clydebank, Renfrew and Bearsden, we can arrange a site visit and a written quote for your project, planned around dates that work for you.

Planning a new roof in Erskine?

Want to know what a new roof would cost for your house in Erskine? Our guide-price tool gives you a range, and a free survey turns it into a written quote.

Call freeFree quote