A roof replacement, or re-roof, strips the old tiles or slates, battens and felt from a pitched roof and replaces them with a new breathable membrane, battens and covering, repairing timbers and renewing ridges, valleys and flashings at the same time.
We offer a new roof across Renfrewshire and Inverclyde, and Erskine is one of the places we cover, along with nearby Clydebank, Renfrew and Bearsden. Before anything is agreed we visit, check the existing structure and talk through your options. You then receive a written quote setting out the full scope; for most homes in Scotland it sits within £6,700–£14,500 including VAT.
- Guide price
- £6,700–£14,500 inc VAT
- Time on site
- 1–2 weeks on site, plus scaffolding time
- Postcodes
- G60, G81, PA7 and PA8
- Planning rules
- Scotland
- Local area
- Renfrewshire
- Survey
- Free, with a written quote
What should you budget for a new roof in Erskine?
Here is how the guide price for a new roof breaks down in Erskine. We start from national figures and adjust for Scotland, which comes out about 4% below the national guide. The resulting range, VAT included, is £6,700–£14,500, and a survey, at no cost to you, firms it up.
| Type of job | What it usually involves | Guide in Erskine |
|---|---|---|
| Terraced house or bungalow | A smaller pitched roof re-covered in concrete or clay tiles, including scaffolding. | £4,800–£9,600 |
| Typical semi-detached | A 3-bed semi re-roofed in concrete or clay tiles with new membrane, battens and leadwork. | £6,700–£14,500 |
| Detached or natural slate | Larger or more complex roofs, or any roof finished in natural slate. | £11,500–£24,000 |
Your price depends mostly on:
- Roof area, pitch and the number of hips, valleys and dormers
- Covering material: concrete tile, clay tile or natural slate
- Condition of rafters, fascias and other timbers
- Scaffolding, access and the height of the house
What does the job include in Erskine?
- Survey of the covering, timbers, chimneys and loft ventilation
- Scaffolding with edge protection, erected and removed
- Stripping old tiles or slates, battens and felt in stages
- Repairs or replacement of damaged rafters and fascia boards
- Breathable membrane and new treated battens
- Ridges, hips and verges dry-fixed or bedded, with new leadwork
What are homes like around Erskine?
Paisley has sandstone tenements and terraces from its textile era, Greenock and Port Glasgow have tenements and housing climbing the hills above the Clyde, and Gourock and Kilmacolm have Victorian villas. Post-war estates and newer private housing surround the towns, and roughcast is a common finish.
Roughcast and tenement buildings commonly need re-rendering, window replacement and roof work. Villas suit kitchen extensions and landscaping, and semis often take loft conversions and driveways.
None of this holds for every street in Erskine, which is why we look at your actual house before pricing a new roof rather than assuming from its age alone.
Do you need permission in Erskine?
For anyone in Erskine, the relevant framework is Scotland's. The summary below is general, so we always contact the council about your address before putting a price in writing.
In Scotland, like-for-like re-roofing does not usually need planning permission, except on listed buildings or in conservation areas.
Like-for-like re-covering does not usually need a building warrant, but structural changes or new roof windows can. Bats are protected across the UK; if they roost under roof tiles, soffits or fascias, work stops and a licensed ecologist advises before it restarts.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
A visit to your home
It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a new roof.
Quote in writing
We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.
Getting ready
We handle the paperwork side: checking whether planning permission or building control approval is needed, submitting applications where they are, and scheduling the trades and materials around your dates.
On site to finish
Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.
What you can expect from us
Frequently asked questions
How much does a new roof cost?
Re-roofing a typical 3-bed semi costs £6,700–£14,500, including scaffolding, new membrane and battens. As a guide, allow roughly £70–£160 per square metre of roof plus fixed costs for scaffolding and waste. Concrete tiles sit at the lower end and natural slate at the top. Hips, valleys, chimneys and timber repairs add to the price. We confirm a fixed figure after inspecting the roof and loft.
Who do I deal with during the job?
One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.
How do I know if I need a new roof or just repairs?
A roof needs replacing when problems are widespread, not isolated. Signs include many slipped, cracked or porous tiles, sagging between rafters, daylight or damp in the loft, perished felt that crumbles to the touch and repeated leaks in different places. A few slipped tiles or a loose ridge can usually be repaired. We inspect from outside and inside the loft and tell you honestly which is needed.
What happens at the survey?
We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a new roof, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.
How long does a roof replacement take?
Re-roofing a typical semi-detached house takes around one to two weeks once scaffolding is up, depending on the roof's size, complexity and the weather. Smaller terraced roofs can take a few days. Scaffolding usually goes up a day or two before work starts and comes down once everything is inspected. We give you a programme and keep the roof weathertight overnight.
Nearby towns
From G60, G81, PA7 and PA8 to the edges of Erskine and on into Clydebank, Renfrew and Bearsden, we can arrange a site visit and a written quote for your project, planned around dates that work for you.