Warwickshire · Roofing & Cladding

Roof replacement in Bedworth

Typical time on site: 1–2 weeks on site, plus scaffolding time. Guide price in Bedworth: £6,900–£14,500 including VAT.

Pitched roof half re-tiled, with battens and membrane on the other half

Free survey in Bedworth

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A roof replacement, or re-roof, strips the old tiles or slates, battens and felt from a pitched roof and replaces them with a new breathable membrane, battens and covering, repairing timbers and renewing ridges, valleys and flashings at the same time.

Whatever type of house you own in Bedworth, we start by looking at how a new roof would fit it rather than offering a standard package. We cover CV12 and neighbouring places such as Nuneaton, Coventry and Hinckley. One named person looks after you from survey to handover, and nothing is booked until you hold our figure in writing, fixed for the work described.

Guide price
£6,900–£14,500 inc VAT
Time on site
1–2 weeks on site, plus scaffolding time
Postcodes
CV12
Planning rules
England
Local area
Warwickshire
Survey
Free, with a written quote

What should you budget for a new roof in Bedworth?

Budgeting for a new roof in Bedworth? The numbers below include VAT and are adjusted for the West Midlands, where costs are about 2% below the national guide. The headline range is £6,900–£14,500. Nothing is final until we have measured up at a free survey and agreed the specification with you.

Type of jobWhat it usually involvesGuide in Bedworth
Terraced house or bungalowA smaller pitched roof re-covered in concrete or clay tiles, including scaffolding.£4,900–£9,800
Typical semi-detachedA 3-bed semi re-roofed in concrete or clay tiles with new membrane, battens and leadwork.£6,900–£14,500
Detached or natural slateLarger or more complex roofs, or any roof finished in natural slate.£12,000–£24,500

Your price depends mostly on:

  • Roof area, pitch and the number of hips, valleys and dormers
  • Condition of rafters, fascias and other timbers
  • Chimneys, leadwork and roof windows to rework
  • Scaffolding, access and the height of the house

What do you get?

  • Survey of the covering, timbers, chimneys and loft ventilation
  • Scaffolding with edge protection, erected and removed
  • Breathable membrane and new treated battens
  • New tiles or slates, or sound originals refitted where suitable
  • Ridges, hips and verges dry-fixed or bedded, with new leadwork
  • Waste removal by skip and a clean site on completion
Clay plain tilesSmall traditional tiles that weather well and suit period and conservation-area homes.
Natural slateLong-lasting slate with a classic look, laid on a well-ventilated roof.
Fibre cement or synthetic slateA lighter, lower-cost alternative to natural slate with a similar appearance.
Dry-fix ridge and vergeMechanically fixed ridges and verges that need far less mortar upkeep.

Building in Bedworth

Stratford-upon-Avon and Warwick have timber-framed and Georgian buildings, and Leamington Spa is known for Regency stucco terraces and villas. Nuneaton and Bedworth have brick terraces from their mining and industrial past, Rugby mixes Victorian housing with large new estates, and southern villages near the Cotswolds use limestone and blue lias.

Regency and period homes may need render repairs, decorating and windows that suit conservation areas. Terraces suit loft conversions and extensions, and newer estate homes often take garage conversions and landscaping.

If your house in Bedworth fits one of these patterns, it helps us anticipate what a new roof will involve, though we always confirm the details on site.

Permissions for a new roof in Bedworth

Because Bedworth falls under England's rules, the guidance below is the version relevant to you. Before sending a price, we check your property's position with the council.

Re-roofing a house with similar materials does not usually need planning permission in England. Listed buildings and conservation areas may need consent if the covering changes.

Replacing more than a quarter of a roof’s covering counts as renovation under Building Regulations, so the work is notified and the roof insulation may need upgrading. Bats are protected across the UK; if they roost under roof tiles, soffits or fascias, work stops and a licensed ecologist advises before it restarts.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. Free site survey

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a new roof.

  2. Quote in writing

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a new roof.

  3. Dates and permissions

    Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.

  4. Finish and handover

    The work is carried out to the agreed specification, with floors and furniture protected and the site kept tidy. At the end we clean up, walk through the finished job with you and hand over any certificates.

Why homeowners choose us

Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Common questions

What happens if it rains during the work?

We strip the roof in sections and only remove as much covering as we can replace or protect the same day. New breathable membrane goes on straight after stripping, which keeps most rain out, and we sheet exposed areas at the end of each day and before forecast showers. If heavy rain or high winds are forecast, we pause work. The house is never left open.

How long will a new roof last?

A well-installed roof lasts for decades. Concrete tiles typically last around 50 years or more, clay tiles longer, and natural slate can last a century with proper upkeep. Lifespan depends on the quality of materials, fixings, ventilation and leadwork, and on how exposed the roof is. Keeping gutters clear and fixing slipped tiles quickly helps it reach its full life.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

How long will a new roof take?

On a typical home, allow 1–2 weeks on site, plus scaffolding time. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

How long does a roof replacement take?

Re-roofing a typical semi-detached house takes around one to two weeks once scaffolding is up, depending on the roof's size, complexity and the weather. Smaller terraced roofs can take a few days. Scaffolding usually goes up a day or two before work starts and comes down once everything is inspected. We give you a programme and keep the roof weathertight overnight.

Also covering areas around Bedworth

Coverage for Bedworth spans CV12. Close by, Nuneaton, Coventry and Hinckley are covered too, and the rest of our UK-wide area follows the same survey-then-quote process from start to finish.

Planning a new roof in Bedworth?

Want to know what a new roof would cost for your house in Bedworth? Our guide-price tool gives you a range, and a free survey turns it into a written quote.

Call freeFree quote