East Sussex · Extensions & Renovations

Single-storey extensions in Brighton

From the first visit to the final check, a single-storey extension in Brighton is planned and managed for you.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Brighton

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

For a homeowner in Brighton, planning a single-storey extension tends to begin with two questions: what will it cost, and how disruptive will it be? Our guide range is £39,000–£84,000 including VAT, and a typical job runs to 10–16 weeks on site. Both numbers firm up once we have seen the property, measured up and agreed exactly what is included.

Guide price
£39,000–£84,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
BN1, BN2, BN3 and BN41
Planning rules
England
Local area
Brighton and Hove
Survey
Free, with a written quote

How much does a single-storey extension cost in Brighton?

Use the table to gauge the cost of a single-storey extension in Brighton before we visit. Figures include VAT and are scaled for the South East, coming out about 12% above the national guide, which gives £39,000–£84,000 overall. After a free survey, you receive a fixed written price.

Type of jobWhat it usually involvesGuide in Brighton
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£24,500–£45,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£39,000–£84,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£78,000–£146,000

Your price depends mostly on:

  • Floor area, shape and number of corners
  • Roof type, rooflights, lanterns and the amount of glazing
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What’s included?

  • Groundworks, foundations and below-ground drainage
  • Cavity walls built and insulated to building regulations
  • Steel beams to open into the existing house
  • Electrics and plumbing by qualified trades, with certificates
  • Windows and external doors, including bifolds if chosen
  • Plastering, screed floor and internal doors
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.

Building in Brighton

Brighton and Hove are known for Regency stucco terraces and bow-fronted houses, alongside Victorian terraces climbing the hills. Lewes and Brighton have mathematical tiles and flint walls, Eastbourne has large Victorian and Edwardian villas, and Wealden villages use tile-hanging, weatherboarding and timber frames. Interwar suburbs and newer estates fill out most towns.

Seafront homes face salt-laden south-westerly winds and driving rain, while Wealden clay can shrink and swell, affecting extension foundations.

None of this holds for every street in Brighton, which is why we look at your actual house before pricing a single-storey extension rather than assuming from its age alone.

Permissions for a single-storey extension in Brighton

The notes below cover England, which is where Brighton sits. Rules change and every property is different, so we speak to the council before pricing your job.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. Free site survey

    Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.

  2. Quote in writing

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a single-storey extension.

  3. Dates and permissions

    With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Brighton property.

  4. On site to finish

    The work is carried out to the agreed specification, with floors and furniture protected and the site kept tidy. At the end we clean up, walk through the finished job with you and hand over any certificates.

How we work

Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Frequently asked questions

What does a typical extension build look like week by week?

A typical single-storey extension follows the same order: clearing the site and digging foundations, building walls up to roof level, then fitting the roof and windows to make it weathertight. Electrics, plumbing, insulation and plastering follow. The last stage is opening into the house, laying the screed and fitting doors and finishes. Building control inspects at key stages, and we book those visits for you.

Do I need an architect for an extension?

You need proper drawings for an extension, but not always a full architect service. A designer or architectural technician can produce planning and building regulations drawings, and a structural engineer provides beam and foundation calculations. If you already have drawings, we price from them. If not, we can arrange the drawings and calculations as part of the project so everything is coordinated from the start.

How long will a single-storey extension take?

On a typical home, allow 10–16 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a single-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

What is the Party Wall Act and does it apply to me?

The Party Wall etc. Act 1996 applies in England and Wales only. In England and Wales, it requires you to give notice to neighbours before certain work on or near a shared wall, such as digging foundations within 3m of their building and deeper than its footings. Neighbours can agree or appoint a surveyor. Scotland and Northern Ireland have no equivalent Act, though general rights still apply. We identify whether notices are needed during the survey.

Also covering areas around Brighton

We welcome enquiries from all BN1, BN2, BN3 and BN41 postcodes in Brighton, plus Hove, Portslade and Rottingdean. Each one gets the same survey at no charge and a written price fixed for the work described.

Planning a single-storey extension in Brighton?

Start with a free site survey for a single-storey extension in Brighton. You'll receive a written quote showing exactly what is included and how the payments are staged.

Call freeFree quote