A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.
Cambuslang sits within our coverage for a single-storey extension, as do neighbouring Rutherglen, Blantyre and High Blantyre. Before giving a price we want to see the property: the condition of what's there now, the access, and anything that might need extra work. The guide range for Scotland is £33,500–£72,000 including VAT, and your written quote will spell out exactly what that covers.
- Guide price
- £33,500–£72,000 inc VAT
- Time on site
- 10–16 weeks on site
- Postcodes
- G73
- Planning rules
- Scotland
- Local area
- South Lanarkshire
- Survey
- Free, with a written quote
What should you budget for a single-storey extension in Cambuslang?
No two jobs cost exactly the same, but the ranges below give a fair picture of a single-storey extension in Cambuslang. Pricing for Scotland runs about 4% below the national guide, and the overall guide is £33,500–£72,000 with VAT included. We'll confirm your figure after surveying the property for free.
| Type of job | What it usually involves | Guide in Cambuslang |
|---|---|---|
| Small extension (8–12m²) | A modest rear or side extension, such as a utility room or a slightly larger kitchen. | £21,000–£38,500 |
| Typical rear extension (15–25m²) | A kitchen-diner or family room with bifold doors and a rooflight or lantern. | £33,500–£72,000 |
| Large or wrap-around (30m² plus) | A wrap-around or wide rear extension, often with structural steelwork into the house. | £67,000–£125,000 |
Your price depends mostly on:
- Floor area, shape and number of corners
- Roof type, rooflights, lanterns and the amount of glazing
- Ground conditions, foundation depth and drains to divert
- Finishes, kitchen, flooring and heating specification
What does the job include in Cambuslang?
- Groundworks, foundations and below-ground drainage
- Flat or pitched roof, with rooflights or a lantern if specified
- Steel beams to open into the existing house
- Electrics and plumbing by qualified trades, with certificates
- Plastering, screed floor and internal doors
- Building control inspections and completion certificate
Building in Cambuslang
Lanarkshire mixes sandstone tenements and terraces in Hamilton, Motherwell, Airdrie and Coatbridge with former miners' rows and large post-war estates, many finished in roughcast. East Kilbride and Cumbernauld were developed as post-war new towns, and newer private estates surround most towns.
Roughcast homes commonly need re-rendering, window replacement and roof work. Semis and bungalows suit extensions and loft conversions, and new-town houses often take garage conversions and driveways.
In Cambuslang, as elsewhere in Lanarkshire, we take the building's age and construction into account before recommending anything, because both can change what is involved in a single-storey extension.
Planning and building rules in Cambuslang
England, Wales, Scotland and Northern Ireland each handle planning a little differently. Cambuslang comes under Scotland, covered below, and we raise any questions with the council before your quote is finalised.
In Scotland, Class 1A permitted development covers some single-storey extensions, within limits on depth, height and distance from boundaries, and not in conservation areas or on flats. Anything outside those limits needs planning permission from the council.
A building warrant from the council’s building standards service is usually needed before work starts, and a completion certificate is accepted at the end. There is no Party Wall Act in Scotland; work near a boundary is agreed with neighbours under general law.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
We look at the job
First, someone visits your home in Cambuslang to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.
Written quote
Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.
Getting ready
Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a single-storey extension are in place before the first day on site.
On site to finish
The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.
What you can expect from us
Common questions
Who do I deal with during the job?
One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.
Is the price fixed?
Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.
Do I need an architect for an extension?
You need proper drawings for an extension, but not always a full architect service. A designer or architectural technician can produce planning and building regulations drawings, and a structural engineer provides beam and foundation calculations. If you already have drawings, we price from them. If not, we can arrange the drawings and calculations as part of the project so everything is coordinated from the start.
What is the Party Wall Act and does it apply to me?
The Party Wall etc. Act 1996 applies in England and Wales only. In England and Wales, it requires you to give notice to neighbours before certain work on or near a shared wall, such as digging foundations within 3m of their building and deeper than its footings. Neighbours can agree or appoint a surveyor. Scotland and Northern Ireland have no equivalent Act, though general rights still apply. We identify whether notices are needed during the survey.
How long does a single-storey extension take to build?
A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.
Also covering areas around Cambuslang
From G73 to the edges of Cambuslang and on into Rutherglen, Blantyre and High Blantyre, we can arrange a site visit and a written quote for your project, planned around dates that work for you.