Lancashire · Extensions & Renovations

Single-storey extensions in Burnley

Single-storey extensions for homes in Burnley and nearby Nelson, Colne and Accrington, from survey to handover.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Burnley

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

Thinking about a single-storey extension in Burnley? We take charge of the whole project, co-ordinating every trade involved, and one person keeps you updated. Guide prices for the North West sit at £33,000–£71,000 including VAT, and a typical job takes 10–16 weeks on site. Your own figure depends on what the survey finds and the specification you settle on.

Guide price
£33,000–£71,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
BB10 and BB11
Planning rules
England
Local area
Lancashire
Survey
Free, with a written quote

How much does a single-storey extension cost in Burnley?

What should you budget for a single-storey extension in Burnley? Use the figures below as a starting point. Prices in the North West sit about 5% below the national guide, so the range here is £33,000–£71,000 including VAT. Your fixed price comes in writing once we've surveyed the property, at no charge.

Type of jobWhat it usually involvesGuide in Burnley
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£21,000–£38,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£33,000–£71,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£66,000–£124,000

What moves the price up or down:

  • Roof type, rooflights, lanterns and the amount of glazing
  • Ground conditions, foundation depth and drains to divert
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What do you get?

  • Cavity walls built and insulated to building regulations
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Electrics and plumbing by qualified trades, with certificates
  • Plastering, screed floor and internal doors
  • Building control inspections and completion certificate
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Building in Burnley

East Lancashire mill towns such as Burnley, Blackburn and Accrington have long rows of stone and brick terraces, while Preston is mostly red brick. Lancaster uses sandstone for its Georgian centre, Blackpool and the Fylde coast have guest-house terraces and many bungalows, and interwar and newer estates surround most towns.

Mill-town terraces commonly suit attic conversions, kitchen extensions and repointing. Bungalows on the coast often take loft rooms and porches, and stone properties may need lime pointing and roof repairs.

Building traditions across Lancashire also raise conservation and planning questions, so we check those for a single-storey extension in Burnley at the survey stage.

Permissions for a single-storey extension in Burnley

England, Wales, Scotland and Northern Ireland each handle planning a little differently. Burnley comes under England, covered below, and we raise any questions with the council before your quote is finalised.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. We look at the job

    First, someone visits your home in Burnley to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Written quote

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Booking the work

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a single-storey extension are in place before the first day on site.

  4. The work itself

    Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.

How we work

Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Questions about a single-storey extension in Burnley

How much does a single-storey extension cost?

A typical single-storey rear extension of 15–25m² costs £33,000–£71,000, built to a plastered finish ready for your kitchen and decoration. As a guide, allow roughly £1,600–£2,800 per square metre plus fixed costs for groundworks, steelwork and fees. Smaller extensions cost more per square metre. The kitchen, flooring and large glazed doors are usually the biggest extras. We confirm a fixed price for the agreed specification after the survey.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a single-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

Can we stay at home during the build?

Most people stay at home while we build a single-storey extension, because the new structure goes up outside before we break through. The disruptive part is usually the last few weeks, when we open into the house and fit the kitchen. We put up dust screens, keep a safe route through the house and agree a temporary kitchen setup if needed. Water and power are only off for short, planned periods.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

What does a typical extension build look like week by week?

A typical single-storey extension follows the same order: clearing the site and digging foundations, building walls up to roof level, then fitting the roof and windows to make it weathertight. Electrics, plumbing, insulation and plastering follow. The last stage is opening into the house, laying the screed and fitting doors and finishes. Building control inspects at key stages, and we book those visits for you.

Nearby towns

If your address falls within BB10 and BB11, we cover it. The same goes for neighbouring Nelson, Colne and Accrington, which we include alongside Burnley when arranging surveys and quotes.

Planning a single-storey extension in Burnley?

Start with a free site survey for a single-storey extension in Burnley. You'll receive a written quote showing exactly what is included and how the payments are staged.

Call freeFree quote