Leicestershire · Extensions & Renovations

Single-storey extensions in Coalville

Covering LE67 and the rest of Coalville. Guide price £33,500–£72,000 inc VAT, confirmed after a free survey.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Coalville

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

Planning a single-storey extension for a home in Coalville means making a handful of decisions about materials, layout, finish and timing. We help you work through them at a free survey, then confirm in writing what it will cost for the options you pick. Most projects of this type need 10–16 weeks on site, and we cover every LE67 address as well as the rest of Leicestershire.

Guide price
£33,500–£72,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
LE67
Planning rules
England
Local area
Leicestershire
Survey
Free, with a written quote

What should you budget for a single-storey extension in Coalville?

Here is how the guide price for a single-storey extension breaks down in Coalville. We start from national figures and adjust for the East Midlands, which comes out about 4% below the national guide. The resulting range, VAT included, is £33,500–£72,000, and a survey, at no cost to you, firms it up.

Type of jobWhat it usually involvesGuide in Coalville
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£21,000–£38,500
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£33,500–£72,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£67,000–£125,000

Expect these to shape the final quote:

  • Floor area, shape and number of corners
  • Roof type, rooflights, lanterns and the amount of glazing
  • Ground conditions, foundation depth and drains to divert
  • Finishes, kitchen, flooring and heating specification

What do you get?

  • Groundworks, foundations and below-ground drainage
  • Cavity walls built and insulated to building regulations
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Electrics and plumbing by qualified trades, with certificates
  • Windows and external doors, including bifolds if chosen
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Building in Coalville

Leicester has extensive Victorian red-brick terraces and interwar semis, with newer estates on the city's edges. Charnwood granite appears in walls and buildings in the north-west, Swithland slate on older roofs, and villages towards Rutland use ironstone and limestone. Loughborough, Hinckley and Market Harborough mix Victorian centres with post-war and recent housing.

A moderate, fairly dry Midlands climate, with winter frosts and clay soils that can move in dry summers.

So when we survey a Coalville property for a single-storey extension, the first step is working out how it was built and what has been changed since.

Do you need permission in Coalville?

For anyone in Coalville, the relevant framework is England's. The summary below is general, so we always contact the council about your address before putting a price in writing.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. We look at the job

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a single-storey extension, and photograph or measure anything the quote needs to reflect.

  2. Quote in writing

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a single-storey extension.

  3. Booking the work

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. On site to finish

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

How we work

Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Common questions

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

Is a flat roof or a pitched roof better on an extension?

A flat roof is quicker to build and usually costs less, gives a clean modern look and works well with a roof lantern. A pitched roof matches the main house, sheds water faster and allows a vaulted ceiling, but it costs more and its height can affect neighbours. Modern flat roofs in EPDM rubber or GRP last well when properly detailed. Planning rules on height can also decide the choice.

Do I need an architect for an extension?

You need proper drawings for an extension, but not always a full architect service. A designer or architectural technician can produce planning and building regulations drawings, and a structural engineer provides beam and foundation calculations. If you already have drawings, we price from them. If not, we can arrange the drawings and calculations as part of the project so everything is coordinated from the start.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a single-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

How long does a single-storey extension take to build?

A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.

Nearby towns

Addresses in LE67 are all covered for Coalville, along with Loughborough, Swadlincote and Earl Shilton close by. Give us your postcode when you get in touch and we will confirm the details.

Ready for a written price?

Planning a single-storey extension in Coalville? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.

Call freeFree quote