Single-storey extensions in Rutland

Typical time on site: 10–16 weeks on site. Guide price in Rutland: £33,500–£72,000 including VAT.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Rutland

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

Homes across Rutland vary a great deal, so we price a single-storey extension only after seeing the property. Our coverage takes in Oakham and the surrounding districts. As a guide, expect £33,500–£72,000 including VAT in the East Midlands; the final figure depends on size, materials and access. Any permissions are checked against the rules for England before we quote.

Guide price
£33,500–£72,000 inc VAT
Time on site
10–16 weeks on site
Planning rules
England
Price level
About 4% below the national guide
Towns listed
1
Survey
Free, with a written quote

Single-storey extensions prices in Rutland

Below is a breakdown of typical costs for a single-storey extension in Rutland. Because rates in the East Midlands are about 4% below the national guide, the overall guide comes to £33,500–£72,000, including VAT. Size, materials and access move the figure, and a free-of-charge survey settles it.

Type of jobWhat it usually involvesGuide in Rutland
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£21,000–£38,500
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£33,500–£72,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£67,000–£125,000

What moves the price up or down:

  • Floor area, shape and number of corners
  • Ground conditions, foundation depth and drains to divert
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What do you get?

  • Groundworks, foundations and below-ground drainage
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Electrics and plumbing by qualified trades, with certificates
  • Windows and external doors, including bifolds if chosen
  • Plastering, screed floor and internal doors
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Homes in Rutland

England's smallest historic county is largely limestone and ironstone villages, many with Collyweston stone-slate or thatched roofs. Oakham and Uppingham have Georgian and Victorian centres within conservation areas, and newer estates and smaller post-war developments have grown on the edges of both towns.

Stone properties commonly need lime pointing, stone-slate roof repairs and windows suited to conservation areas. Newer homes suit extensions, garage conversions, driveways and garden landscaping, and planning-sensitive design is often part of the brief.

Inland and fairly dry, with cold winters; higher ground around Rutland Water is more exposed to wind.

Planning and building rules in Rutland

For anyone in Rutland, the relevant framework is England's. The summary below is general, so we always contact the council about your address before putting a price in writing.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. A visit to your home

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a single-storey extension.

  2. Price and scope agreed

    The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.

  3. Booking the work

    Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.

  4. Finish and handover

    During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.

How we work

Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.

Frequently asked questions

Do you cover Oakham?

Yes. As well as Rutland, we cover Oakham and the rest of Rutland. Our coverage is UK-wide, so the process is the same wherever you are: a free site survey, a quote in writing that fixes the price for the agreed scope, and one point of contact while the work is planned and carried out.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

Is a flat roof or a pitched roof better on an extension?

A flat roof is quicker to build and usually costs less, gives a clean modern look and works well with a roof lantern. A pitched roof matches the main house, sheds water faster and allows a vaulted ceiling, but it costs more and its height can affect neighbours. Modern flat roofs in EPDM rubber or GRP last well when properly detailed. Planning rules on height can also decide the choice.

What is the Party Wall Act and does it apply to me?

The Party Wall etc. Act 1996 applies in England and Wales only. In England and Wales, it requires you to give notice to neighbours before certain work on or near a shared wall, such as digging foundations within 3m of their building and deeper than its footings. Neighbours can agree or appoint a surveyor. Scotland and Northern Ireland have no equivalent Act, though general rights still apply. We identify whether notices are needed during the survey.

How long does a single-storey extension take to build?

A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.

Towns in Rutland

Our coverage for a single-storey extension in Rutland includes the towns listed here. Each page explains guide costs, typical timings and the neighbouring places we also serve.