Somerset · Extensions & Renovations

Single-storey extensions in Burnham-on-Sea

From the first visit to the final check, a single-storey extension in Burnham-on-Sea is planned and managed for you.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Burnham-on-Sea

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

Thinking about a single-storey extension in Burnham-on-Sea? We take charge of the whole project, co-ordinating every trade involved, and one person keeps you updated. Guide prices for the South West sit at £35,500–£76,000 including VAT, and a typical job takes 10–16 weeks on site. Your own figure depends on what the survey finds and the specification you settle on.

Guide price
£35,500–£76,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
TA8
Planning rules
England
Local area
Somerset
Survey
Free, with a written quote

What should you budget for a single-storey extension in Burnham-on-Sea?

In Burnham-on-Sea, guide figures for a single-storey extension sit at £35,500–£76,000, VAT included. We set them using rates for the South West, currently about 2% above the national guide. The table shows what pushes a project towards either end of the range; your own price is set after a free survey.

Type of jobWhat it usually involvesGuide in Burnham-on-Sea
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£22,500–£41,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£35,500–£76,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£71,000–£133,000

The main things that change the figure:

  • Floor area, shape and number of corners
  • Ground conditions, foundation depth and drains to divert
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

Scope of the work

  • Cavity walls built and insulated to building regulations
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Electrics and plumbing by qualified trades, with certificates
  • Windows and external doors, including bifolds if chosen
  • Building control inspections and completion certificate
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Building in Burnham-on-Sea

Somerset's building stone varies widely: Bath stone in Bath, golden Ham stone around Yeovil, blue lias in villages on the Levels and Mendip stone in the north. Weston-super-Mare has Victorian villas and terraces, Taunton and Bridgwater have brick terraces and post-war estates, and new housing continues to spread around the larger towns.

The Somerset Levels are low and prone to flooding, coastal areas face Bristol Channel winds, and Exmoor is wet and exposed.

For a single-storey extension in Burnham-on-Sea, this means checking things like wall construction, roof structure and existing services before we put a figure on paper.

Planning and building rules in Burnham-on-Sea

Burnham-on-Sea is in England, so the planning and building rules set out below are the ones that apply. We confirm the details with the council before we quote.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. A visit to your home

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a single-storey extension.

  2. Price and scope agreed

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Getting ready

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a single-storey extension are in place before the first day on site.

  4. The work itself

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

What you can expect from us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Frequently asked questions

How long will a single-storey extension take?

On a typical home, allow 10–16 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Do I need planning permission for a single-storey extension?

Whether you need planning permission depends on the extension's size and height, how close it is to boundaries, your home's location, whether it is listed or in a conservation area, and which UK nation you live in. In England, many rear extensions up to 3m deep on a semi or terrace, or 4m on a detached house, can be built under permitted development. We check the rules that apply to your home before quoting.

Can we stay at home during the build?

Most people stay at home while we build a single-storey extension, because the new structure goes up outside before we break through. The disruptive part is usually the last few weeks, when we open into the house and fit the kitchen. We put up dust screens, keep a safe route through the house and agree a temporary kitchen setup if needed. Water and power are only off for short, planned periods.

Which postcodes in Burnham-on-Sea do you cover?

We cover TA8, along with the rest of Somerset. If your postcode is not listed, get in touch anyway: our coverage is UK-wide, and we can usually arrange a survey wherever you live. Enter your postcode in the guide-price tool or contact form and we will confirm.

Is a flat roof or a pitched roof better on an extension?

A flat roof is quicker to build and usually costs less, gives a clean modern look and works well with a roof lantern. A pitched roof matches the main house, sheds water faster and allows a vaulted ceiling, but it costs more and its height can affect neighbours. Modern flat roofs in EPDM rubber or GRP last well when properly detailed. Planning rules on height can also decide the choice.

Near Burnham-on-Sea

From TA8 to the edges of Burnham-on-Sea and on into Weston-super-Mare, Bridgwater and Clevedon, we can arrange a site visit and a written quote for your project, planned around dates that work for you.

Ready for a written price?

Arrange a visit to your home in Burnham-on-Sea, at no charge. We'll measure up for a single-storey extension, talk through the options and follow up with a fixed price in writing.

Call freeFree quote