A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.
Adwick le Street sits within our coverage for a single-storey extension, as do neighbouring Bentley, Doncaster and South Elmsall. Before giving a price we want to see the property: the condition of what's there now, the access, and anything that might need extra work. The guide range for Yorkshire and the Humber is £33,000–£70,000 including VAT, and your written quote will spell out exactly what that covers.
- Guide price
- £33,000–£70,000 inc VAT
- Time on site
- 10–16 weeks on site
- Postcodes
- DN5 and DN6
- Planning rules
- England
- Local area
- Doncaster
- Survey
- Free, with a written quote
How much does a single-storey extension cost in Adwick le Street?
Use the table to gauge the cost of a single-storey extension in Adwick le Street before we visit. Figures include VAT and are scaled for Yorkshire and the Humber, coming out about 6% below the national guide, which gives £33,000–£70,000 overall. After a free survey, you receive a fixed written price.
| Type of job | What it usually involves | Guide in Adwick le Street |
|---|---|---|
| Small extension (8–12m²) | A modest rear or side extension, such as a utility room or a slightly larger kitchen. | £20,500–£37,500 |
| Typical rear extension (15–25m²) | A kitchen-diner or family room with bifold doors and a rooflight or lantern. | £33,000–£70,000 |
| Large or wrap-around (30m² plus) | A wrap-around or wide rear extension, often with structural steelwork into the house. | £66,000–£122,000 |
What moves the price up or down:
- Floor area, shape and number of corners
- Ground conditions, foundation depth and drains to divert
- Steelwork needed to open into the existing house
- Finishes, kitchen, flooring and heating specification
What does the job include in Adwick le Street?
- Groundworks, foundations and below-ground drainage
- Cavity walls built and insulated to building regulations
- Flat or pitched roof, with rooflights or a lantern if specified
- Steel beams to open into the existing house
- Electrics and plumbing by qualified trades, with certificates
- Building control inspections and completion certificate
What are homes like around Adwick le Street?
Sheffield's housing climbs steep hillsides, with Victorian brick terraces, stone villas in the western suburbs and large interwar and post-war council estates. Barnsley, Rotherham and Doncaster have long rows of colliery-era brick terraces, post-war housing including some non-traditional construction, and newer estates continue to grow around Doncaster.
Terraces often suit loft conversions and rear extensions, and steep plots can call for retaining walls, steps and terraced patios. Older homes commonly need repointing, window replacement and roof work.
These patterns matter for a single-storey extension: older walls, roofs and floors in Adwick le Street can need different materials or extra preparation compared with newer homes.
Planning and building rules in Adwick le Street
England, Wales, Scotland and Northern Ireland each handle planning a little differently. Adwick le Street comes under England, covered below, and we raise any questions with the council before your quote is finalised.
In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.
Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
How does the job run?
A visit to your home
We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a single-storey extension, and photograph or measure anything the quote needs to reflect.
Written quote
We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.
Dates and permissions
Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.
Finish and handover
The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.
What you can expect from us
Frequently asked questions
How much does a single-storey extension cost?
A typical single-storey rear extension of 15–25m² costs £33,000–£70,000, built to a plastered finish ready for your kitchen and decoration. As a guide, allow roughly £1,600–£2,800 per square metre plus fixed costs for groundworks, steelwork and fees. Smaller extensions cost more per square metre. The kitchen, flooring and large glazed doors are usually the biggest extras. We confirm a fixed price for the agreed specification after the survey.
Can I stay at home during the work?
In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.
How long does a single-storey extension take to build?
A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.
What happens at the survey?
We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a single-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.
What does a typical extension build look like week by week?
A typical single-storey extension follows the same order: clearing the site and digging foundations, building walls up to roof level, then fitting the roof and windows to make it weathertight. Electrics, plumbing, insulation and plastering follow. The last stage is opening into the house, laying the screed and fitting doors and finishes. Building control inspects at key stages, and we book those visits for you.
Nearby towns
Adwick le Street and its DN5 and DN6 postcodes are part of our coverage. Homeowners in Bentley, Doncaster and South Elmsall can also book a free survey with us and receive a written price for their job.