Warwickshire · Extensions & Renovations

Single-storey extensions in Leamington Spa

Covering CV31 and CV32 and the rest of Leamington Spa. Guide price £34,500–£74,000 inc VAT, confirmed after a free survey.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Leamington Spa

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

Anyone planning a single-storey extension in Leamington Spa wants three things: a clear price, a realistic timetable and a tidy job. We publish a guide of £34,500–£74,000 including VAT for the West Midlands up front, explain that work normally takes 10–16 weeks on site, and confirm both in writing after a free survey of your property.

Guide price
£34,500–£74,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
CV31 and CV32
Planning rules
England
Local area
Warwickshire
Survey
Free, with a written quote

How much does a single-storey extension cost in Leamington Spa?

The table below shows guide prices for a single-storey extension in Leamington Spa. They are based on rates in the West Midlands, which run about 2% below the national guide, giving an overall range of £34,500–£74,000. All figures include VAT and are firmed up after a free site survey.

Type of jobWhat it usually involvesGuide in Leamington Spa
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£21,500–£39,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£34,500–£74,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£69,000–£127,000

The main things that change the figure:

  • Floor area, shape and number of corners
  • Ground conditions, foundation depth and drains to divert
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What’s included?

  • Groundworks, foundations and below-ground drainage
  • Cavity walls built and insulated to building regulations
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Windows and external doors, including bifolds if chosen
  • Plastering, screed floor and internal doors
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.

What are homes like around Leamington Spa?

Stratford-upon-Avon and Warwick have timber-framed and Georgian buildings, and Leamington Spa is known for Regency stucco terraces and villas. Nuneaton and Bedworth have brick terraces from their mining and industrial past, Rugby mixes Victorian housing with large new estates, and southern villages near the Cotswolds use limestone and blue lias.

Regency and period homes may need render repairs, decorating and windows that suit conservation areas. Terraces suit loft conversions and extensions, and newer estate homes often take garage conversions and landscaping.

Whatever era your Leamington Spa home dates from, we plan a single-storey extension around how it is actually built rather than a one-size-fits-all specification.

Permissions for a single-storey extension in Leamington Spa

For anyone in Leamington Spa, the relevant framework is England's. The summary below is general, so we always contact the council about your address before putting a price in writing.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. We look at the job

    Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.

  2. Written quote

    After the survey we send a quote for a single-storey extension that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.

  3. Dates and permissions

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a single-storey extension are in place before the first day on site.

  4. On site to finish

    During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.

Working with SK Home Improvements

Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Common questions

How long will a single-storey extension take?

On a typical home, allow 10–16 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

Is a flat roof or a pitched roof better on an extension?

A flat roof is quicker to build and usually costs less, gives a clean modern look and works well with a roof lantern. A pitched roof matches the main house, sheds water faster and allows a vaulted ceiling, but it costs more and its height can affect neighbours. Modern flat roofs in EPDM rubber or GRP last well when properly detailed. Planning rules on height can also decide the choice.

How much does a single-storey extension cost?

A typical single-storey rear extension of 15–25m² costs £34,500–£74,000, built to a plastered finish ready for your kitchen and decoration. As a guide, allow roughly £1,600–£2,800 per square metre plus fixed costs for groundworks, steelwork and fees. Smaller extensions cost more per square metre. The kitchen, flooring and large glazed doors are usually the biggest extras. We confirm a fixed price for the agreed specification after the survey.

What is the Party Wall Act and does it apply to me?

The Party Wall etc. Act 1996 applies in England and Wales only. In England and Wales, it requires you to give notice to neighbours before certain work on or near a shared wall, such as digging foundations within 3m of their building and deeper than its footings. Neighbours can agree or appoint a surveyor. Scotland and Northern Ireland have no equivalent Act, though general rights still apply. We identify whether notices are needed during the survey.

Also covering areas around Leamington Spa

Coverage for Leamington Spa spans CV31 and CV32. Close by, Warwick, Kenilworth and Coventry are covered too, and the rest of our UK-wide area follows the same survey-then-quote process from start to finish.

Talk to us about a single-storey extension

Considering a single-storey extension? Homeowners in Leamington Spa can request a survey and a fixed-price quote at no cost, or use the online guide-price tool to set a budget first.

Call freeFree quote