Single-storey extensions in Stourbridge

From the first visit to the final check, a single-storey extension in Stourbridge is planned and managed for you.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Stourbridge

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

For a homeowner in Stourbridge, planning a single-storey extension tends to begin with two questions: what will it cost, and how disruptive will it be? Our guide range is £34,500–£74,000 including VAT, and a typical job runs to 10–16 weeks on site. Both numbers firm up once we have seen the property, measured up and agreed exactly what is included.

Guide price
£34,500–£74,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
DY5, DY8 and DY9
Planning rules
England
Local area
Dudley
Survey
Free, with a written quote

Single-storey extensions prices in Stourbridge

Every figure below is a guide for a single-storey extension in Stourbridge, inclusive of VAT. Regional pricing for the West Midlands works out about 2% below the national guide, and the overall span is £34,500–£74,000. The survey costs you nothing, and after it we commit to a firm price for your specification in writing.

Type of jobWhat it usually involvesGuide in Stourbridge
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£21,500–£39,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£34,500–£74,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£69,000–£127,000

Your price depends mostly on:

  • Floor area, shape and number of corners
  • Roof type, rooflights, lanterns and the amount of glazing
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What’s included?

  • Groundworks, foundations and below-ground drainage
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Windows and external doors, including bifolds if chosen
  • Plastering, screed floor and internal doors
  • Building control inspections and completion certificate
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Homes in West Midlands

Red-brick Victorian and Edwardian terraces are common in the inner areas of Birmingham, Wolverhampton and the Black Country, ringed by large swathes of 1930s semis with bay windows and hipped roofs. You'll also find post-war council estates, some system-built blocks, Coventry's rebuilt centre and larger detached homes in Solihull and Sutton Coldfield.

An inland climate with regular winter frosts means freeze-thaw damage to soft brick and old mortar is a common reason for repointing and render repairs.

With that background in mind, here is how we typically handle a single-storey extension for homes in Stourbridge, from the first visit to the finished result.

Do you need permission in Stourbridge?

Stourbridge is in England, so the planning and building rules set out below are the ones that apply. We confirm the details with the council before we quote.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. A visit to your home

    First, someone visits your home in Stourbridge to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Quote in writing

    After the survey we send a quote for a single-storey extension that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.

  3. Getting ready

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. Build and hand over

    During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.

Why homeowners choose us

Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Single-storey extensions in Stourbridge: questions

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

Do I need planning permission for a single-storey extension?

Whether you need planning permission depends on the extension's size and height, how close it is to boundaries, your home's location, whether it is listed or in a conservation area, and which UK nation you live in. In England, many rear extensions up to 3m deep on a semi or terrace, or 4m on a detached house, can be built under permitted development. We check the rules that apply to your home before quoting.

Do I need planning permission in Stourbridge?

It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Stourbridge is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.

What is the Party Wall Act and does it apply to me?

The Party Wall etc. Act 1996 applies in England and Wales only. In England and Wales, it requires you to give notice to neighbours before certain work on or near a shared wall, such as digging foundations within 3m of their building and deeper than its footings. Neighbours can agree or appoint a surveyor. Scotland and Northern Ireland have no equivalent Act, though general rights still apply. We identify whether notices are needed during the survey.

Can we stay at home during the build?

Most people stay at home while we build a single-storey extension, because the new structure goes up outside before we break through. The disruptive part is usually the last few weeks, when we open into the house and fit the kitchen. We put up dust screens, keep a safe route through the house and agree a temporary kitchen setup if needed. Water and power are only off for short, planned periods.

Nearby towns

Coverage for Stourbridge spans DY5, DY8 and DY9. Close by, Brierley Hill, Kingswinford and Dudley are covered too, and the rest of our UK-wide area follows the same survey-then-quote process from start to finish.