West Yorkshire · Extensions & Renovations

Single-storey extensions in Morley

Guide price £33,000–£70,000 including VAT, typically 10–16 weeks on site, with a free site survey and a written fixed price.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Morley

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

Planning a single-storey extension for a home in Morley means making a handful of decisions about materials, layout, finish and timing. We help you work through them at a free survey, then confirm in writing what it will cost for the options you pick. Most projects of this type need 10–16 weeks on site, and we cover every LS27 and WF17 address as well as the rest of West Yorkshire.

Guide price
£33,000–£70,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
LS27 and WF17
Planning rules
England
Local area
Leeds
Survey
Free, with a written quote

What should you budget for a single-storey extension in Morley?

Every figure below is a guide for a single-storey extension in Morley, inclusive of VAT. Regional pricing for Yorkshire and the Humber works out about 6% below the national guide, and the overall span is £33,000–£70,000. The survey costs you nothing, and after it we commit to a firm price for your specification in writing.

Type of jobWhat it usually involvesGuide in Morley
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£20,500–£37,500
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£33,000–£70,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£66,000–£122,000

Expect these to shape the final quote:

  • Floor area, shape and number of corners
  • Roof type, rooflights, lanterns and the amount of glazing
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What do you get?

  • Groundworks, foundations and below-ground drainage
  • Cavity walls built and insulated to building regulations
  • Electrics and plumbing by qualified trades, with certificates
  • Windows and external doors, including bifolds if chosen
  • Plastering, screed floor and internal doors
  • Building control inspections and completion certificate
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Building in Morley

Leeds and Bradford are known for back-to-back and through terraces, many in sandstone or millstone grit, with stone-slate roofs on older properties. Halifax, Huddersfield and the Calder valley have mill-town stone terraces climbing steep hillsides, and interwar semis, post-war estates and newer housing surround the larger towns.

The Pennine hills bring high rainfall, wind and frost, and the Calder valley has a history of serious flooding.

With that background in mind, here is how we typically handle a single-storey extension for homes in Morley, from the first visit to the finished result.

Permissions for a single-storey extension in Morley

England, Wales, Scotland and Northern Ireland each handle planning a little differently. Morley comes under England, covered below, and we raise any questions with the council before your quote is finalised.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. A visit to your home

    First, someone visits your home in Morley to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Quote in writing

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Getting ready

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. The work itself

    Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.

Why homeowners choose us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Coverage across the UKWe take on projects in England, Wales, Scotland and Northern Ireland, and plan each one under the rules for the nation it is in.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Common questions

How long will a single-storey extension take?

On a typical home, allow 10–16 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Is a flat roof or a pitched roof better on an extension?

A flat roof is quicker to build and usually costs less, gives a clean modern look and works well with a roof lantern. A pitched roof matches the main house, sheds water faster and allows a vaulted ceiling, but it costs more and its height can affect neighbours. Modern flat roofs in EPDM rubber or GRP last well when properly detailed. Planning rules on height can also decide the choice.

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

How long does a single-storey extension take to build?

A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.

Can we stay at home during the build?

Most people stay at home while we build a single-storey extension, because the new structure goes up outside before we break through. The disruptive part is usually the last few weeks, when we open into the house and fit the kitchen. We put up dust screens, keep a safe route through the house and agree a temporary kitchen setup if needed. Water and power are only off for short, planned periods.

Nearby towns

From LS27 and WF17 to the edges of Morley and on into Batley, Dewsbury and Heckmondwike, we can arrange a site visit and a written quote for your project, planned around dates that work for you.

Planning a single-storey extension in Morley?

Considering a single-storey extension? Homeowners in Morley can request a survey and a fixed-price quote at no cost, or use the online guide-price tool to set a budget first.

Call freeFree quote